Federal contract award
W909MY16C0007
IGF::OT::IGF ENGINEERING MANUFACTURING AND DEVELOPMENT (EMD) OF THE 3GEN FLIR B-KIT AND AN OPTION FOR THE B-KIT MANUFACTURING AND PRODUCTION READINESS SUPPORT.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W6QK ACC-APG CONT CT WASH OFC |
| NAICS | 334511 — Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing |
| PSC | AD94 — OTHER DEFENSE - ENGINEERING DEVELOPMENT |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS INCENTIVE FEE |
| Obligations | $129.3M |
| Current contract value | $135.9M |
| Potential contract value / ceiling | $146.0M |
| Start date | Mar 16, 2016 |
| Current end date | Jan 6, 2022 |
| Potential end date | Mar 3, 2031 |
| Latest award activity | Mar 3, 2025 |
| Source loaded | Aug 15, 2026 |
Funding and modification history
Showing the latest 81 of 81 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 11, 2026 | P00080 | $-192.9K | ORDER TO PROVIDE THE ARMY THE CAPABILITY TO REPROGRAM LEGACY ADVANCED VIDEO PROCESSOR (AVP) CIRCUIT CARD ASSEMBLIES (CCAS) |
| Mar 3, 2025 | P00079 | $0 | ORDER TO PROVIDE THE ARMY THE CAPABILITY TO REPROGRAM LEGACY ADVANCED VIDEO PROCESSOR (AVP) CIRCUIT CARD ASSEMBLIES (CCAS) |
| Sep 15, 2022 | P00078 | $0 | ADMIN CHANGES TO ULO |
| Sep 13, 2022 | P00077 | $-509.0K | DEOBLIGATION OF EXCESS FUNDS. |
| Sep 8, 2022 | P00076 | $0 | TRANSFER GOVERNMENT FURNISHED PROPERTY (GFP) TO DELIVERY ORDER W15P7T-19-D-0157/W909MY19F0054 |
| May 4, 2022 | P00075 | $0 | GFP TRANSFER OF DCBS |
| Nov 29, 2021 | P00074 | $0 | POP EXTENSION TO 06 JANUARY 2022 |
| Sep 30, 2021 | P00073 | $-24.1K | RE-ALIGN THE CONTRACT CEILING DUE TO A COST OVERRUN INCURRED BY THE CONTRACTOR, INCORPORATE DE-SCOPE OF CLIN 0014, TRANSFER GFP, AND EXTEND THE PERIOD OF PERFORMANCE OF CLINS 0001, 0009, 0010, 0011, 0012, 0014, 0015, 0016, 0017, 0018 AND 0019 TO 30 NOVEMBER 2021. |
| Sep 8, 2021 | P00072 | $750.0K | MOD TO INCREASE THE CONTRACT CEILING DUE TO A COST OVERRUN INCURRED BY THE CONTRACTOR AND PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $750,000.00 UNDER CLIN 0014 IN ORDER TO ALLOW PERFORMANCE TO CONTINUE PENDING SETTLEMENT OF THE COST OVERRUN. |
| Aug 23, 2021 | P00071 | $499.6K | INC FUNDING AND POP EXTENSION MOD |
| Aug 3, 2021 | P00070 | $500.0K | PARTIAL FUNDING OF $500,000 UNDER CLIN 14 FOR COST OVERRUN |
| Jul 23, 2021 | P00069 | $1.1M | THE PURPOSE OF THIS MODIFICATION P00069 IS TO REALIGN CEILING FROM CLIN 0001 TO CLIN 0014, INCREASE THE CEILING FOR CLIN 0014, AND PROVIDE INCREMENTAL FUNDING UNDER CLIN 0014 DUE TO A COST OVERRUN. |
| Apr 30, 2021 | P00068 | $1.6M | ODIFICATION IS TO INCREASE THE CONTRACT CEILING DUE TO A COST OVERRUN INCURRED BY THE CONTRACTOR, PROVIDE INCREMENTAL FUNDING, AND EXTEND THE PERIOD OF PERFORMANCE OF CLINS 0001 AND 0014 TO 31 AUGUST 2021 |
| Apr 2, 2021 | P00067 | $959.6K | MODIFICATION TO INCORPORATE THREE (3) ECPS, UPDATE STATEMENT OF WORK (SOW), EXTEND POP FOR CLINS 0009, 0010, 0011, 0015, 0018 & 0019, ADD TELECOMMUNICATIONS CLAUSE FAR 52.204-25, PROVIDE INCREMENTAL FUNDING UNDER CLIN 0001 AND 0014 |
| Feb 23, 2021 | P00066 | $2.1M | INCREMENTAL FUNDING FOR CLIN 0001 |
| Jan 28, 2021 | P00065 | $2.3M | INCREMENTAL FUNDING $2,300,001.00 FOR CLIN 0001 |
| Jan 8, 2021 | P00064 | $2.2M | HIS MODIFICATION IS TO INCREASE THE CONTRACT CEILING DUE TO A COST OVERRUN INCURRED BY THE CONTRACTOR, DE-OBLIGATE EXCESS FUNDING, PROVIDE INCREMENTAL FUNDING, AND EXTEND THE PERIOD OF PERFORMANCE OF CLINS 0001 AND 0014 TO 30 JUNE 2021. |
| Nov 24, 2020 | P00063 | $1.9M | THIS MODIFICATION IS TO DE-OBLIGATE FUNDS FROM CLIN 0001 AND THEN RE-OBLIGATE FUNDS TO CORRECT LINE OF ACCOUNTING. ADDITIONALLY, FUNDS IN THE AMOUNT OF $1,894,970.10 HAVE BEEN OBLIGATED TO FULLY FUND CLIN 0001. |
| Oct 22, 2020 | P00062 | $1.5M | ADDING FUNDING TO SUPPORT CLIN 0001 DURING COST OVERRUN NEGOTIATION |
| Sep 17, 2020 | P00061 | $1.2M | THE PURPOSE OF THIS MODIFICATION P00061 IS TO INCREASE THE CEILING DUE TO A COST OVERRUN AND PROVIDE INCREMENTAL FUNDING UNDER CLIN 0001. |
| Jul 31, 2020 | P00060 | $-288.1K | DE-SCOPE 20 TRUS |
| Jul 16, 2020 | P00059 | $4.9M | INCREMENTAL FUNDING MODIFICATION |
| Jun 4, 2020 | P00058 | $5.2M | INCREASE THE CONTRACT CEILING DUE TO AN OVERRUN INCURRED BY THE CONTRACTOR, PROVIDE INCREMENTAL FUNDING TO CLINS 0001, ADD CONSIDERATIONS AGREEMENT, ADD FILTER WHEEL REQUIREMENT, INCORPORATE DATA RIGHTS ASSERTIONS, AND ACCEPT GOVERNMENT FURNISHED PROPERTY (GFP) FROM RAYTHEON CONTRACT W909MY-15-C-0006. |
| Apr 15, 2020 | P00057 | $1.5M | INCREASE FUNDING AND CEILING DUE TO COST OVERRUN |
| Apr 3, 2020 | P00056 | $0 | MODIFICATION TO UPDATE THE DD254 - ATTACHMENT 0002 |
| Feb 20, 2020 | P00055 | $1.1M | INCREMENTAL FUNDING $1,088,244.00 |
| Jan 30, 2020 | P00054 | $219.3K | INCORPORATING EQUIPMENT LOAN AGREEMENT AND 3 ENGINEERING CHANGE PROPOSALS. |
| Jan 17, 2020 | P00053 | $3.5M | INCREMENTAL FUNDING AND ADDING ECPS 159 AND 161 |
| Dec 26, 2019 | P00052 | $7.0M | INCREMENTAL FUNDING MODIFICATION |
| Dec 12, 2019 | P00051 | $5.5M | INCREMENTAL FUNDING OF $5,531,164.50 TO CLIN 001 AND CLIN 014 |
| Dec 6, 2019 | P00050 | $160.0K | MODIFICATION TO APPLY INCREMENTAL FUNDING MOD 51 |
| Nov 7, 2019 | P00049 | $1.9M | INCREMENTAL FUNDING MODIFICATION |
| Oct 25, 2019 | P00048 | $0 | HARDWARE DELIVERY TRACKING MOD |
| Sep 26, 2019 | P00047 | $4.3M | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDS UNDER CLIN 0001 AND 0014 |
| Sep 10, 2019 | P00046 | $2.2M | THIS MOD ADDS INCREMENTAL FUNDS AND INCORPORATES ECP PM07-137 ENTITLED "UPDATE 3GEN B-KIT PERFORMANCE SPECIFICATION DOCUMENT", ECP PM07-144 ENTITLED "UPDATE 3GEN FLIR DEWAR COOLER BENCH (DCB) INTERFACE CONTROL DOCUMENT", ECP PM07-145 ENTITLED "UPDATE 3GEN FLIR DCB PERFORMANCE SPECIFICATION DOCUMENT", AND ECP PM07-146 ENTITLED "CLASSIFIED 3GEN DCB PERFORMANCE SPECIFICATION DOCUMENT UPDATE" |
| Jun 28, 2019 | P00045 | $0 | INCREASING THE CEILING DUE TO AN OVERRUN. |
| Jun 24, 2019 | P00044 | $4.8M | CHANGE ORDER FOR THE FOLLOWING: ACCELERATION NECESSARY FOR DROPS 1, 2 AND 3 AND LOT 1 AND 2 DELIVERIES PROVIDE THE QUANTITY OF 122 (32 B-KITS, 81 TRUS) PROPOSAL PREP REIMBURSEMENT COSTS FOR CHANGER ORDER PROPOSAL |
| May 10, 2019 | P00042 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE UPDATES TO THE STATEMENT OF WORK AND TO REIMBURSE PROPOSAL PREPARATION EXPENSES. |
| May 10, 2019 | P00043 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE AN UPDATED STATEMENT OF WORK AND MULTIPLE ECPS INTO THE CONTRACT. |
| Apr 10, 2019 | P00041 | $222.9K | THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THREE (3) ECPS INTO THE CONTRACT. |
| Feb 27, 2019 | P00040 | $0 | CLAUSES FAR 52.215-13, FAR 52.215-13, AND FAR 52.230-2 HAVE BEEN UPDATED TO REFLECT THE THRESHOLDS LISTED IN CLASS DEVIATION FOR OBTAINING CERTIFIED COST AND PRICING DATA ON JULY 2018, TRACKING NUMBER: 2018-O0015 |
| Jan 31, 2019 | P00039 | $4.8M | MODIFICATION TO ADD INCREMENTAL FUNDING TO CLIN 0001. |
| Jan 11, 2019 | P00038 | $0 | MODIFICATION TO INCORPORATE 21 TRU TO PLATFORM EMULATORS INTO THE CONTRACT. |
| Dec 7, 2018 | P00037 | $0 | MODIFICATION TO INCORPORATE MULTIPLE ENGINEERING CHANGE PROPOSAL (ECP) UPDATES INTO THE CONTRACT. |
| Nov 28, 2018 | P00036 | $5.0M | MODIFICATION TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $5,001,000.00 TO CLIN 000106. |
| Nov 20, 2018 | P00035 | $11.4M | MODIFICATION TO ADD INCREMENTAL FUNDING IN THE AMOUNT OF $11,400,000.00 TO CLIN 0001 VIA SLIN 000107 |
| Nov 9, 2018 | P00034 | $2.6M | MODIFICATION TO ADD INCREMENTAL FUNDING |
| Aug 16, 2018 | P00033 | $3.5M | INCREMENTAL FUNDING FOR SLIN 000105 IN THE AMOUNT OF $3,500,000.00 |
| Aug 14, 2018 | P00032 | $0 | MODIFICATION TO CORRECT THE NARRATIVE OF THE PREVIOUS MODIFICATION P00031. |
| Jul 23, 2018 | P00031 | $0 | MODIFICATION TO ADD A NO-COST ENGINEERING CHANGE PROPOSAL IN CONTRACT. |
| Jun 29, 2018 | P00030 | $4.3M | MODIFICATION TO INCORPORATE ECP 079&080 AND PROVIDE INCREMENTAL FUNDING. |
| Jun 5, 2018 | P00029 | $4.5M | INCREMENTAL FUNDING TO SLIN 000105 |
| Mar 22, 2018 | P00028 | $2.0M | INCREMENTAL FUNDING FOR SLIN 000105 |
| Mar 1, 2018 | P00027 | $6.6M | INCREMENTAL FUNDING FOR CLIN 0001 |
| Feb 1, 2018 | P00026 | $0 | MOD TO ADD ECP PM07-074 TO CONTRACT |
| Jan 30, 2018 | P00024 | $0 | MOD TO ADD ECPS TO CONTRACT |
| Jan 30, 2018 | P00025 | $1.9M | MOD TO ADD INCREMENTAL FUNDING TO CLIN 0001 |
| Jan 12, 2018 | P00023 | $0 | MOD TO ADD INCREMENTAL FUNDING TO CLIN 0001 |
| Jan 11, 2018 | P00022 | $500.0K | MOD TO ADD NO COST ENGINEERING CHANGE PROPOSAL TO THE CONTRACT |
| Dec 5, 2017 | P00021 | $0 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE ECP TO THE CONTRACT. |
| Nov 16, 2017 | P00020 | $1.5M | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FOR INCREMENTAL FUNDING. |
| Nov 8, 2017 | P00019 | $0 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE A CHANGE ORDER TO REBASELINE THE CONTRACT. |
| Oct 19, 2017 | P00018 | $2.1M | IGF::OT::IGF THIS MODIFICATION PROVIDES FOR INCREMENTAL FUNDING. |
| Sep 29, 2017 | P00017 | $0 | IGF::OT::IGF THIS MODIFICATION INCORPORATES GOVERNMENT FURNISHED PROPERTY TO THE CONTRACT. |
| Sep 28, 2017 | P00016 | $115.6K | IGF::OT::IGF INCREMENTAL FUNDING FOR SLIN 000104 |
| Sep 15, 2017 | P00015 | $1.0M | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE INCREMENTAL FUNDING FOR THE CONTRACT. |
| Sep 14, 2017 | P00014 | $-280.0K | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE EXCESS FUNDING. |
| Sep 8, 2017 | P00013 | $500.0K | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FOR INCREMENTAL FUNDING TO THE CONTRACT. |
| Jun 30, 2017 | P00012 | $3.0M | IGF::OT::IGF MODIFICATION TO PROVIDE INCREMENTAL FUNDING. |
| Jun 15, 2017 | P00011 | $0 | IGF::OT::IGF MODIFICATION TO CANCEL STOP WORK ORDER ISSUED UNDER MODIFICATION P00004. |
| Jun 8, 2017 | P00010 | $2.5M | IGF::OT::IGF MODIFICATION TO PROVIDE INCREMENTAL FUNDING FOR CLIN 0001. |
| May 19, 2017 | P00009 | $0 | IGF::OT::IGF MODIFICATION TO UPDATE CDRL A003 AND THE STATEMENT OF WORK |
| May 11, 2017 | P00008 | $1.1M | IGF::OT::IGF MODIFICATION TO PROVIDE FOR INCREMENTAL FUNDING FOR CLIN 0001. |
| Mar 24, 2017 | P00006 | $746.3K | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION TO REVISE THE STATEMENT OF WORK, TO INCREASE THE LEVEL OF EFFORT OF THE CONTRACT. |
| Mar 24, 2017 | P00007 | $0 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO MAKE UPDATES TO THE STOP WORK ORDER ISSUED UNDER MODIFICATION P00004. |
| Mar 23, 2017 | P00005 | $1.5M | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION TO PROVIDE INCREMENTAL FUNDING. |
| Mar 20, 2017 | P00004 | $0 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO ISSUE A PARTIAL STOP WORK ORDER TO THE CONTRACTOR IN ACCORDANCE WITH FAR 52.242-15, ALT I |
| Feb 9, 2017 | P00003 | $0 | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO ADD CLINS TO ACCOUNT FOR TRANSFER AND DELIVERY OF CONTRACTOR ACQUIRED PROPERTIES UNDER CONTRACT. |
| Nov 23, 2016 | P00002 | $1.7M | IGF::OT::IGF THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO PROVIDE FOR INCREMENTAL FUNDING TO CLIN 0001 OF THE CONTRACT. |
| Sep 14, 2016 | P00001 | $1.1M | IGF::OT::IGF THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE FOR INCREMENTAL FUNDING TO CLIN 0001 OF THE CONTRACT. |
| Mar 15, 2016 | 0 | $7.2M | IGF::OT::IGF ENGINEERING MANUFACTURING AND DEVELOPMENT (EMD) OF THE 3GEN FLIR B-KIT AND AN OPTION FOR THE B-KIT MANUFACTURING AND PRODUCTION READINESS SUPPORT. |
Estimated positioning window
Mar 3, 2030 – Sep 3, 2030
40/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 40/100. Available recorded signals: 35 points.
- Contract end 2031-03-03 (1583 days from calculation)
- +5 points
- 2 historical awards in this buyer and category group
- +10 points
- 81 recorded award transactions
- +10 points
- Latest award action: 2025-03-03
- +0 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Verify whether remaining options may extend performance beyond the current end date.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.