Federal contract award

W911KB19C0001

LRDR POWER PLANT (LPP) CONSTRUCTION

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW2SN ENDIST ALASKA
NAICS237130 — Power and Communication Line and Related Structures Construction
PSCY1BC — CONSTRUCTION OF RADAR AND NAVIGATIONAL FACILITIES
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$142.5M
Current contract value$142.5M
Potential contract value / ceiling$142.5M
Start dateMar 8, 2019
Current end dateOct 18, 2022
Potential end dateOct 18, 2022
Latest award activityMay 6, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 68 of 68 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 6, 2026P00067$52.5KCONTRACT FOR CLR039C, LRDR POWER PLANT (LPP) AT CLEAR AFS, ALASKA REFERENCE NO. R0006800063 BREAKER AND RELAY PROTECTION SETTINGS
Mar 26, 2026P00066$108.5KW911KB19C0001, CLR039C, LRDR POWER PLANT (LPP), MODIFICATION P00066, CR#64 LEVEL TRANSMITTER REPLACEMENT-PILOT REFERENCE NO. R00067
Feb 12, 2026P00065$445.6KW911KB19C0001, CLR039C, LRDR POWER PLANT (LPP), MODIFICATION P00065, CR#54-2 (POST BOD INTEGRATION SUPPORT)
Aug 20, 2025P00064$793.2KCLR039C LPP P00064 R00065 CR00062- NIU INTEGRATION
Aug 19, 2025P00063$915.0KPOWER PLANT (LPP) - CHANGE P00063
May 1, 2025P00062$299.1KCLR039C LRDR POWER PLANT REA FOR COVID-19 SHUTDOWN DELAYS UNDER CARES ACT.
Apr 30, 2025A00001$45.1KW911KB19C0001, CLR039C, POWER PLANT (LPP), CP#3, CLEAR SFS, ALASKA CR#60 (HEMP SHIELDED CABINET REPAIR), MOD A00001
Sep 10, 2024P00061$249.4KMCF DAY TANK PUMP AND BACKFLOW PREVENTER
Dec 20, 2023P00060$245.6KNETWORK GATEWAYS AND BULK TANK FUEL VALVE
Nov 21, 2023P00059$2.4MREPLACE ETHERNET SWITCHES PART 2
Jul 15, 2022P00058$225.0KPOST BOD INTEGRATION SUPPORT
May 20, 2022P00057$-48.0KDELETE CLIN 0010. THIS MODIFICATION INCLUDES A CORRECTION TO AN ERROR MADE ON P00056
May 13, 2022P00056$-18.0KDELETE CLIN 0009 (UNSUITABLE SOILS)
Mar 30, 2022P00055$225.0KREPLACE ETHERNET SWITCHES
Mar 14, 2022P00054$32.0KRADAR STATUS POINTS
Mar 10, 2022P00053$3.2MGENERATOR COOLANT AND VENT PIPING REWORK
Dec 17, 2021P00051$0OPENING 106A & EXPOSED PLYWOOD
Dec 17, 2021P00052$0CHANGES IN RELAY SETTINGS
Oct 7, 2021P00050$48.4KPARTIAL SUSPENSION OF WORK - FUEL SYSTEM
Sep 15, 2021P00049$156.2K10" GLYCOL CHILLED WATER PIPING REVISION
Aug 19, 2021P00048$250.0KGENERATOR COOLANT AND VENT PIPING REWORK
Jul 1, 2021P00047$30.4KFIREWORKS PROGRAMMING
Jun 28, 2021P00046$42.1KCORROSION PROTECTION AND FIRESTOPPING
Jun 24, 2021P00045$25.3KDGE 7L BLACK START
Jun 15, 2021P00044$50.0K10IN GLYCOL CHILLED WATER PIPING REVISION CI-0048-1
May 28, 2021P00043$113.6KLOOP ROAD ASPHALT PATCHES
May 26, 2021P00041$41.3KCORROSION PROTECTION EXHAUST TOWER
May 26, 2021P00042$568.5KBULK FUEL TANK SEISMIC REA
May 21, 2021P00038$117.4KDIESEL GENERATOR EXHAUST PIPE SUPPORT
May 21, 2021P00039$50.7KCMU HILTI BOLT EMBEDMENT AND LINK FLOOR
May 21, 2021P00040$13.4KDECONFLICT PCMS IP ADDRESSES
May 20, 2021P00037$145.6KDH GLYCOL PIPE BRACE/FUEL FLOW INDICATOR
May 17, 2021P00036$224.1KMISSION CRITICAL-1 DUCT BRACING
May 14, 2021P00035$63.8KMOVE TEMPORARY TENT SHELTER
May 11, 2021P00034$785.9KGENERATOR CRANKCASE VENTILATION - P & I
May 10, 2021P00033$86.6KPNEUMATIC HEMP DOOR 107A
May 7, 2021P00032$199.9KREDUNDANT CPU MODULE PAIR
May 6, 2021P00025$56.5KPOWER PLANT (LPP) - FIRST RESPONDER ALMR RADIO SYSTEM
May 6, 2021P00026$91.2KPOWER PLANT (LPP) - LPP ROOF BIRD MITIGATION
May 6, 2021P00027$31.3KPOWER PLANT (LPP) - FINISHED FLOOR AT DIAGONAL TUBE BRACE
May 6, 2021P00028$82.5KPOWER PLANT (LPP) - FUEL TANK SEISMIC PART 2
May 6, 2021P00029$11.4KPOWER PLANT (LPP) - SEQUENCE OF OPERATIONS
May 6, 2021P00030$209.8KPOWER PLANT (LPP)- PROFINET REMOTE I/O & CONTROLLER
May 6, 2021P00031$23.8KPOWER PLANT (LPP)
May 5, 2021P00019$0POWER PLANT (LPP) - COVID-19 CONTRACT TIME EXTENSION, NO CHANGE TO CONTRACT PRICE, DRAWINGS, OR SPECIFICATIONS
May 5, 2021P00020$40.0KPOWER PLANT (LPP) - PART ONE OF FUEL TANK SEISMIC MODIFICATION
May 5, 2021P00021$10.6KPOWER PLANT (LPP) - INSTALL MAINTENANCE ACCESS HATCHES ON EACH ROOF DRAIN
May 5, 2021P00022$8.9KPOWER PLANT (LPP) - PROVIDE AND INSTALL A MONORAIL SYSTEM WITH MANUAL HOIST OVER FUEL PUMP AREA
May 5, 2021P00023$17.2KPOWER PLANT (LPP) - DAY TANK PIPE SUPPORTS
May 5, 2021P00024$41.2KPOWER PLANT (LPP) - NON-STRUCTURAL SEISMIC NAMEPLATE
May 4, 2021P00017$23.3KPOWER PLANT (LPP)CHANGE ORDER FOR EXTERIOR FOUNDATIONS FOR 8TH GENERATOR
May 4, 2021P00018$18.4KPOWER PLANT (LPP) - DAY TANK ROOM STRUCTURAL STEEL
Jul 14, 2020P00014$71.0KLRDR POWER PLANT (LPP), MODIFICATION NO. P00014, CHANGE ITEM NO. 00020 (ROOF EXPANSION JOINT)
Jul 14, 2020P00015$25.5KLRDR POWER PLANT (LPP), MODIFICATION NO. P00015, CHANGE ITEM NO. 00019 (RADIATOR PIPE SUPPORT FOUNDATIONS)
Jul 14, 2020P00016$521.7KLRDR POWER PLANT (LPP), MODIFICATION NO. P00016, CHANGE ITEM NO. 00005-2 (00005-2 DISTRICT HEAT&ELECTRIC DUCTBANK-PART 2)
Jun 11, 2020P00013$140.6KLRDR POWER PLANT (LPP), MODIFICATION NO. P00013, CHANGE ITEM NO. 00013 (WEATHER VESTIBULE ROOF DRAINS)
Jun 8, 2020P00012$8.8KLRDR POWER PLANT (LPP), MODIFICATION NO. P00012, CHANGE ITEM NO. 00010 (VESTIBULE AREA SPRINKLER SYSTEMS)
May 29, 2020P00011$132.8KLRDR POWER PLANT (LPP), MODIFICATION NO. P00011, CHANGE ITEM NO. 00008 (LIGHTNING MASTS FOUNDATIONS)
Apr 15, 2020P00010$59.1KLRDR POWER PLANT (LPP), MODIFICATION NO. P00009, CHANGE ITEM NO. 00004 (STRUCTURAL STEEL SHOP DRAWING REVISIONS)
Apr 14, 2020P00009$6.8KLRDR POWER PLANT (LPP, MODIFICATION NO. P00008, CHANGE ITEM NO. 00012 (CORIOLIS METER)
Dec 20, 2019P00007$4.4KLRDR POWER PLANT (LPP), MODIFICATION NO. P00007, CHANGE ITEM NO. 00009 (INDUSTRIAL POE INJECTORS)
Dec 6, 2019P00006$43.5KLRDR POWER PLANT (LPP), MODIFICATION NO. P00006, CHANGE ITEM NO. 00007 (TANK OVERFILL PREVENTION VALVE)
Nov 4, 2019P00005$-298.4KLRDR POWER PLANT (LPP), MODIFICATION NO. P00005, CHANGE ITEM NO. 00002 (RMF/CYBER SECURITY CHANGES)
Oct 2, 2019P00004$25.0KPOWER PLANT (LPP), MODIFICATION NO. P00004, CHANGE ITEM NO. 00006-1 (GENERATOR CRANKCASE VENTILATION-PART 1)
Sep 25, 2019P00003$250.0KPOWER PLANT (LPP), MODIFICATION P00003, CHANGE ITEM NO. 00005-1 (DISTRICT HEAT&ELECTRIC DUCTBANK-PART 1)
Aug 5, 2019P00002$0POWER PLANT (LPP), MODIFICATION P00002, CHANGE ITEM NO. 00003 (REVISIONS TO CC FAR 52.211-10 AND 12.
Aug 2, 2019P00001$4.4KPOWER PLANT (LPP), MODIFICATION NO. P00001, CHANGE ITEM NO. 00001 - SHARED PARTNERING COST
Mar 8, 20190$128.7MLRDR POWER PLANT (LPP) CONSTRUCTION