Federal contract award
W911KB22C0012
JBE054 RUNWAY EXTENSION, JBER, ALASKA
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W2SN ENDIST ALASKA |
| NAICS | 237310 — Highway, Street, and Bridge Construction |
| PSC | Y1BD — CONSTRUCTION OF AIRPORT RUNWAYS AND TAXIWAYS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $395.6M |
| Current contract value | $395.6M |
| Potential contract value / ceiling | $415.0M |
| Start date | Jul 22, 2022 |
| Current end date | Sep 21, 2026 |
| Potential end date | Sep 21, 2026 |
| Latest award activity | Jun 2, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 124 of 124 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 12, 2026 | A00077 | $12.1K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00077, CR00109-1 R00126 - TAXIWAY N SIGNS |
| Jun 11, 2026 | A00076 | $30.1K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00076 CR00110-1 R00125 - GRADING CHANGES |
| Jun 2, 2026 | A00074 | $26.7K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00074, CR00107-1, R00123 - LIGHTING VAULT ACCESS ROAD |
| May 29, 2026 | P00047 | $3.0M | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00047, CR00084-3, CHARLIE LOOP ELEVATION PART 1C |
| May 27, 2026 | P00046 | $591.5K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00046, CR00090, INCREASE CLIN 1007, 2025 |
| May 18, 2026 | A00073 | $24.7K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00073, CR00106-1, R00121 - DESIGN CHANGE TXY M |
| May 4, 2026 | A00072 | $206.6K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00072 CR00099-2 R00119 - LIGHTING ON TAXIWAY M |
| Apr 30, 2026 | A00071 | $25.1K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00071, CR00105-1, R00118 - DIFFERING SITE CONDITION J |
| Apr 28, 2026 | A00070 | $0 | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00070, CR00101, 2026 INTERSECTION CLOSURE |
| Apr 21, 2026 | A00069 | $32.0K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00045, CR00059 - DU11 REMOVAL |
| Apr 20, 2026 | P00045 | $3.9M | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00045, CR00059 - DU11 REMOVAL |
| Apr 7, 2026 | P00044 | $255.5K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00044, CR00091-2 - HOLD LINE OFFSET PART 1B |
| Mar 24, 2026 | A00068 | $34.1K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00068, CR00087, R00113 - DIFFERING SITE CONDITIONS, I |
| Mar 20, 2026 | A00067 | $21.6K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00067, CR00094-2, R00112 - ASPHALT RELEASE AGENT |
| Mar 18, 2026 | A00066 | $14.9K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00066, CR00096-2 R00111 - LIGHTING VAULT CULVERT |
| Mar 16, 2026 | A00065 | $-271.7K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00065 CR00085-2 R00110 - DESCOPE NAV AID FOOTINGS PART 2 |
| Mar 9, 2026 | P00043 | $30.4K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00064 CR00086-2 R00108 - WATERLINE REALIGNMENT - PART 2 |
| Feb 2, 2026 | A00064 | $183.4K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00064 CR00086-2 R00108 - WATERLINE REALIGNMENT - PART 2 |
| Jan 28, 2026 | A00063 | $2.1K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00063, CR00103-1 R00107 - ABOVE GROUND BAK ROOF DIMENSIONS |
| Jan 26, 2026 | A00062 | $17.3K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00062, CR00098-2, R00106 - ASBESTOS PIPE AT TXY M |
| Jan 13, 2026 | A00061 | $68.4K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00061 R00105 - ABOVE GROUND BAK ADJUSTMENT |
| Dec 17, 2025 | P00042 | $242.2K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00042 ADMINISTRATIVE CORRECTION TO PAYMENT TERM DAYS FROM 30 TO 14 DAYS. |
| Dec 15, 2025 | P00041 | $0 | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00042 ADMINISTRATIVE CORRECTION TO PAYMENT TERM DAYS FROM 30 TO 14 DAYS. |
| Dec 4, 2025 | A00060 | $29.7K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00060, CR00095-1, R00103, DESIGN CHANGE F |
| Nov 12, 2025 | P00040 | $-232.1K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00040, CR00082-2 R0010 PCC TO HMA PART 2 |
| Oct 22, 2025 | A00059 | $0 | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00059, CR00099-1, R00100 - LIGHTING ON TAXIWAY M |
| Oct 15, 2025 | A00058 | $19.0K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00058 CR00098-1, R00099 - ASBESTOS PIPE AT TXY M |
| Oct 8, 2025 | P00039 | $195.9K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00038 CR#44-2 - CHANGE ASPHALT BINDER, PART 2 |
| Sep 29, 2025 | A00057 | $5.4K | BE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00057 CR00096-1 R00098 LIGHTING VAULT CULVERT |
| Sep 19, 2025 | A00056 | $17.6K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00056. CR00089-1, R00097 - DESIGN CHANGE, E |
| Sep 11, 2025 | A00055 | $8.2K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00055 CR00092-1 R00096 - ABOVE GROUND BAK ADJUSTMENT |
| Sep 10, 2025 | A00054 | $7.8K | RUNWAY 16/34 MODIFICATION NO. A00054 R00095 CR00091-1 - HOLD LINE OFFSET |
| Sep 9, 2025 | P00038 | $0 | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00038 R00093 - CESSATION OF WORK DUE TO BASE SECURITY |
| Aug 25, 2025 | A00053 | $2.5K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00053 R00094 - ASPHALT RELEASE AGENT |
| Aug 13, 2025 | A00052 | $21.6K | BE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00052 CR00086-1, R00091 - WATERLINE REALIGNMENT |
| Aug 5, 2025 | A00050 | $0 | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00050 R00089 CR#85-1 - DESCOPE NAV AID |
| Aug 5, 2025 | A00051 | $3.5K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00051 R00090 CR00088-1 RAISE EXISTING CATCH BASIN |
| Jul 24, 2025 | A00048 | $70.0K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00048 CR00036 R00087 INCREASE CLIN 1005 POL STOCKPILE QTY |
| Jul 24, 2025 | A00049 | $127.2K | JBE054 CI#84-1 A00049 |
| Jul 11, 2025 | A00047 | $17.8K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00047 CR00062, R00086 - BAK STRUCTURE ADJUSTMENT |
| Jul 10, 2025 | P00037 | $3.2M | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00037, CR#42 R00084 - EXCESS PEAT NORTH OF AIRLIFTER |
| Jun 27, 2025 | A00046 | $102.5K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00046 R00085, CR00074 - DIFFERING SITE CONDITIONS, H |
| Jun 25, 2025 | A00045 | $71.9K | JBE054 EXTEND RUNWAY 16/34 A00045 R00083-CR#69, DIFFERING SITE CONDITION, G |
| Jun 18, 2025 | P00036 | $484.3K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00036 R00082, CI#70-2 ARMOUR NORTH DITCH, PART 2 |
| Jun 13, 2025 | A00044 | $0 | BE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00044 R00081 CI#83 WEATHER TIME EXTENSION AUG 24 - APR 25 |
| Jun 11, 2025 | A00043 | $42.8K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00043 CI#72-2 R00080 AIRLIFTER RD DITCH 109+25 - 113+80 PART2 |
| Jun 9, 2025 | P00035 | $3.4M | CONSTRUCT RUNWAY EXTENSION / TAXIWAY TAXIWAY D - LANDFILL LF06 CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA REFERENCE NO. R00074 |
| May 21, 2025 | A00042 | $56 | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00042 R00079 - NAV AID CHANGES PART 1 |
| May 16, 2025 | A00041 | $150.5K | JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. A00041 R00078 - CI#79-1 LIGHTING VAULT AND BAK STRUCTURE CHANGES |
| May 16, 2025 | P00034 | $0 | CONSTRUCT RUNWAY EXTENSION / TAXIWAY CONTRACT JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00034 R00077 - PCC TO HMA PART 1 |
| May 12, 2025 | P00033 | $1.2M | DESIGN CHANGE D, CI#76 CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA |
| May 9, 2025 | P00032 | $573.9K | CONTRACT NO. W911KB22C0012 JBE054 EXTEND RUNWAY 16/34 MODIFICATION NO. P00033 R00075 - DESIGN CHANGES, C |
| Apr 30, 2025 | A00040 | $-34.0K | CONSTRUCT RUNWAY EXTENSION / TAXIWAY TAXIWAY N CHANGES CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA REFERENCE NO. R00073 |
| Apr 18, 2025 | P00031 | $450.0K | CONSTRUCT RUNWAY EXTENSION / TAXIWAY JBE054 MOD P00031 CI#78-1 INCREASE CLIN 1006 RCRA STOCKPILE PART 1 |
| Apr 17, 2025 | P00030 | $3.4M | CONSTRUCT RUNWAY EXTENSION / TAXIWAY, P00030, CI#67-3 |
| Apr 3, 2025 | P00029 | $0 | CONSTRUCT RUNWAY EXTENSION / TAXIWAY - IMPLEMENT EXECUTIVE ORDER 14173 |
| Feb 25, 2025 | A00039 | $11.2K | CONSTRUCT RUNWAY EXTENSION / TAXIWAY - JBE054 A00038 BAK, HEAT TRACE, RMA LOT SIZE CI73 |
| Feb 21, 2025 | P00028 | $1.1M | JBE054 P00028 CI#67-2 |
| Jan 13, 2025 | A00038 | $11.5K | CONSTRUCT RUNWAY EXTENSION / TAXIWAY - PART 2 FOR 00055-2 MANHOLE DEMO AND COMM DUCT REROUTE JBE054 CHANGE |
| Dec 6, 2024 | A00037 | $70.2K | W911KBC0012 JBE054 EXTEND RUNWAY 16/34, MODIFICATION NO. A00037 CR00063-2 REMOVAL OF LIGHTING DUCT BANK, PART 2 |
| Nov 21, 2024 | P00027 | $-3.0M | MILL AND OVERLAY INTERSECTION CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00047 00053 MILL AND OVERLAY INTERSECTION |
| Nov 1, 2024 | A00036 | $394.2K | EXECUTED MODIFICATION FOR CONTRACT W911KB22C0012, JBE054 EXTEND RUNWAY, 16/34, JBER, ALASKA, MODIFICATION NO. A00036, CR00052-2 INSTALL CULVERT AND RAISE AIRLIFTER, PART 2 |
| Oct 24, 2024 | P00026 | $2.2M | NORTHEAST DRAINAGE, PART 1 CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00063 00067-1 NORTHEAST DRAINAGE, PART 1 |
| Oct 9, 2024 | A00035 | $167.6K | REROUTE GAS LINE, PART 2 CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00060 00058-2 REROUTE GAS LINE, PART 2 |
| Oct 4, 2024 | A00034 | $15.0K | AIRLIFTER RD DITCH 109+25 - 113+80 CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00062 00072-1 AIRLIFTER RD DITCH 109+25 - 113+80 |
| Sep 30, 2024 | P00025 | $33.9M | SOUTH RUNWAY CORRECTION, PART 2 - FINAL CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00061 00018-3 SOUTH RUNWAY CORRECTION, PART 2 FINAL |
| Sep 5, 2024 | P00024 | $335.0K | ARMOUR NORTH DITCH, PART 1 CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00059 00070-1 ARMOUR NORTH DITCH, PART 1 |
| Aug 28, 2024 | A00032 | $9.1K | 24 STRAND TO THE SOUTH, PART 2 CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00057 00061-2 24 STRAND TO THE SOUTH, PART 2 |
| Aug 28, 2024 | A00033 | $0 | WEATHER TIME EXTENSION JAN 24 - JUL 24 CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00058 00068 WEATHER TIME EXTENSION JAN 24 - JUL 24 |
| Aug 26, 2024 | A00030 | $0 | TAXIWAY N CHANGES CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00055 00065-1 TAXIWAY N CHANGES |
| Aug 26, 2024 | A00031 | $619 | SPLICE EQUIPMENT FOR 18220, PART 2 CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00056 00066-2 SPLICE EQUIPMENT FOR 18220, PART 2 |
| Aug 23, 2024 | A00029 | $1.9K | INCREASE MULCH APPLICATION RATE, PART 2 CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00054 00064-2 INCREASE MULCH APPLICATION RATE, PART 2 |
| Aug 21, 2024 | A00028 | $99.8K | EXTEND COMM CABLE TO MH506, PART 2 CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00053 00060-2 EXTEND COMM CABLE TO MH506, PART 2 FINAL |
| Aug 16, 2024 | P00023 | $-179.9K | TOPSOIL CHANGE, NORTH FILL CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. |
| Jul 15, 2024 | A00027 | $-1.2K | A00027 CR00051 CHANGE TAXIWAY N5 TO A USED TAXIWAY CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. |
| Jul 12, 2024 | A00026 | $5.0K | SPLICE EQUIPMENT FOR 18220, PART 1, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00050, 00066-1 SPLICE EQUIPMENT FOR 18220, PART 1 |
| Jul 11, 2024 | P00022 | $589.4K | CONSTRUCT AIRCRAFT ARRESTING SYSTEMS, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00049, 00011 CONSTRUCT AIRCRAFT ARRESTING SYSTEMS |
| Jun 25, 2024 | P00021 | $-100.0K | MILL AND OVERLAY INTERSECTION, PART 1A, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00047, CR00053-1 MILL AND OVERLAY INTERSECTION, PART 1A |
| Jun 21, 2024 | A00025 | $90.0K | INSTALL CULVERT AND RAISE AIRLIFTER, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00048, 00052-1 INSTALL CULVERT AND RAISE AIRLIFTER |
| Jun 5, 2024 | A00024 | $10.0K | REMOVAL OF LIGHTING DUCT BANK, PART 1, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00046, 00063-1 REMOVAL OF LIGHTING DUCT BANK, PART 1 |
| Jun 4, 2024 | A00023 | $12.0K | 24 STRAND TO THE SOUTH, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00045 00061-1 24 STRAND TO THE SOUTH, PART 1 |
| May 23, 2024 | A00022 | $50.0K | INCREASE MULCH APPLICATION RATE, PART 1, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00044, 00064-1 INCREASE MULCH APPLICATION RATE, PART 1 |
| May 22, 2024 | A00021 | $155.8K | DDC AND UPS FOR GENERATOR ROOM, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA., REFERENCE NO. R00040, 00043 DDC AND UPS FOR GENERATOR ROOM |
| May 20, 2024 | P00020 | $21.0K | CHANGE ASPHALT BINDER, PART 1, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA., REFERENCE NO. R00042, 00044-1 CHANGE ASPHALT BINDER, PART 1 |
| May 17, 2024 | A00019 | $21.0K | REROUTE GAS LINE, PART 1, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00039 00058-1 REROUTE GAS LINE, PART I |
| May 17, 2024 | A00020 | $94.0K | EXTEND COMM CABLE TO MH506, PART 1, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00041, 00060-1 EXTEND COMM CABLE TO MH506, PART 1 |
| May 15, 2024 | A00018 | $108.4K | BINDER AND MIX DESIGN TESTING, PART 2, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. |
| Apr 25, 2024 | P00019 | $-479.9K | CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA., REFERENCE NO. R00037, 00050 CHANGE GRASS SEED |
| Apr 5, 2024 | A00017 | $6.0K | MANHOLE DEMO AND COMM DUCT REROUTE, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00036, 00055-1 MANHOLE DEMO AND COMM DUCT REROUTE |
| Mar 20, 2024 | P00018 | $8.0M | SOUTH RUNWAY CORRECTION, PART 1B CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00035 00018-2 SOUTH RUNWAY CORRECTION, PART 1B |
| Feb 26, 2024 | A00016 | $85.5K | CONCR026 & CR030, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00034 00026 ANNULAR SPACE FOR P606 SEALANT, 00030 SEPTEMBER 11 RAMP FREEZE |
| Feb 12, 2024 | A00015 | $0 | WEATHER DELAYS JUNE 23- DEC 23 CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00033 CR00049 WEATHER DELAYS JUNE 23- DEC 23 |
| Dec 20, 2023 | P00017 | $-0 | CONSTRUCT RUNWAY EXTENSION / TAXIWAY - ADMINISTRATIVELY CORRECTS $0.03 CENT ERROR ON TOTAL CONTRACT VALUE (CORRECTS CLIN 0001) AND ADMINISTRATIVELY CORRECTS MOD A00004 AND PLACES THE A00004 $33K ON THE CORRECT CLIN 1003 VICE CLIN 0001. |
| Dec 14, 2023 | P00016 | $97.4M | CONSTRUCT RUNWAY EXTENSION / TAXIWAY INCREMENTAL FUNDING |
| Dec 6, 2023 | A00014 | $616.8K | CONSTRUCT RUNWAY EXTENSION / TAXIWAY - CR00040 CHANGE RCRA DISPOSAL- CLIN0018 ONLY |
| Nov 20, 2023 | P00015 | $36.0K | INCREASE CLIN 1006 RCRA QUANTITY, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00029, 00039 INCREASE CLIN 1006 RCRA QUANTITY |
| Nov 14, 2023 | A00013 | $9.6K | PAPI FOUNDATION, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. |
| Nov 9, 2023 | A00012 | $27.5K | DIFFERING SITE CONDITION, E, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00027, 00035-1 DIFFERING SITE CONDITION, E SEE PAGE 2. |
| Nov 7, 2023 | A00011 | $74.5K | INSTALL COMM AROUND OBSTRUCTION, CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00026 00037-1 INSTALL COMM AROUND OBSTRUCTION |
| Nov 2, 2023 | P00014 | $325.0K | P00014 CI #33-2 INCREASE QTY TO CLIN 1007, PART 2 |
| Oct 24, 2023 | A00010 | $37.6K | CONSTRUCT RUNWAY EXTENSION / TAXIWAY |
| Oct 20, 2023 | A00009 | $-251.1K | CONSTRUCT RUNWAY EXTENSION / TAXIWAY |
| Oct 18, 2023 | P00013 | $325.0K | P00013 CI #33-1 INCREASE QTYS TO CLIN 1007 |
| Oct 3, 2023 | A00008 | $43.8K | CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00021, CR00023-1 DIFFERING SITE CONDITION, C, PART I |
| Sep 14, 2023 | A00007 | $12.6K | CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00020, 00028-1 DESIGN CHANGES B |
| Sep 13, 2023 | A00006 | $19.1K | CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00019, 00024 DESIGN CHANGES A |
| Aug 30, 2023 | P00012 | $276.5K | CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00018 00027-1 FEEDER 42 ALIGNMENT |
| Aug 18, 2023 | A00005 | $55.2K | CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00017, CR00020-1 DIFFERING SITE CONDITIONS, B |
| Aug 9, 2023 | P00011 | $22.0K | CONTRACT FOR JBE054 EXTEND RUNWAY 16/34 AT JOINT BASE ELMENDORF-RICHARDSON [JBER], ALASKA. REFERENCE NO. R00015 00021-1 16" WATER LINE CONFLICT |
| Jul 28, 2023 | P00010 | $-97.7K | CONTRACT FOR JBE054 EXTEND RUNWAY 16/34. REFERENCE NO. R00014 00014 ELECTRICAL TRENCH AND BACKFILL |
| Jul 20, 2023 | P00009 | $3.5M | CONTRACT FOR JBE054 EXTEND RUNWAY 16/34. REFERENCE NO. R00013 00018-1 SOUTH RUNWAY CORRECTION |
| Jul 18, 2023 | A00004 | $23.9K | CONTRACT FOR JBE054 EXTEND RUNWAY 16/34. REFERENCE NO. R00012 00019-1 DIFFERING SITE CONDITIONS, A |
| Jun 16, 2023 | A00003 | $0 | REFERENCE NO. R00010 00016 WEATHER TIME EXTENSION AUG 22 - MAY 23 |
| Jun 14, 2023 | A00002 | $18.2K | REFERENCE NO. R00009 00012 DAY TANK UPSIZING |
| May 25, 2023 | P00008 | $2.4M | CONSTRUCT RUNWAY EXTENSION / TAXIWAY - EXERCISE CLIN 0017 AND 0018 |
| May 18, 2023 | P00007 | $57.3M | CONSTRUCT RUNWAY EXTENSION / TAXIWAY - INCREMENTAL FUNDING |
| Apr 11, 2023 | P00006 | $0 | CONSTRUCT RUNWAY EXTENSION / TAXIWAY |
| Apr 7, 2023 | P00005 | $86.0M | CONSTRUCT RUNWAY EXTENSION / TAXIWAY |
| Mar 31, 2023 | P00004 | $2.5M | CONSTRUCT RUNWAY EXTENSION / TAXIWAY EXERCISE OPTIONS |
| Mar 29, 2023 | A00001 | $0 | REFERENCE NO. R00004 00002 ON-SITE TOPSOIL SPECIFICATION REVISION |
| Mar 28, 2023 | P00003 | $332.9K | CONSTRUCT RUNWAY EXTENSION / TAXIWAY - MODIFICATION TO CLIN 0004 FOR CHANGE REQUEST #00004 EAST HAUL ROAD CHANGES. |
| Mar 8, 2023 | P00002 | $0 | CONTRACT FOR JBE054 EXTEND RUNWAY 16/34. REFERENCE NO. R00002 CR00001 FILL MATERIAL SPECIFICATION REVISION |
| Dec 5, 2022 | P00001 | $0 | CONSTRUCT RUNWAY EXTENSION / TAXIWAY - |
| Jul 22, 2022 | 0 | $69.1M | JBE054 RUNWAY EXTENSION, JBER, ALASKA |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.