Federal contract award

W911PT25C0009

TO COVER THE COST OF LABOR, MATERIALS, AND EQUIPMENT FOR THE SUPPLEMENTAL WORK FOR PAINTBOOTH INSTALL FOR THE WATERVLIET ARSENAL, WATERVLIET, NY.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QK ACC WVA
NAICS238210 — Electrical Contractors and Other Wiring Installation Contractors
PSCZ2EC — REPAIR OR ALTERATION OF PRODUCTION BUILDINGS
Parent award / vehicleNot reported
Set-aside8(A) SOLE SOURCE
Pricing typeFIRM FIXED PRICE
Obligations$7.3M
Current contract value$7.3M
Potential contract value / ceiling$7.3M
Start dateApr 9, 2025
Current end dateJun 30, 2026
Potential end dateJun 30, 2026
Latest award activityMay 12, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 12, 2026P00006$154.2KTO COVER THE COST OF LABOR, MATERIALS, AND EQUIPMENT FOR THE SUPPLEMENTAL WORK FOR BUILDING 137 PAINT BOOTH INSTALL, BUILDING 135 EMERGENCY CONDUIT MITIGATION, AND UNDERGROUND ELECTRICAL CABLE REPLACEMENT AT THE WATERVLIET ARSENAL, NY.
Apr 21, 2026P00005$681.7KTO COVER THE COST OF LABOR, MATERIALS, AND EQUIPMENT FOR THE SUPPLEMENTAL WORK FOR BUILDING 137 PAINT BOOTH INSTALL, BUILDING 135 EMERGENCY CONDUIT MITIGATION, AND UNDERGROUND ELECTRICAL CABLE REPLACEMENT AT THE WATERVLIET ARSENAL, NY.
Jan 21, 2026P00004$3.4MMODIFICATION ISSUED AS SUPPLEMENTAL AGREEMENT TO ESTABLISH CLIN 0004 AND OPTION CLIN 0005 TO COVER THE COST OF UNDERGROUND ELECTRICAL CABLE REPLACEMENT AT LOOP 3 NORTH OUTSIDE OF BUILDING 137 OF THE WATERVLIET ARSENAL.
Sep 29, 2025P00003$2.1MMODIFICATION ISSUED AS SUPPLEMENTAL AGREEMENT TO ESTABLISH CLIN 0004 AND OPTION CLIN 0005 TO COVER THE COST OF UNDERGROUND ELECTRICAL CABLE REPLACEMENT AT LOOP 3 NORTH OUTSIDE OF BUILDING 137 OF THE WATERVLIET ARSENAL.
Jul 1, 2025P00002$165.0KMODIFICATION ISSUED AS SUPPLEMENTAL AGREEMENT TO ADD IN SCOPE WORK TO CLINS 0001 AND 0002 IN SUPPORT OF PAINT BOOTH INSTALLATION IN BUILDING 137 AT WATERVLIET ARSENAL, NY 12189.
May 30, 2025P00001$350.0KMODIFICATION ISSUED TO ADD FUNDS TO CLINS 0001 AND 00002 FOR SUPPLEMENTAL WORK WITHIN SCOPE AND ADD CLIN 0003 TO COVER THE COST OF BUILDING 135 EMERGENCY CONDUIT MITIGATION AT THE WATERVLIET ARSENAL, NY.
Apr 8, 20250$413.9KTO COVER THE COST OF LABOR, MATERIALS, AND EQUIPMENT FOR THE SUPPLEMENTAL WORK FOR PAINTBOOTH INSTALL FOR THE WATERVLIET ARSENAL, WATERVLIET, NY.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.