Federal contract award

W911SG25FA047

THE CONTRACTOR SHALL RE-ARRANGE AND RE-CIRCUIT EXISTING CIRCUITS FROM MAIN DISTRIBUTION PANEL (MDP) AND RECONNECT THEM TO EXISTING EMERGENCY DISTRIBUTION PANELBOARD (EDP) TO HAVE THE ENTIRE BUILDING POWER LOAD 100% BACKED UP BY EXISTING GENERATOR.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QM MICC-FT BLISS
NAICS236220 — Commercial and Institutional Building Construction
PSCZ2NZ — REPAIR OR ALTERATION OF OTHER UTILITIES
Parent award / vehicleW911SG22D0004
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$201.5K
Current contract value$201.5K
Potential contract value / ceiling$201.5K
Start dateAug 4, 2025
Current end dateApr 4, 2026
Potential end dateApr 4, 2026
Latest award activityFeb 25, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Feb 25, 2026P00003$0THE CONTRACTOR SHALL RE-ARRANGE AND RE-CIRCUIT EXISTING CIRCUITS FROM MAIN DISTRIBUTION PANEL (MDP) AND RECONNECT THEM TO EXISTING EMERGENCY DISTRIBUTION PANELBOARD (EDP) TO HAVE THE ENTIRE BUILDING POWER LOAD 100% BACKED UP BY EXISTING GENERATOR.
Sep 26, 2025P00002$0THE CONTRACTOR SHALL RE-ARRANGE AND RE-CIRCUIT EXISTING CIRCUITS FROM MAIN DISTRIBUTION PANEL (MDP) AND RECONNECT THEM TO EXISTING EMERGENCY DISTRIBUTION PANELBOARD (EDP) TO HAVE THE ENTIRE BUILDING POWER LOAD 100% BACKED UP BY EXISTING GENERATOR.
Aug 14, 2025P00001$0THE CONTRACTOR SHALL RE-ARRANGE AND RE-CIRCUIT EXISTING CIRCUITS FROM MAIN DISTRIBUTION PANEL (MDP) AND RECONNECT THEM TO EXISTING EMERGENCY DISTRIBUTION PANELBOARD (EDP) TO HAVE THE ENTIRE BUILDING POWER LOAD 100% BACKED UP BY EXISTING GENERATOR.
Jul 31, 20250$201.5KTHE CONTRACTOR SHALL RE-ARRANGE AND RE-CIRCUIT EXISTING CIRCUITS FROM MAIN DISTRIBUTION PANEL (MDP) AND RECONNECT THEM TO EXISTING EMERGENCY DISTRIBUTION PANELBOARD (EDP) TO HAVE THE ENTIRE BUILDING POWER LOAD 100% BACKED UP BY EXISTING GENERATOR.