Federal contract award

W911SG25PA011

2ABCT NTC 25-07 FUEL TRUCKS. THE CONTRACTOR SHALL PROVIDE A 1,000-GALLON FUEL TRUCK WITH POWER TAKE OFF OR POWER TRANSMISSION OPERATION (PTO) AND HAVE THE ABILITY TO PUMP AT LEAST 20 GALLONS OF FUEL PER MINUTE.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QM MICC-FT BLISS
NAICS532490 — Other Commercial and Industrial Machinery and Equipment Rental and Leasing
PSCW023 — Lease or Rental of Equipment: Ground Effect Vehicles, Motor Vehicles, Trailers, and Cycles
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$79.3K
Current contract value$79.3K
Potential contract value / ceiling$79.3K
Start dateApr 9, 2025
Current end dateMay 29, 2025
Potential end dateMay 29, 2025
Latest award activitySep 8, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 8, 2025P00002$40.3K2ABCT NTC 25-07 FUEL TRUCKS. THE CONTRACTOR SHALL PROVIDE A 1,000-GALLON FUEL TRUCK WITH POWER TAKE OFF OR POWER TRANSMISSION OPERATION (PTO) AND HAVE THE ABILITY TO PUMP AT LEAST 20 GALLONS OF FUEL PER MINUTE.
May 30, 2025P00001$7802ABCT NTC 25-07 FUEL TRUCKS. THE CONTRACTOR SHALL PROVIDE A 1,000-GALLON FUEL TRUCK WITH POWER TAKE OFF OR POWER TRANSMISSION OPERATION (PTO) AND HAVE THE ABILITY TO PUMP AT LEAST 20 GALLONS OF FUEL PER MINUTE.
Apr 8, 20250$38.2K2ABCT NTC 25-07 FUEL TRUCKS. THE CONTRACTOR SHALL PROVIDE A 1,000-GALLON FUEL TRUCK WITH POWER TAKE OFF OR POWER TRANSMISSION OPERATION (PTO) AND HAVE THE ABILITY TO PUMP AT LEAST 20 GALLONS OF FUEL PER MINUTE.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.