Federal contract award
W911SR25C0023
DEVELOP HIGH-PERFORMANCE ROOM MID-WAVE INFRARED PHOTOCONDUCTOR ARRAYS, IMAGING SYSTEMS WITH LOW-COST, SIGNIFICANTLY REDUCED SIZE, WEIGHT AND POWER CONSUMPTION CAPABLE OF WAFER-SCALE MONOLITHIC INTEGRATION WITH COMPLEMENTARY METAL-OXIDE SEMICONDUCTOR.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W6QK ACC-APG |
| NAICS | 541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) |
| PSC | AC11 — NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; BASIC RESEARCH |
| Parent award / vehicle | Not reported |
| Set-aside | SMALL BUSINESS SET ASIDE - TOTAL |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $204.1K |
| Current contract value | $204.1K |
| Potential contract value / ceiling | $204.1K |
| Start date | Jun 1, 2025 |
| Current end date | Nov 30, 2025 |
| Potential end date | Nov 30, 2025 |
| Latest award activity | Jun 3, 2025 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 2 of 2 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 3, 2025 | P00001 | $0 | DEVELOP HIGH-PERFORMANCE ROOM MID-WAVE INFRARED PHOTOCONDUCTOR ARRAYS, IMAGING SYSTEMS WITH LOW-COST, SIGNIFICANTLY REDUCED SIZE, WEIGHT AND POWER CONSUMPTION CAPABLE OF WAFER-SCALE MONOLITHIC INTEGRATION WITH COMPLEMENTARY METAL-OXIDE SEMICONDUCTOR. |
| May 29, 2025 | 0 | $204.1K | DEVELOP HIGH-PERFORMANCE ROOM MID-WAVE INFRARED PHOTOCONDUCTOR ARRAYS, IMAGING SYSTEMS WITH LOW-COST, SIGNIFICANTLY REDUCED SIZE, WEIGHT AND POWER CONSUMPTION CAPABLE OF WAFER-SCALE MONOLITHIC INTEGRATION WITH COMPLEMENTARY METAL-OXIDE SEMICONDUCTOR. |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.