Federal contract award
W9123623F0079
THIS PROJECT IS TO REPAIR BY FULL DEPTH ROAD RECONSTRUCTION OF THE FOLLOWING ROADS: SHERIDAN DRIVE, WILSON DRIVE, MCCLELLAN DRIVE, AND THE WEEKS/GRANT LOOP.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W2SD ENDIST NORFOLK |
| NAICS | 237990 — Other Heavy and Civil Engineering Construction |
| PSC | Y1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS |
| Parent award / vehicle | W9123621D2012 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $13.1M |
| Current contract value | $13.1M |
| Potential contract value / ceiling | $13.7M |
| Start date | Oct 10, 2023 |
| Current end date | Jul 18, 2025 |
| Potential end date | Jul 18, 2025 |
| Latest award activity | Oct 16, 2025 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 6 of 6 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Oct 16, 2025 | P00002 | $-334.1K | MOD P00002 DE-OBLIGATES $215,182.50 (CLIN 0006 - UNDERCUTS) & $118,902.00 (CLIN 0007 - ASBESTOS), TOTALING $334,084.50 |
| Sep 3, 2025 | A00009 | $78.0K | ARLINGTON NATIONAL CEMETERY SHERIDAN AREA ROAD, MODIFICATION A00009, PROVIDES ALL LABOR AND MATERIALS NECESSARY TO PERFORM SR025, GRANT/TRAM STOP CONCRETE SCALING REPAIRS. |
| May 20, 2025 | A00008 | $18.4K | ARLINGTON NATIONAL CEMETERY SHERIDAN AREA PROJECT. MODIFICATION A00008 PROVIDES ALL LABOR, EQUIPMENT, AND MATERIALS NECESSARY TO PERFORM SE023, SE024, SE025. |
| Jan 31, 2025 | A00007 | $60.3K | ARLINGTON NATIONAL CEMETERY SHERIDAN AREA PROJECT, MODIFICATION A00007 PROVIDES ALL LABOR AND MATERIALS NECESSARY TO PERFORM SR019, SR020, SR021, SR022 |
| Dec 11, 2024 | A00006 | $29.8K | ARLINGTON NATIONAL CEMETERY SHERIDAN AREA PROJECT, MODIFICATION A00006 PROVIDES ALL LABOR AND MATERIALS NECESSARY TO PERFORM SR016 (STRUCTURE E1 TOP REDESIGN), SR017 (ADD GRANT DRIVE CONCRETE WIRE MESH), SR018 (ADD COLOR TO MCCLELLAN CURB) |
| Oct 21, 2024 | A00005 | $48.8K | ARLINGTON NATIONAL CEMETERY SHERIDAN AREA PROJECT, MODIFICATION A00005 PROVIDES ALL LABOR AND MATERIALS NECESSARY TO PERFORM SR012 (SHERIDAN CURB DEPTH), SR013 (SHERIDAN HANDHOLES), SR014 (RED SPRING BLUESTONE FRAME), SR015 (STRUCTURE C21 RISER) |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.