Federal contract award
W9123625PA004
URGENT HVAC REPAIR SERVICES REQUIRED FOR THE WATERFIELD BUILDING LOCATED AT 803 FRONT ST., NORFOLK VA 23510.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W2SD ENDIST NORFOLK |
| NAICS | 238220 — Plumbing, Heating, and Air-Conditioning Contractors |
| PSC | J041 — Maintenance, Repair and Rebuilding of Equipment: Refrigeration, Air Conditioning, and Air Circulating Equipment |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $264.2K |
| Current contract value | $264.2K |
| Potential contract value / ceiling | $264.2K |
| Start date | Jul 1, 2025 |
| Current end date | Jan 31, 2026 |
| Potential end date | Jan 31, 2026 |
| Latest award activity | Dec 4, 2025 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Dec 4, 2025 | P00003 | $0 | THE PURPOSE OF THIS MODIFICATION IS THE EXTENSION OF THE CURRENT HVAC SERVICES CONTRACT SUPPORTING THE WATERFIELD BUILDING, NORFOLK DISTRICT, THROUGH 31 JANUARY 2026. |
| Nov 5, 2025 | P00002 | $14.2K | URGENT HVAC REPAIR SERVICES REQUIRED FOR THE WATERFIELD BUILDING LOCATED AT 803 FRONT ST., NORFOLK VA 23510. EXTEND END DATE OF PERIOD OF PERFORMANCE FROM 31 JULY 2025 TO 17 NOVEMBER 2025 |
| Jul 31, 2025 | P00001 | $0 | URGENT HVAC REPAIR SERVICES REQUIRED FOR THE WATERFIELD BUILDING LOCATED AT 803 FRONT ST., NORFOLK VA 23510. EXTEND END DATE OF PERIOD OF PERFORMANCE FROM 31 JULY 2025 TO 17 NOVEMBER 2025 |
| Jun 30, 2025 | 0 | $250.0K | URGENT HVAC REPAIR SERVICES REQUIRED FOR THE WATERFIELD BUILDING LOCATED AT 803 FRONT ST., NORFOLK VA 23510. |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.