Federal contract award
W9123820C0002
AMERICAN RIVER COMMON FEATURES, NATOMAS LEVEE IMPROVEMENT PROJECT AT REACH B.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W075 ENDIST SACRAMENTO |
| NAICS | 237990 — Other Heavy and Civil Engineering Construction |
| PSC | Y1LC — CONSTRUCTION OF TUNNELS AND SUBSURFACE STRUCTURES |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $80.5M |
| Current contract value | $80.5M |
| Potential contract value / ceiling | $80.5M |
| Start date | Nov 1, 2019 |
| Current end date | Nov 30, 2023 |
| Potential end date | Nov 30, 2023 |
| Latest award activity | May 18, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 67 of 67 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 18, 2026 | P00014 | $179.7K | NATOMAS REACH B REA FOR ADDITIONAL TOPSOIL STRIPPING |
| Jan 17, 2025 | P00012 | $668.9K | FY19 GENERAL CONSTRUCTION FUNDING - ADJUSTMENT TO CLOSED CONTRACT DUE TO CULTURAL IMPACTS PRESENTED TO THE GOV BY CONTRACTOR |
| Jul 26, 2024 | A00053 | $139.6K | FY19 GENERAL CONSTRUCTION FUNDING |
| Jul 23, 2024 | P00011 | $-2.1M | FY19 GENERAL CONSTRUCTION FUNDING - FINAL VEQ |
| Nov 21, 2023 | A00052 | $22.2K | FY19 GENERAL CONSTRUCTION FUNDING |
| Nov 14, 2023 | A00051 | $-126.4K | FY19 GENERAL CONSTRUCTION FUNDING - A000051 CD095-2 DEFINITIZE ADJACENT LEVEE ELEVATION AND GRADING |
| Aug 25, 2023 | P00010 | $1.4M | FY19 GENERAL CONSTRUCTION FUNDING |
| Aug 15, 2023 | A00050 | $7.1K | FY19 GENERAL CONSTRUCTION FUNDING |
| Aug 2, 2023 | A00049 | $18.8K | FY19 GENERAL CONSTRUCTION FUNDING |
| Jul 26, 2023 | A00048 | $1.4K | FY19 GENERAL CONSTRUCTION FUNDING R00054 CD102 |
| Jun 5, 2023 | A00047 | $0 | CONTRACT FOR NATOMAS REACH B AT SACRAMENTO, CA. REFERENCE NO. R00055CD108 WEATHER TIME EXTENSION MAY 22 - MAR 2 |
| Mar 10, 2023 | A00046 | $62.6K | FY19 GENERAL CONSTRUCTION FUNDING |
| Feb 28, 2023 | A00045 | $86.2K | FY19 GENERAL CONSTRUCTION FUNDING |
| Feb 8, 2023 | A00044 | $190.6K | FY19 GENERAL CONSTRUCTION FUNDING |
| Jan 4, 2023 | P00009 | $15.0M | SEEPAGE BERM MATERIAL |
| Dec 1, 2022 | A00043 | $41.8K | FY19 GENERAL CONSTRUCTION FUNDING. CONTRACT FOR NATOMAS REACH B AT SACRAMENTO, CA. REF. NO. R00050/CD101 LIFT STATION NEW ARVS TOTAL CONTRACT PRICE IS INCREASED BY $41.830.44. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION. |
| Nov 3, 2022 | A00042 | $106.3K | CONTRACT FOR NATOMAS REACH B AT SACRAMENTO, CA. REF. NO. R00048/CD0096 OPTION 3 TREE RD TURNOUT REVISIONS. TOTAL CONTRACT PRICE IS INCREASED BY $106,317.48. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION. |
| Oct 4, 2022 | A00041 | $20.8K | FY19 GENERAL CONSTRUCTION FUNDING |
| Aug 29, 2022 | A00040 | $0 | FY19 GENERAL CONSTRUCTION FUNDING |
| Aug 19, 2022 | A00039 | $147.6K | CD098 REVISED ROAD TIE-IN DESIGN THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO CONSTRUCT THE ROAD AND DRIVEWAY TIE-INS PER THE RE-DESIGNED GRADES AS PROVIDED IN THE ATTACHED DESIGN SHEETS. |
| Jul 27, 2022 | A00038 | $16.1K | FY19 GENERAL CONSTRUCTION FUNDING - R00044/CD090 GARDEN HWY CONC DRIVEWAY 4027 |
| Jun 15, 2022 | A00037 | $200.0K | FY19 GENERAL CONSTRUCTION FUNDING |
| May 25, 2022 | P00008 | $327.7K | FY19 GENERAL CONSTRUCTION FUNDING |
| Apr 27, 2022 | A00036 | $13.1K | FY19 GENERAL CONSTRUCTION FUNDING |
| Mar 23, 2022 | P00007 | $1.9M | FY19 GENERAL CONSTRUCTION FUNDING |
| Mar 2, 2022 | A00035 | $92.5K | FY19 GENERAL CONSTRUCTION FUNDING |
| Feb 2, 2022 | A00034 | $10.0K | FY19 GENERAL CONSTRUCTION FUNDING |
| Jan 21, 2022 | A00033 | $139.3K | FY19 GENERAL CONSTRUCTION FUNDING |
| Dec 27, 2021 | A00032 | $226.3K | FY19 GENERAL CONSTRUCTION FUNDING |
| Dec 17, 2021 | A00031 | $141.2K | FY19 GENERAL CONSTRUCTION FUNDING |
| Dec 7, 2021 | A00030 | $179.1K | FY19 GENERAL CONSTRUCTION FUNDING |
| Nov 29, 2021 | A00029 | $32.8K | FY19 GENERAL CONSTRUCTION FUNDING |
| Nov 9, 2021 | A00028 | $199.0K | FY19 GENERAL CONSTRUCTION FUNDING |
| Sep 23, 2021 | A00027 | $72.0K | FY19 GENERAL CONSTRUCTION FUNDING |
| Sep 14, 2021 | A00026 | $138.4K | FY19 GENERAL CONSTRUCTION FUNDING |
| Aug 18, 2021 | P00006 | $798.4K | EXERCISING OPTION CLIN 1002, PART 1 MOD, PART 2 WILL BE NEGOTIATED |
| Aug 10, 2021 | A00025 | $240.0K | FY19 GENERAL CONSTRUCTION FUNDING |
| Aug 6, 2021 | A00024 | $34.9K | FY19 GENERAL CONSTRUCTION FUNDING |
| Aug 3, 2021 | A00023 | $89.0K | FY19 GENERAL CONSTRUCTION FUNDING |
| Jul 20, 2021 | A00022 | $15.6K | FY19 GENERAL CONSTRUCTION FUNDING |
| Jun 25, 2021 | A00021 | $2.7K | FY19 GENERAL CONSTRUCTION FUNDING |
| Jun 16, 2021 | A00020 | $47.8K | FY19 GENERAL CONSTRUCTION FUNDING |
| Jun 10, 2021 | A00019 | $40.4K | FY19 GENERAL CONSTRUCTION FUNDING |
| May 20, 2021 | A00018 | $39.0K | FY19 GENERAL CONSTRUCTION FUNDING |
| May 13, 2021 | A00017 | $11.7K | FY19 GENERAL CONSTRUCTION FUNDING |
| Apr 26, 2021 | A00016 | $20.9K | FY19 GENERAL CONSTRUCTION FUNDING |
| Mar 16, 2021 | A00015 | $24.5K | FY19 GENERAL CONSTRUCTION FUNDING |
| Mar 9, 2021 | A00014 | $7.3K | REFERENCE NO. R00019 CD041 POTHOLE ASPHALT MATERIAL ON LEVEE SLOPE |
| Feb 26, 2021 | A00013 | $47.7K | FY19 GENERAL CONSTRUCTION FUNDING |
| Feb 16, 2021 | A00012 | $0 | FY19 GENERAL CONSTRUCTION FUNDING |
| Jan 25, 2021 | A00011 | $19.0K | FY19 GENERAL CONSTRUCTION FUNDING |
| Jan 12, 2021 | A00010 | $-156.0K | FY19 GENERAL CONSTRUCTION FUNDING |
| Oct 27, 2020 | A00009 | $128.2K | FY19 GENERAL CONSTRUCTION FUNDING |
| Oct 15, 2020 | A00008 | $92.7K | FY19 GENERAL CONSTRUCTION FUNDING |
| Sep 30, 2020 | P00005 | $6.1M | AMERICAN RIVER COMMON FEATURES. MODIFICATION P00005 EXERCISES OPTION CONTRACT LINE ITEM NUMBER 1001. |
| Sep 28, 2020 | P00004 | $3.7M | NATOMAS REACH B. MODIFICATION P00004 AWARDS OPTION CONTRACT LINE ITEM NUMBER 1003. FY19 GENERAL CONSTRUCTION FUNDING. |
| Sep 11, 2020 | A00007 | $230.0K | FY19 GENERAL CONSTRUCTION FUNDING |
| Sep 3, 2020 | A00006 | $27.9K | FY19 GENERAL CONSTRUCTION FUNDING |
| Aug 21, 2020 | A00005 | $14.0K | FY19 GENERAL CONSTRUCTION FUNDING |
| Jul 29, 2020 | A00004 | $19.5K | FY19 GENERAL CONSTRUCTION FUNDING |
| May 29, 2020 | P00003 | $0 | CHANGE FUNDING AMOUNT FROM NON-FEDERAL SPONSOR |
| Apr 8, 2020 | A00003 | $19.0K | FY19 GENERAL CONSTRUCTION FUNDING |
| Mar 3, 2020 | A00002 | $12.0K | CD003 ADD 48-INCH X 42-INCH ECCENTRIC REDUCER THE QUANTITY OF CLIN 0028 48-INCH X 42-INCH ECCENTRIC REDUCER WILL BE INCREASED BY 1 TO ACCOUNT FOR THE OVERSITE ON VOL 5 DRAWING CF-001. |
| Feb 24, 2020 | A00001 | $0 | CONTRACT FOR NATOMAS REACH B AT SACRAMENTO, CA. R00001CD001R!/CD001 THE 01 57 19 SPECIFICATION SECTION HAS BEEN REVISED AS PROVIDED BELOW. IN THE EVENT THERE IS A DISCOVERY, IT WILL BE TREATED AS A DIFFERING SITE CONDITION. |
| Feb 4, 2020 | P00002 | $0 | FY19 GENERAL CONSTRUCTION FUNDING |
| Jan 15, 2020 | P00001 | $0 | FY19 GENERAL CONSTRUCTION FUNDING |
| Nov 14, 2019 | 0 | $49.3M | AMERICAN RIVER COMMON FEATURES, NATOMAS LEVEE IMPROVEMENT PROJECT AT REACH B. |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.