Federal contract award

W9123820F0102

PROJECT TITLE AND LOCATION: LOADING UNLOADING RAMP, MILITARY OCEAN TERMINAL, CONCORD (MOTCO) DESIGN-BID-BUILD FOR CONSTRUCTION OF CONCRETE BOAT RAMP.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW075 ENDIST SACRAMENTO
NAICS541330 — Engineering Services
PSCC211 — Architect - Engineer Services (including landscaping, interior layout, and designing)
Parent award / vehicleW9123818D0018
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$902.7K
Current contract value$902.7K
Potential contract value / ceiling$902.7K
Start dateSep 3, 2020
Current end dateSep 30, 2028
Potential end dateSep 30, 2028
Latest award activityMay 6, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 6 of 6 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 6, 2026P00005$0MOTCO LOADING UNLOADING RAMP
Aug 18, 2025P00004$-710PROJECT TITLE AND LOCATION: LOADING UNLOADING RAMP, MILITARY OCEAN TERMINAL, CONCORD (MOTCO), CALIFORNIA. THE PURPOSE OF THIS MODIFICATION IS TO REPLACE FUNDING ON CLINS 0001 AND 0004 AND TO DEOBLIGATE FUNDS FROM CLIN 0006.
Sep 6, 2024P00003$0PROJECT TITLE AND LOCATION: LOADING UNLOADING RAMP, MILITARY OCEAN TERMINAL, CONCORD (MOTCO), CALIFORNIA. THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERFORMANCE PERIOD.
Nov 9, 2023P00002$0PROJECT TITLE AND LOCATION: LOADING UNLOADING RAMP, MILITARY OCEAN TERMINAL, CONCORD (MOTCO), CALIFORNIA. THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERFORMANCE PERIOD.
May 13, 2022P00001$129.6KPROJECT TITLE AND LOCATION: LOADING UNLOADING RAMP, MILITARY OCEAN TERMINAL, CONCORD (MOTCO), CALIFORNIA. THE PURPOSE OF THIS MODIFICATION IS TO ADD CLINS FOR REVISIONS TO THE BASE TASKS.
Sep 3, 20200$773.9KPROJECT TITLE AND LOCATION: LOADING UNLOADING RAMP, MILITARY OCEAN TERMINAL, CONCORD (MOTCO) DESIGN-BID-BUILD FOR CONSTRUCTION OF CONCRETE BOAT RAMP.

Estimated positioning window

Sep 30, 2027 – Mar 30, 2028

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2028-09-30 (706 days from calculation)
+25 points
30 historical awards in this buyer and category group
+15 points
6 recorded award transactions
+10 points
Latest award action: 2026-05-06
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.