Federal contract award

W9123821C0034

REACH A LEVEE IMPROVEMENTS

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW075 ENDIST SACRAMENTO
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCY1PC — CONSTRUCTION OF UNIMPROVED REAL PROPERTY (LAND)
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$141.1M
Current contract value$141.1M
Potential contract value / ceiling$141.1M
Start dateOct 5, 2021
Current end dateDec 20, 2024
Potential end dateDec 20, 2024
Latest award activityAug 14, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 10 of 10 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 14, 2025A00013$103.0KCONTRACT FOR NATOMAS REACH A LEVEE IMPROVEMENTS. REFERENCE NO. R000020/CD026 B CELL FOR CSA SOIL (CSA-A). TOTAL CONTRACT PRICE IS INCREASED BY $103,006.49. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
Aug 7, 2025A00012$41.7KPERFORM THE NECESSARY WORK AT THE MARSTON PROPERTY IN ADVANCE OF WHEN IT WAS ORIGINALLY SCHEDULED. THIS CHANGE IN SCOPE INCLUDES GRIND AND OVERLAY WITH 2" OF HMA AND (1) MOBILIZATION.
Jun 17, 2025A00011$78.8KREACH A LEVEE IMPROVEMENTS
May 30, 2025P00008$2.0MREACH A LEVEE IMPROVEMENTS
May 20, 2025A00010$250.0KTHE CONSTRUCTION CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, PLANT, MATERIALS, LABOR, TO PERFORM A "CONTROLLED KEY TRENCH DEGRADE" OVER A DISTANCE NOT TO EXCEED (NTE) 2,000 LINEAR FOOT (LF), WITH A NTE OF 20 DISCONTINUOUS LOCATIONS.
May 1, 2025A00009$18.4KREACH A LEVEE IMPROVEMENTS
Mar 31, 2025P00007$7.6MREACH A LEVEE IMPROVEMENTS
Dec 26, 2024P00006$3.0MREACH A LEVEE IMPROVEMENTS
Dec 23, 2024A00008$0REACH A LEVEE IMPROVEMENTS
Dec 5, 2024A00007$217.8KREACH A LEVEE IMPROVEMENTS

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.