Federal contract award
W9123823C0021
HILL AIR FORCE BASE BUILDING 225 AREA D ROOF REPLACEMENT AND OFFICE SPACE RENOVATION.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W075 ENDIST SACRAMENTO |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Z2BZ — REPAIR OR ALTERATION OF OTHER AIRFIELD STRUCTURES |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $79.2M |
| Current contract value | $79.2M |
| Potential contract value / ceiling | $79.2M |
| Start date | Aug 11, 2023 |
| Current end date | Jul 21, 2026 |
| Potential end date | Jul 21, 2026 |
| Latest award activity | May 14, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 27 of 27 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 14, 2026 | A00022 | $48.3K | FLAKING PAINT CONTRACT FOR B225 - ROOF REPLACEMENT AND SEISMIC UPGRADE AREA D AT HILL AIR FORCE BASE, UTREFERENCE NO. R00026 |
| Apr 6, 2026 | A00021 | $-23.3K | TELECOM OUTLETS IN CORRIDOR CREDIT CONTRACT FOR B225 - ROOF REPLACEMENT AND SEISMIC UPGRADE AREA D AT HILL AIR FORCE BASE, UTREFERENCE NO. R00025 |
| Feb 2, 2026 | P00005 | $654.2K | B225 - ROOF REPLACEMENT AND SEISMIC UPGRADE AREA D |
| Jan 14, 2026 | A00020 | $11.0K | B225 - ROOF REPLACEMENT AND SEISMIC UPGRADE AREA D |
| Jan 8, 2026 | A00019 | $-22.3K | R00006 SF30 PG2. A. SCOPE OF WORKVC002 ADDITIONAL MECHANICAL SCOPEITEM 1. PROVIDE MATERIAL, LABOR, AND EQUIPMENT TO REMOVE AND REPLACE THE FIRE SPRINKLER SYSTEM IN 3ADDITIONAL ROOMS (EC106A, EC106B, EC106C).ITEM 2. PROVIDE MATERIAL, LABOR, AND |
| Nov 18, 2025 | A00018 | $50.1K | R00006 SF30 PG2. A. SCOPE OF WORKVC002 ADDITIONAL MECHANICAL SCOPEITEM 1. PROVIDE MATERIAL, LABOR, AND EQUIPMENT TO REMOVE AND REPLACE THE FIRE SPRINKLER SYSTEM IN 3ADDITIONAL ROOMS (EC106A, EC106B, EC106C).ITEM 2. PROVIDE MATERIAL, LABOR, AND |
| Oct 14, 2025 | A00017 | $-143.9K | BUILDING 225 AREA D - ROOF REPLACEMENT R00020/VC018 LIGHTNING PROTECTION CREDIT FOR A DECREASE COST OF -$143,850.77 AND 0 CALENDAR DAYS TIME EXTENSION. |
| Sep 29, 2025 | A00016 | $10.0K | BUILDING 225 AREA D - ROOF REPLACEMENT R00019/VC020 PAINT CHANGE FOR A COST INCREASE OF $10,029.17 AND ZERO (0) CALENDAR DAYS' TIME EXTENSION. |
| Jun 5, 2025 | A00015 | $-20.3K | BUILDING 225 AREA D - ROOF REPLACEMENT R00018 VC017 FALL PROTECTION FOR A COST DECREASE OF -$20,311.48 AND 0 CALENDAR DAYS' TIME EXTENSION. |
| May 13, 2025 | A00014 | $67.7K | BUILDING 225 AREA D - ROOF REPLACEMENT R00017/VC016 MOVING OF GRIDLINE 9 TEMP WALL. |
| Apr 3, 2025 | A00013 | $86.4K | CERCLA CAP CONTRACT FOR B225 - ROOF REPLACEMENT & SEISMIC UPGRADE AREA D AT HILL AFB REFERENCE NO. R00016 |
| Jan 7, 2025 | A00012 | $101.5K | BUILDING 225 AREA D - ROOF REPLACEMENT R00015 VC013 UNFORESEEN SITE CONDITIONS |
| Dec 11, 2024 | A00011 | $-193.5K | BUILDING 225 AREA D - ROOF REPLACEMENT REFERENCE NO. R00014 VC007 SKYLIGHT REMOVAL |
| Nov 26, 2024 | P00004 | $636.2K | BUILDING 225 AREA D - ROOF REPLACEMENT REFERENCE NO. R00013 VC012 HOBBY SHOP TO MACHINE SHOP CONVERSION EXTEND THE POP BY 28 DAYS FROM 11 MAR 2026 TO 01 APR 2026. NOTE: SYSTEM OVERSIGHT IN A10 DIDN'T UPDATE 75 DAY POP FROM 26 DEC 2025 TO 11 MAR 2026. |
| Nov 18, 2024 | A00009 | $283.5K | BUILDING 225 AREA D - ROOF REPLACEMENT DP3 ADDITIONAL DESIGN LABOR CONTRACT FOR B225 - ROOF REPLACEMENT & SEISMIC UPGRADE AREA D AT HILL AFB. REFERENCE NO. R00011 VC009 DP3 ADDITIONAL DESIGN LABOR |
| Nov 18, 2024 | A00010 | $215.7K | BUILDING 225 AREA D - ROOF REPLACEMENT USER VACATING SPACE CONTRACT FOR B225 - ROOF REPLACEMENT & SEISMIC UPGRADE AREA D AT HILL AFB. REFERENCE NO. R00012 VC010 USER VACATING SPACE |
| Nov 14, 2024 | P00003 | $2.8M | BUILDING 225 AREA D - ROOF REPLACEMENT R00010/VC006 ADDITIONAL CONSTRUCTION EFFORTS |
| Sep 9, 2024 | A00007 | $430.1K | BUILDING 225 AREA D - ROOF REPLACEMENT R00009VC008 COMPRESSED AIR TANKS AND AIR DROPS |
| Sep 5, 2024 | A00006 | $67.2K | BUILDING 225 AREA D - ROOF REPLACEMENT R00008/VC011 RELOCATE THE 4160V BEACON ELECTRICAL LINE. |
| Jul 11, 2024 | A00005 | $346.7K | BUILDING 225 AREA D - ROOF REPLACEMENT R00007VC004 ADDITIONAL DESIGN FOR STEAM & CONDENSATE |
| Jun 28, 2024 | A00004 | $90.9K | BUILDING 225 AREA D - ROOF REPLACEMENT REFERENCE NO. R00006 VC002 ADDITIONAL MECHANICAL SCOPE. TOTAL CONTRACT PRICE IS INCREASED BY $90,865.00 AND 0 CALENDAR DAYS-TIME EXTENSION. |
| Apr 11, 2024 | A00003 | $17.6K | BUILDING 225 AREA D - ROOF REPLACEMENT VC003 ELECTRICAL & COMMUNICATION REQUIREMENTS |
| Apr 9, 2024 | A00002 | $69.2K | BUILDING 225 AREA D - ROOF REPLACEMENT R00004 VC005 EAST EGRESS TUNNEL |
| Feb 1, 2024 | A00001 | $21.5K | BUILDING 225 AREA D - ROOF REPLACEMENT R00003VC001 TEMP WALL |
| Oct 31, 2023 | P00002 | $0 | BUILDING 225 AREA D - ROOF REPLACEMENT - INCORPORATE CONFORMED SPEC'S INTO THE CONTRACT |
| Aug 9, 2023 | P00001 | $0 | BUILDING 225 AREA D RENOVATION AT HILL AIR FORCE BASE, UTAH. MODIFICATION P00001 ALIGNS CONTRACT PERIOD OF PERFORMANCE WITH THE DATE THE NOTICE TO PROCEED WAS RECEIVED BY THE CONTRACTOR. |
| Jul 24, 2023 | 0 | $73.6M | HILL AIR FORCE BASE BUILDING 225 AREA D ROOF REPLACEMENT AND OFFICE SPACE RENOVATION. |