Federal contract award

W9123823C0025

5MW GENERATION PLANT

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW075 ENDIST SACRAMENTO
NAICS237130 — Power and Communication Line and Related Structures Construction
PSCY1NZ — CONSTRUCTION OF OTHER UTILITIES
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$32.8M
Current contract value$32.8M
Potential contract value / ceiling$32.8M
Start dateAug 30, 2023
Current end dateOct 27, 2026
Potential end dateOct 27, 2026
Latest award activityJun 1, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 13 of 13 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 1, 2026A00009$228.0KMOTCO ERCIP 6.25MW GENERATION PLANT
Apr 27, 2026A00008$1.5KMOTCO ERCIP 6.25MW GENERATION PLANT
Mar 2, 2026A00007$3.1KTHIS MODIFICATION SETTLES ALL OUTSTANDING DIFFERING SITE CONDITIONS.
Feb 27, 2026A00006$35.4KTHIS MODIFICATION SETTLES ALL OUTSTANDING DIFFERING SITE CONDITIONS.
Nov 7, 2025A00005$17.7KFISCAL YEAR 2020 FUNDING
Oct 31, 2025P00003$-349.5KCD006/R00006 MANHOLE INTERVAL VECP PROVIDE CREDIT AS PER VALUE ENGINEERING CREDIT PROPOSAL LETTER H-0011 CONCERNING EXTENDED MANHOLE INTERVALS THEREFORE REDUCING THE NUMBER OF MANHOLES REQUIRED FOR THIS PROJECT/CONTRACT.
Aug 29, 2025A00004$142.0KFISCAL YEAR 2020 FUNDING FOR INSTALLING ELECTRICAL INFRASTRUCTURE AT ACP3 TO ALLOW THE CLOSURE OF ACP2 FOR THE INSTALLATION OF THE MANHOLES AND DUCTBANK.
May 13, 2025A00003$62.5KPROVIDE HOFB
Sep 5, 2024P00002$597.0KEXERCISE OPTION 1002: "FEEDER TO SUBSTATION 174"
Aug 8, 2024A00002$0POP EXTENSION, NO COST MODIFICATION TO THE CONTRACT, EXCUSABLE DELAY IAW FAR 52.249-10(B)(1)(XI) AND FAR 52.249-10(B)(2).
Jul 23, 2024A00001$0THIS IS AN ADMINISTRATIVE CHANGE EXECUTED IN ACCORDANCE WITH FAR 52.243-4 AND FAR 52.236-21(A) TO INCLUDE SPECIFICATIONS SECTIONS 02 41 00 AND 33 11 00.
Sep 20, 2023P00001$0FISCAL YEAR 2020 FUNDING
Aug 24, 20230$31.5M5MW GENERATION PLANT

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
80/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 80/100. Available recorded signals: 75 points.

Contract end 2026-10-27 (2 days from calculation)
+35 points
4 historical awards in this buyer and category group
+15 points
13 recorded award transactions
+10 points
Latest award action: 2026-06-01
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.