Federal contract award

W9124C25FA028

THE CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, SUPPLIES, MATERIAL, AND COORDINATION REQUIRED TO REMOVE AND REPLACE EXISTING ROOF SYSTEM TO INCLUDE ROOFING SYSTEM INCLUDES FLASHINGS, ROOFING MATERIAL, INSULATION, AND METAL DECKING.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QM MICC-FT JACKSON
NAICS236220 — Commercial and Institutional Building Construction
PSCZ2QA — REPAIR OR ALTERATION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
Parent award / vehicleW9124C21D0007
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$2.3M
Current contract value$2.3M
Potential contract value / ceiling$2.3M
Start dateJun 19, 2025
Current end dateJun 28, 2026
Potential end dateJun 28, 2026
Latest award activityApr 27, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 27, 2026P00002$0TO EXTEND THE DELIVERY DATE FROM 14 MAY 2026 TO 28 JUNE 2026 AT NO COST TO THE GOVERNMENT DUE TO LIMITED TIME SCHEDULING HVAC SHUTDOWN. ALL WORK SHALL ADHERE TO GUIDELINES SPECIFIED IN APPLICABLE REGULATIONS AND CODES. NO OTHER CHANGES WERE MADE.
Jan 14, 2026P00001$0TO EXTEND THE DELIVERY DATE FROM 15 JANUARY 2025 TO 14 MAY 2026 AT NO COST TO THE GOVERNMENT DUE TO UNFORESEEN CONDITIONS BEING DETERMINED. ALL WORK SHALL ADHERE TO GUIDELINES SPECIFIED IN APPLICABLE REGULATIONS AND CODES. NO OTHER CHANGES WERE MADE.
Jun 10, 20250$2.3MTHE CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, SUPPLIES, MATERIAL, AND COORDINATION REQUIRED TO REMOVE AND REPLACE EXISTING ROOF SYSTEM TO INCLUDE ROOFING SYSTEM INCLUDES FLASHINGS, ROOFING MATERIAL, INSULATION, AND METAL DECKING.

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.