Federal contract award

W9124C25FA084

THE CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, SUPPLIES, MATERIAL, AND COORDINATION REQUIRED TO REMOVE AND REPLACE CULVERTS, STORM DRAIN PIPES AND DRAINAGE STRUCTURES ACROSS THE BASE AS INDICATED ON THE ATTACHED SITE PLANS.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QM MICC-FT JACKSON
NAICS236220 — Commercial and Institutional Building Construction
PSCZ2QA — REPAIR OR ALTERATION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
Parent award / vehicleW9124C21D0006
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$1.5M
Current contract value$1.5M
Potential contract value / ceiling$1.5M
Start dateSep 29, 2025
Current end dateJul 21, 2026
Potential end dateJul 21, 2026
Latest award activityJun 4, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 4, 2026P00002$7.8KTHE CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, SUPPLIES, MATERIAL, AND COORDINATION REQUIRED TO REMOVE/REPLACE CULVERTS (BASE AND ALL OPTIONS), STORM DRAIN PIPES AND DRAINAGE STRUCTURES ACROSS THE BASE AS INDICATED ON THE ATTACHED SITE PLANS.
Mar 27, 2026P00001$28.6KTHE CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, SUPPLIES, MATERIAL, AND COORDINATION REQUIRED TO REMOVE/REPLACE CULVERTS (BASE AND ALL OPTIONS), STORM DRAIN PIPES AND DRAINAGE STRUCTURES ACROSS THE BASE AS INDICATED ON THE ATTACHED SITE PLANS.
Sep 18, 20250$1.5MTHE CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, SUPPLIES, MATERIAL, AND COORDINATION REQUIRED TO REMOVE AND REPLACE CULVERTS, STORM DRAIN PIPES AND DRAINAGE STRUCTURES ACROSS THE BASE AS INDICATED ON THE ATTACHED SITE PLANS.

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.