Federal contract award
W9124C25FA084
THE CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, SUPPLIES, MATERIAL, AND COORDINATION REQUIRED TO REMOVE AND REPLACE CULVERTS, STORM DRAIN PIPES AND DRAINAGE STRUCTURES ACROSS THE BASE AS INDICATED ON THE ATTACHED SITE PLANS.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W6QM MICC-FT JACKSON |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Z2QA — REPAIR OR ALTERATION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE) |
| Parent award / vehicle | W9124C21D0006 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $1.5M |
| Current contract value | $1.5M |
| Potential contract value / ceiling | $1.5M |
| Start date | Sep 29, 2025 |
| Current end date | Jul 21, 2026 |
| Potential end date | Jul 21, 2026 |
| Latest award activity | Jun 4, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 4, 2026 | P00002 | $7.8K | THE CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, SUPPLIES, MATERIAL, AND COORDINATION REQUIRED TO REMOVE/REPLACE CULVERTS (BASE AND ALL OPTIONS), STORM DRAIN PIPES AND DRAINAGE STRUCTURES ACROSS THE BASE AS INDICATED ON THE ATTACHED SITE PLANS. |
| Mar 27, 2026 | P00001 | $28.6K | THE CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, SUPPLIES, MATERIAL, AND COORDINATION REQUIRED TO REMOVE/REPLACE CULVERTS (BASE AND ALL OPTIONS), STORM DRAIN PIPES AND DRAINAGE STRUCTURES ACROSS THE BASE AS INDICATED ON THE ATTACHED SITE PLANS. |
| Sep 18, 2025 | 0 | $1.5M | THE CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, SUPPLIES, MATERIAL, AND COORDINATION REQUIRED TO REMOVE AND REPLACE CULVERTS, STORM DRAIN PIPES AND DRAINAGE STRUCTURES ACROSS THE BASE AS INDICATED ON THE ATTACHED SITE PLANS. |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.