Federal contract award

W9124C25PA008

WORK WILL CONSIST OF REMOVING/REPLACING 94 DAMAGED RACK SYSTEM FRAMES, 18 FEET HIGH AND 42 INCHES DEEP, SLOTTED STYLE COLOR FROST GREEN WITH DEFLECTOR AND 12 ROLLED BEAMS 108 INCHES LONG X 4.65 INCHES ORANGE, 6190 POUND CAPACITY.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW6QM MICC-FT JACKSON
NAICS337215 — Showcase, Partition, Shelving, and Locker Manufacturing
PSC7125 — Cabinets, Lockers, Bins, and Shelving
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$45.9K
Current contract value$45.9K
Potential contract value / ceiling$45.9K
Start dateAug 6, 2025
Current end dateFeb 28, 2026
Potential end dateFeb 28, 2026
Latest award activityJan 30, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jan 30, 2026P00002$0WORK WILL CONSIST OF REMOVING/REPLACING 94 DAMAGED RACK SYSTEM FRAMES, 18 FEET HIGH AND 42 INCHES DEEP, SLOTTED STYLE COLOR FROST GREEN WITH DEFLECTOR AND 12 ROLLED BEAMS 108 INCHES LONG X 4.65 INCHES ORANGE, 6190 POUND CAPACITY.
Sep 23, 2025P00001$0WORK WILL CONSIST OF REMOVING/REPLACING 94 DAMAGED RACK SYSTEM FRAMES, 18 FEET HIGH AND 42 INCHES DEEP, SLOTTED STYLE COLOR FROST GREEN WITH DEFLECTOR AND 12 ROLLED BEAMS 108 INCHES LONG X 4.65 INCHES ORANGE, 6190 POUND CAPACITY.
Aug 20, 20250$45.9KWORK WILL CONSIST OF REMOVING/REPLACING 94 DAMAGED RACK SYSTEM FRAMES, 18 FEET HIGH AND 42 INCHES DEEP, SLOTTED STYLE COLOR FROST GREEN WITH DEFLECTOR AND 12 ROLLED BEAMS 108 INCHES LONG X 4.65 INCHES ORANGE, 6190 POUND CAPACITY.

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.