Federal contract award
W9124M25FA022
THE WORK COVERED BY THIS CONTRACT CONSISTS OF FURNISHING ALL PLANT, LABOR, MATERIALS AND PERFORMING ALL OPERATIONS REQUIRED IN CONNECTION WITH MAINTAIN AND REPAIR BRIDGES (IDIQ) COMPLETE IN STRICT ACCORDANCE WITH SPECIFICATIONS AND DRAWINGS.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W6QM MICC-FT STEWART |
| NAICS | 237310 — Highway, Street, and Bridge Construction |
| PSC | Z2LB — REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS |
| Parent award / vehicle | W9124M24D0002 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $0 |
| Current contract value | $631.4K |
| Potential contract value / ceiling | $631.4K |
| Start date | Aug 4, 2025 |
| Current end date | Jun 4, 2026 |
| Potential end date | Jun 4, 2026 |
| Latest award activity | Sep 15, 2025 |
| Source loaded | Aug 15, 2026 |
Funding and modification history
Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 15, 2025 | P00003 | $-631.4K | THE WORK COVERED BY THIS CONTRACT CONSISTS OF FURNISHING ALL PLANT, LABOR, MATERIALS AND PERFORMING ALL OPERATIONS REQUIRED IN CONNECTION WITH MAINTAIN AND REPAIR BRIDGES (IDIQ) COMPLETE IN STRICT ACCORDANCE WITH SPECIFICATIONS AND DRAWINGS. |
| Sep 10, 2025 | P00002 | $0 | THE WORK COVERED BY THIS CONTRACT CONSISTS OF FURNISHING ALL PLANT, LABOR, MATERIALS AND PERFORMING ALL OPERATIONS REQUIRED IN CONNECTION WITH MAINTAIN AND REPAIR BRIDGES (IDIQ) COMPLETE IN STRICT ACCORDANCE WITH SPECIFICATIONS AND DRAWINGS. |
| Aug 27, 2025 | P00001 | $0 | THE WORK COVERED BY THIS CONTRACT CONSISTS OF FURNISHING ALL PLANT, LABOR, MATERIALS AND PERFORMING ALL OPERATIONS REQUIRED IN CONNECTION WITH MAINTAIN AND REPAIR BRIDGES (IDIQ) COMPLETE IN STRICT ACCORDANCE WITH SPECIFICATIONS AND DRAWINGS. |
| Jul 28, 2025 | 0 | $631.4K | THE WORK COVERED BY THIS CONTRACT CONSISTS OF FURNISHING ALL PLANT, LABOR, MATERIALS AND PERFORMING ALL OPERATIONS REQUIRED IN CONNECTION WITH MAINTAIN AND REPAIR BRIDGES (IDIQ) COMPLETE IN STRICT ACCORDANCE WITH SPECIFICATIONS AND DRAWINGS. |