Federal contract award

W9126G19C0023

ALL WORK REQUIRED BY THE REQUEST FOR PROPOSAL (RFP) DOCUMENTS FOR THE CONSTRUCTION OF THE ATC DORMITORY #6, LACKLAND AFB, TEXAS.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW076 ENDIST FT WORTH
NAICS236220 — Commercial and Institutional Building Construction
PSCY1AA — CONSTRUCTION OF OFFICE BUILDINGS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$101.5M
Current contract value$101.5M
Potential contract value / ceiling$101.5M
Start dateSep 26, 2019
Current end dateApr 7, 2024
Potential end dateApr 7, 2024
Latest award activityDec 17, 2025
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 46 of 46 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Dec 17, 2025P00013$183.0KA. SCOPE OF WORK CHANGE: R00041 MJ081 TITLE: SHOWER MIXING VALVE CHANGES CONTRACTOR S-0059 REQUEST FOR EQUITABLE ADJUSTMENT (REA) FOR ADDITIONAL WORK TO COMPLETE SHOWER MIXING VALVE INSTALLATION. INCLUDED IN FULL AMOUNT FOR L ALL WORK PERFORMED.
Aug 27, 2025A00032$38.0KMJ060 ADJUSTMENT OF STAIR LANDING PLANK
May 30, 2025A00031$374.7KMJ058 ADDED VOLUME DAMPERS
May 20, 2025A00030$254.7KMJ057 REA FIRE SPRINKLER DELAY
Jun 7, 2024A00029$20.7KMJ054 INTERIOR METAL JOINT COVER
May 29, 2024A00028$11.9KMJ055 ADDITIONAL SIGNAGE
May 16, 2024A00027$0MJ056 UFC CLARIFICATION FOR MJ043
Feb 29, 2024A00026$5.7KMJ052 CCTV PATHWAY CHANGE
Feb 1, 2024A00025$362.0KMJ043 FP - NITROGEN GENERATION SYSTEM MJ049 CREDIT FOR PVC IN NON-RATED CMU WALLS
Jan 31, 2024A00024$6.5KMJ050 SHAFTWALL FOR FIRE DAMPER AND MJ053 ADDITIONAL BREAKER
Dec 22, 2023P00012$1.3MMJ051 REA - PERMANENT POWER DELAY
Sep 7, 2023A00023$82.3KMJ044 TEMPORARY IRRIGATION, MJ046 EQUIPMENT PAD REMOVAL
Aug 18, 2023A00022$0WEATHER TIME EXTENSION MAY23 - JUL23
Jul 13, 2023A00021$32.1KMJ039 ROOF LINE SAFETY CABLE
Jun 15, 2023A00020$498.2KMJ035 FIRE SMOKE DAMPERS
Jun 7, 2023A00019$0MJ045 WEATHER TIME EXTENSION APR-2023 THRU APR-2023
Jun 2, 2023A00018$36.2KMJ040 BOILER CHANGE AND MJ041 ROOF RAKE ALTERATION
May 12, 2023A00017$0ATC #6 MJ042 WEATHER TIME EXTENSION MAY 22 - MAR 23
Mar 13, 2023A00016$2.0KMJ034 REIMBURSEMENT OF PARTNERING MEETING COST
Jan 27, 2023A00015$-24.1KMJ017 LIGHTING, TROOP WALK, AND GAS DESCOPE MJ036 EISA POND DRAINAGE PIPE FILTER FABRIC
Dec 6, 2022A00014$44.1KMJ033 NON-POTABLE WATER PRV, MJ037 DESCOPE PAVING AND ADD CURBING, AND MJ038 ADDITIONAL INNERDUCT
Sep 27, 2022A00013$9.1KMJ030 FIRE PROTECTION - NITROGEN SYSTEMS
Jul 29, 2022A00012$0MJ032 WEATHER TIME EXTENSION MAR 22 - APR 22
Jul 12, 2022A00011$17.7KMJ029 ELEVATOR EQUIPMENT ROOM FCU SENSOR MJ031 MECHANICAL ROOM HEAT EXCHANGER VALVES
Jun 7, 2022A00010$63.0KMJ023 PIPE ANCHOR-BRACING SUPPORT
Apr 25, 2022A00009$67.3KMJ021 MH E-18 AND STORM DRAIN CURB CONFLCTS MJ022-1 ELEC FEEDER CHANGE
Apr 21, 2022A00008$0MJ028 WEATHER TIME EXTENSION AUG 2021 - FEB 2022
Jan 4, 2022P00011$104.0KMJ016 PIPE INSULATION GROUND FLOOR ATC 6 MJ020 AMBULATORY STALL TOILET ADJUSTMENT
Nov 19, 2021P00010$205.2KO14042 MJ008 ELECTRIC UTILITY PRIVATIZATION CPS
Sep 30, 2021A00007$0MJ019 WEATHER TIME EXTENSION JUN 21 - JUL 21
Jul 22, 2021A00006$0MJ015 WEATHER TIME EXTENSION MAR 21 - MAY 21
Jul 9, 2021A00005$217.7KMJ010 MJ013 9225 COMMUNICATIONS LINE REROUTE AND ATC6/DC3 TIE INS
Jun 16, 2021P00009$225.3KREA SETTLEMENT - SOIL DISPOSAL
May 4, 2021A00004$55.1KMJ011 PIER UNIT PRICE ADJUSTMENT
Apr 21, 2021A00003$0MJ012 WEATHER TIME EXTENSION MAY 20 - FEB 21
Apr 16, 2021P00008$991.4KATC #6
Apr 12, 2021P00007$540.7KMJ009 SOIL DISPOSAL FEE
Feb 11, 2021P00006$470.3KMJ002 ELECTRICAL & HVAC MODIFICATIONS
Dec 29, 2020A00002$95.9KMJ0073 GOVERNMENT OFFICE NETWORK CONNECTION
Dec 9, 2020P00005$-2.1MSANITARY SEWER MODIFICATION
Oct 23, 2020A00001$26.8KMJ004 CPS UTILITY PRIVITIZATION - GAS
Oct 5, 2020P00004$0ATC #6
Sep 3, 2020P00003$895.2KCONTRACT:W9126G19C0023 MODIFICATION P00003 CHANGE REQUEST: MJ001 CHANGE TITLE: LED LIGHTS-MV CABLE-CYBER-HVAC
May 13, 2020P00002$0THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE PERIOD OF PERFORMANCE FROM THE CONTRACTOR ACKNOWLEDGEMENT OF THE NOTICE TO PROCEED(NTP) ON 10 MAY 2020. THE COMPLETION DATE IS 27 OCT 2022 (900 DAYS FROM NTP).
Jan 7, 2020P00001$0THE SOLICITATION INCLUDED THE CORRECT/APPLICABLE WAGE DETERMINATIONS THE BUILDING CONSTRUCTION PROJECTS TX190231 AND THE HEAVY/HIGHWAY CONSTRUCTION PROJECTS TX190007. P00001 IS A UNILATERAL MODIFICATION ADDING HEAVY/HIGHWAY PER THE SOLICITATION.
Sep 26, 20190$96.4MALL WORK REQUIRED BY THE REQUEST FOR PROPOSAL (RFP) DOCUMENTS FOR THE CONSTRUCTION OF THE ATC DORMITORY #6, LACKLAND AFB, TEXAS.