Federal contract award
W9126G19C0023
ALL WORK REQUIRED BY THE REQUEST FOR PROPOSAL (RFP) DOCUMENTS FOR THE CONSTRUCTION OF THE ATC DORMITORY #6, LACKLAND AFB, TEXAS.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W076 ENDIST FT WORTH |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Y1AA — CONSTRUCTION OF OFFICE BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $101.5M |
| Current contract value | $101.5M |
| Potential contract value / ceiling | $101.5M |
| Start date | Sep 26, 2019 |
| Current end date | Apr 7, 2024 |
| Potential end date | Apr 7, 2024 |
| Latest award activity | Dec 17, 2025 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 46 of 46 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Dec 17, 2025 | P00013 | $183.0K | A. SCOPE OF WORK CHANGE: R00041 MJ081 TITLE: SHOWER MIXING VALVE CHANGES CONTRACTOR S-0059 REQUEST FOR EQUITABLE ADJUSTMENT (REA) FOR ADDITIONAL WORK TO COMPLETE SHOWER MIXING VALVE INSTALLATION. INCLUDED IN FULL AMOUNT FOR L ALL WORK PERFORMED. |
| Aug 27, 2025 | A00032 | $38.0K | MJ060 ADJUSTMENT OF STAIR LANDING PLANK |
| May 30, 2025 | A00031 | $374.7K | MJ058 ADDED VOLUME DAMPERS |
| May 20, 2025 | A00030 | $254.7K | MJ057 REA FIRE SPRINKLER DELAY |
| Jun 7, 2024 | A00029 | $20.7K | MJ054 INTERIOR METAL JOINT COVER |
| May 29, 2024 | A00028 | $11.9K | MJ055 ADDITIONAL SIGNAGE |
| May 16, 2024 | A00027 | $0 | MJ056 UFC CLARIFICATION FOR MJ043 |
| Feb 29, 2024 | A00026 | $5.7K | MJ052 CCTV PATHWAY CHANGE |
| Feb 1, 2024 | A00025 | $362.0K | MJ043 FP - NITROGEN GENERATION SYSTEM MJ049 CREDIT FOR PVC IN NON-RATED CMU WALLS |
| Jan 31, 2024 | A00024 | $6.5K | MJ050 SHAFTWALL FOR FIRE DAMPER AND MJ053 ADDITIONAL BREAKER |
| Dec 22, 2023 | P00012 | $1.3M | MJ051 REA - PERMANENT POWER DELAY |
| Sep 7, 2023 | A00023 | $82.3K | MJ044 TEMPORARY IRRIGATION, MJ046 EQUIPMENT PAD REMOVAL |
| Aug 18, 2023 | A00022 | $0 | WEATHER TIME EXTENSION MAY23 - JUL23 |
| Jul 13, 2023 | A00021 | $32.1K | MJ039 ROOF LINE SAFETY CABLE |
| Jun 15, 2023 | A00020 | $498.2K | MJ035 FIRE SMOKE DAMPERS |
| Jun 7, 2023 | A00019 | $0 | MJ045 WEATHER TIME EXTENSION APR-2023 THRU APR-2023 |
| Jun 2, 2023 | A00018 | $36.2K | MJ040 BOILER CHANGE AND MJ041 ROOF RAKE ALTERATION |
| May 12, 2023 | A00017 | $0 | ATC #6 MJ042 WEATHER TIME EXTENSION MAY 22 - MAR 23 |
| Mar 13, 2023 | A00016 | $2.0K | MJ034 REIMBURSEMENT OF PARTNERING MEETING COST |
| Jan 27, 2023 | A00015 | $-24.1K | MJ017 LIGHTING, TROOP WALK, AND GAS DESCOPE MJ036 EISA POND DRAINAGE PIPE FILTER FABRIC |
| Dec 6, 2022 | A00014 | $44.1K | MJ033 NON-POTABLE WATER PRV, MJ037 DESCOPE PAVING AND ADD CURBING, AND MJ038 ADDITIONAL INNERDUCT |
| Sep 27, 2022 | A00013 | $9.1K | MJ030 FIRE PROTECTION - NITROGEN SYSTEMS |
| Jul 29, 2022 | A00012 | $0 | MJ032 WEATHER TIME EXTENSION MAR 22 - APR 22 |
| Jul 12, 2022 | A00011 | $17.7K | MJ029 ELEVATOR EQUIPMENT ROOM FCU SENSOR MJ031 MECHANICAL ROOM HEAT EXCHANGER VALVES |
| Jun 7, 2022 | A00010 | $63.0K | MJ023 PIPE ANCHOR-BRACING SUPPORT |
| Apr 25, 2022 | A00009 | $67.3K | MJ021 MH E-18 AND STORM DRAIN CURB CONFLCTS MJ022-1 ELEC FEEDER CHANGE |
| Apr 21, 2022 | A00008 | $0 | MJ028 WEATHER TIME EXTENSION AUG 2021 - FEB 2022 |
| Jan 4, 2022 | P00011 | $104.0K | MJ016 PIPE INSULATION GROUND FLOOR ATC 6 MJ020 AMBULATORY STALL TOILET ADJUSTMENT |
| Nov 19, 2021 | P00010 | $205.2K | O14042 MJ008 ELECTRIC UTILITY PRIVATIZATION CPS |
| Sep 30, 2021 | A00007 | $0 | MJ019 WEATHER TIME EXTENSION JUN 21 - JUL 21 |
| Jul 22, 2021 | A00006 | $0 | MJ015 WEATHER TIME EXTENSION MAR 21 - MAY 21 |
| Jul 9, 2021 | A00005 | $217.7K | MJ010 MJ013 9225 COMMUNICATIONS LINE REROUTE AND ATC6/DC3 TIE INS |
| Jun 16, 2021 | P00009 | $225.3K | REA SETTLEMENT - SOIL DISPOSAL |
| May 4, 2021 | A00004 | $55.1K | MJ011 PIER UNIT PRICE ADJUSTMENT |
| Apr 21, 2021 | A00003 | $0 | MJ012 WEATHER TIME EXTENSION MAY 20 - FEB 21 |
| Apr 16, 2021 | P00008 | $991.4K | ATC #6 |
| Apr 12, 2021 | P00007 | $540.7K | MJ009 SOIL DISPOSAL FEE |
| Feb 11, 2021 | P00006 | $470.3K | MJ002 ELECTRICAL & HVAC MODIFICATIONS |
| Dec 29, 2020 | A00002 | $95.9K | MJ0073 GOVERNMENT OFFICE NETWORK CONNECTION |
| Dec 9, 2020 | P00005 | $-2.1M | SANITARY SEWER MODIFICATION |
| Oct 23, 2020 | A00001 | $26.8K | MJ004 CPS UTILITY PRIVITIZATION - GAS |
| Oct 5, 2020 | P00004 | $0 | ATC #6 |
| Sep 3, 2020 | P00003 | $895.2K | CONTRACT:W9126G19C0023 MODIFICATION P00003 CHANGE REQUEST: MJ001 CHANGE TITLE: LED LIGHTS-MV CABLE-CYBER-HVAC |
| May 13, 2020 | P00002 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE THE PERIOD OF PERFORMANCE FROM THE CONTRACTOR ACKNOWLEDGEMENT OF THE NOTICE TO PROCEED(NTP) ON 10 MAY 2020. THE COMPLETION DATE IS 27 OCT 2022 (900 DAYS FROM NTP). |
| Jan 7, 2020 | P00001 | $0 | THE SOLICITATION INCLUDED THE CORRECT/APPLICABLE WAGE DETERMINATIONS THE BUILDING CONSTRUCTION PROJECTS TX190231 AND THE HEAVY/HIGHWAY CONSTRUCTION PROJECTS TX190007. P00001 IS A UNILATERAL MODIFICATION ADDING HEAVY/HIGHWAY PER THE SOLICITATION. |
| Sep 26, 2019 | 0 | $96.4M | ALL WORK REQUIRED BY THE REQUEST FOR PROPOSAL (RFP) DOCUMENTS FOR THE CONSTRUCTION OF THE ATC DORMITORY #6, LACKLAND AFB, TEXAS. |