Federal contract award

W9126G22C0005

LEWISVILLE DAM LAKE REPAIRS

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW076 ENDIST FT WORTH
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCZ2KA — REPAIR OR ALTERATION OF DAMS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$91.4M
Current contract value$91.4M
Potential contract value / ceiling$91.4M
Start dateMay 24, 2022
Current end dateOct 9, 2026
Potential end dateOct 9, 2026
Latest award activityApr 23, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 44 of 44 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 23, 2026A00035$0EAST SLIDE REPAIR
Mar 19, 2026A00034$172.6KEAST SLIDE REPAIR
Mar 17, 2026P00009$1.9MTHIS MODIFICATION COMPENSATES THE CONTRACTOR FOR COST IN REA-0009 PART 3. SEE SUMMARY OF CHANGES.
Mar 5, 2026P00008$6.3MTHIS MODIFICATION COMPENSATES THE CONTRACTOR FOR COST IN REA-0009 PART 2. SEE SUMMARY OF CHANGES.
Jan 22, 2026A00033$13.7K11. THIS ITEM APPLIES ONLY TO AMENDMENTS OF SOLICITATIONS THE ABOVE NUMBERED SOLICITATION IS AMENDED AS SET FORTH IN ITEM 14. THE HOUR AND DATE SPECIFIED FOR RECEIPT OF OFFERS IS EXTENDED, IS NOT EXTENDED OFFERS MUST ACKNOWLEDGE RECEIPT OF THIS AMEN
Oct 21, 2025A00032$138.1KREMOVE EMERGENCY BACKFILL PLACED IN TRENCHES IN JUNE 2024.
Sep 11, 2025P00007$0CONTRACT W9126G22C0005 WAS INITIALLY AWARDED WITH THE INCORRECT FAR CLAUSE 52.222-55. THIS MODIFICATION REPLACES THE ERRONEOUSLY INCLUDED CLAUSE WITH THE CORRECT FAR CLAUSE 52.222-55 TO ENSURE COMPLIANCE WITH CURRENT REGULATIONS.
Sep 4, 2025P00006$3.0MTHIS MODIFICATION PARTIALLY COMPENSATES THE CONTRACTOR FOR COSTS IN REA-0009, SPECIFICALLY ADDRESSING A DESIGN/SPECIFICATION DEFECT. THE ORIGINAL SPECIFICATION REQUIRED SHOTCRETING A 6-FOOT TRENCH WITHIN 6 HOURS OF EXCAVATION.
Jul 16, 2025A00031$66.9KPAYS CONTRACTOR FOR ENGINEER AND DAM SAFETY SUBMITTAL NEEDED TO COMPLY WITH USACE POLICY. REDUCES PAYMENT FOR DRILLED PIERS DUE TO LOCATIONS BEING OUT-OF-TOLERANCE BUT STILL FUNCTIONAL.
Jun 3, 2025P00005$0THE PURPOSE OF THIS MODIFICATION IS TO IMPLEMENT EXECUTIVE ORDER 14173 AND 14148.
May 16, 2025A00030$12.9KCONTRACTING OFFICER REQUIRED CONTRACTOR TO HEAT CONSTRUCTION JOINT CONCRETE TO 50 DEGREES.
May 13, 2025A00029$-74.2KADJUSTS RIP RAP QUANTITIES TO MATCH AMOUNT PLACED AND ADJUSTS PRICE.
May 5, 2025A00028$0EXTENDS CONTRACT COMPLETION BECAUSE OF WEATHER DELAYS
May 1, 2025A00027$5.8KCHANGES ROUTE FOR DRAINAGE FROM BEHIND TRAINING WALL.
Apr 30, 2025A00026$30.1KCOMPENSATES CONTRACTOR FOR REVISING GRADING PLAN AT BORROW PIT DUE TO 2 DIFFERING SITE CONDITIONS
Apr 1, 2025A00025$9.8KREMOVES PASSING PERMEABILITY TESTING AS REQUIREMENT FOR ACCEPTANCE ALLOWS KTR TO USE ADDITIONAL CONCRETE TO MAKE UP FOR UNEVEN SUBGRADE REPLACES 6" PIPE WITH 4" PIPE DUE TO UNEVEN SUBGRADE.
Mar 24, 2025A00024$26.2KADDITIONAL WORK REQUIRED TO DEMO CONCRETE IN TRENCH WHICH WAS NOT IDENTIFIED IN THE PLANS
Jan 2, 2025A00023$86.8KREMOVAL OF CONCRETE PLACED IN TRENCHES AS EMERGENCY BACKFILL DUE TO HIGH WATER
Nov 14, 2024A00022$330.7KPILE ORIENTATION SURVEY
Nov 4, 2024A00021$37.7KEXTRA GRAVITY BLOCK CONCRETE PLACED TO HOLD SAND LAYER THAT WAS THICKER THAN SHOWN IN BORINGS.
Oct 23, 2024A00020$209.7KPROVIDES ANCHORS TO SUPPORT SHOTCRETE IN A TRENCH
Sep 20, 2024P00004$523.0KAPRON OVERLAY
Sep 16, 2024A00018$11.4KAPRON OVERLAY
Aug 23, 2024A00017$353.6KAPRON OVERLAY
Jul 19, 2024A00016$95.8KEXTRA MUD MAT CONCRETE WAS NEEDED DUE TO EXTRA EXCAVATION OF UNSOUND SHALE FOUNDATION.
Jul 16, 2024A00015$0EXTENDS PERIOD OF PERFORMANCE 18 DAYS BECAUSE CONTRACTOR COULD NOT WORK ON CRITICAL ACTIVITIES DUE TO FLOODING.
Jul 10, 2024A00013$155.6KADDITIONAL CORROSION PROTECTION FOR EXPOSED PORTION OF ROCK DOWELS
Jul 10, 2024A00014$33.6KCOMPENSATES CONTRACTOR FOR ADDITIONAL DEMO WORK PERFORMED DUE TO ERROR IN DRAWINGS.
Jun 18, 2024A00012$0TIME EXTENSION FOR UNUSUALLY SEVERE WEATHER IN MAY 2024.
Jun 17, 2024A00011$26.8KCHANGES BATTEN STRIP TO SECURE GEOMEMBRANE, COMPENSATES CONTRACTOR FOR ADDITIONAL GRAVEL BACKFILL, CREDIT FOR NOT HYDROSEEDING COFFERDAM SLOPE.
May 23, 2024A00010$40.8KINCREASE QUANTITY MORE CONCRETE NEEDED TO BE GRINDED BEYOND WHAT WAS SHOWN IN THE CONTRACT.
Apr 19, 2024A00009$29.7KREPLACE ADDITIONAL SECTION OF CONCRETE APRON.
Apr 18, 2024A00008$5.5KADDS CHAMFERED EDGES TO CONCRETE WALL EXTENSION
Feb 22, 2024P00003$0THE PURPOSE OF THIS MODIFICATION IS TO ADD THE APPLICATION OF W AGE DECISIONS TO PROVIDE DETAIL DESCRIPTION TO DETERMINE W HICH W AGE DETERMINATION SCHEDULE TO APPLY BASED UPON THE AREA IN WHICH THE WORK IS BEING PERFORMED.
Feb 1, 2024A00007$6.9KA00007 R00007 MI009 ROCK DOWEL PACKER TESTING
Oct 23, 2023A00006$-35.0KDECREASE BY $35K AND NO TIME. THIS MOD ADDRESSES AND RESOLVES THE QC DEFICIENCIES 00012, 00013, & 00017. NO COST OR TIME CHANGE TO TRANSITION ROCK DOWELS IN ACCORDANCE WITH REVISED DRAWING SB-342 PROVIDED IN RFI 073 & 075
Oct 12, 2023A00005$222.2KMI006 APRON, ROCK DOWEL & DRAIN RESTRICTIONS, INCREASE $222,169.72, NO TIME ADDED.
Aug 28, 2023A00004$16.5KMI005 DRAINAGE SPEC CHANGE
Jul 27, 2023A00003$34.9KINCREASE $34,858 & NO TIME. PERFORM TOPOGRAPHIC SURVEYING OF THE ABUTMENTS FOR THE ACROW BRIDGE.
Jul 7, 2023A00002$-72.0KDECREASE $72,000.88 AND NO TIME. CHANGES RECESS DRILLING METHOD, ADDRESSES STAGING AREA CHANGES, ADDRESSES THE ACROW BRIDGE CLOSURES, AND COVERS COST ASSOCIATED WITH ADDITIONAL ASR TESTING.
May 31, 2023A00001$291.7KINCREASE $291,746 AND NO TIME. INSTALL 1 LOAD CELL ON MONOLITHS C, 2, 4, 6, 8, 10, 12, AND D AND INSTALL 13 DYNAFORCE LOAD SENSORS ON MONOLITHS 1 THRU 13 AS SHOWN ON REVISED SHEET BI-102.A.
Jul 12, 2022P00002$0APRON OVERLAY
Jun 2, 2022P00001$0CONTRACT MODIFICATION TO CORRECT THE WAGE RATES
May 24, 20220$76.1MLEWISVILLE DAM LAKE REPAIRS