Federal contract award
W9126G22C4347
DINING HALL, POP 900 DAYS FROM THE DATE OF THE NTP
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W076 ENDIST FT WORTH |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Y1FD — CONSTRUCTION OF DINING FACILITIES |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $30.5M |
| Current contract value | $30.5M |
| Potential contract value / ceiling | $30.5M |
| Start date | Sep 23, 2022 |
| Current end date | Jan 15, 2027 |
| Potential end date | Jan 15, 2027 |
| Latest award activity | May 6, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 29 of 29 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 6, 2026 | A00024 | $268.0K | JBSA CAMP BULLIS DINING FACILITY MJ028 RELOCATION OF POSMJ029 WALK IN COOLER FLOOR FINISHING |
| May 5, 2026 | P00004 | $568.2K | JBSA CAMP BULLIS DINING FACILITY MJ023 PAVEMENT, CURB AND GUTTER CONFLICT |
| Apr 3, 2026 | A00023 | $73.3K | JBSA CAMP BULLIS DINING FACILITY MJ024 BUILDING AIR BARRIER SYSTEM AT GL4MJ025 MAU ELECTRICAL REQUIREMENTSMJ026 POWER FOR HVAC CONTROL PANEL |
| Apr 1, 2026 | A00022 | $73.8K | JBSA CAMP BULLIS DINING FACILITY MJ027 SOUTH WING WALL ALONG GL4 |
| Mar 27, 2026 | A00021 | $93.4K | MJ014-2 COOLER CONDENSERS |
| Mar 13, 2026 | P00003 | $21.1K | FIXING THE ERRORS THAT ORIGINATED WHEN THE MIGRATION FROM SPS TO ACWS TOOK PLACE |
| Feb 2, 2026 | A00020 | $-7.5K | REFERENCE NO. R00024 MJ030 CLIN ADJUSTMENT |
| Dec 8, 2025 | A00019 | $36.9K | MJ021 TRAP PRIMER VALVES & WATER LINES |
| Oct 17, 2025 | A00018 | $0 | MJ020 REMOVE SD MANHOLE MJ022 SS MH LID OFFSET |
| Aug 29, 2025 | A00017 | $15.4K | MJ019 AREA B PARTITION WALL STABILIZER |
| Jul 28, 2025 | A00016 | $-14.5K | MJ017 DRY SPRINKLER SYSTEM A&E |
| Jun 27, 2025 | P00002 | $0 | MODIFICATION TO REMOVE CLAUSES AND REPLACE OTHER CLAUSES WITH CLASS DEVIATIONS PER EXECUTIVE ORDER 14173. |
| Jun 6, 2025 | A00015 | $127.0K | MJ018 WING WALL CONTINUATION ALONG GRID LINE 4 |
| Apr 25, 2025 | A00014 | $0 | WEATHER TIME EXTENSION JAN2024 - FEB2025 |
| Apr 24, 2025 | A00013 | $121.5K | NORTH SS & MH REROUTE |
| Apr 14, 2025 | A00012 | $131.7K | MJ010 ELECTRICAL FOR SLICER MJ011 AREA E- DOW NSPOUT TO STORM DRAIN MJ012 MISSING TRENCH DRAINS MJ013 TREE TRIMMING FOR ELECTRICAL LINE |
| Feb 10, 2025 | A00011 | $63.6K | COOLER CONDENSERS PT 1 |
| Feb 5, 2025 | A00010 | $128.1K | VENTS AND CLEANOUT PART 2 OF 2 |
| Oct 23, 2024 | A00009 | $74.4K | ADA RAMP SEWER REROUTE, HARD LID CEILING INSTALLATION TR107 |
| Sep 27, 2024 | A00008 | $0 | BLDG 5106 TREE REMOVAL, PART 2 OF 2 |
| Aug 20, 2024 | A00007 | $124.1K | AMERICAN WATER CCA FEE DIFFERENCES |
| Aug 14, 2024 | A00006 | $65.0K | VENTING AND CLEANOUT PART 1 |
| Feb 27, 2024 | A00005 | $7.5K | BLDG 5106 TREE REMOVAL PART 1 |
| Jan 10, 2024 | A00004 | $18.4K | MTS/DOCKING+PH2 ELEC.CONDUIT+ROLLUP DOOR |
| Dec 1, 2023 | A00003 | $123.1K | ADD CAPILLARY BARRIER TO DFAC FOUNDATION |
| Aug 25, 2023 | A00002 | $109.9K | SANITARY SEWER LINE RE-ROUTE |
| Jun 26, 2023 | A00001 | $100.0K | DINING HALL |
| Jan 6, 2023 | P00001 | $0 | NTP MODIFICATION ADJUSTED POP: 5 DEC 2022 TO 23 MAY 2025 |
| Sep 23, 2022 | 0 | $28.1M | DINING HALL, POP 900 DAYS FROM THE DATE OF THE NTP |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
65/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 65/100. Available recorded signals: 60 points.
- Contract end 2027-01-15 (82 days from calculation)
- +35 points
- 1 historical awards in this buyer and category group
- +0 points
- 29 recorded award transactions
- +10 points
- Latest award action: 2026-05-06
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.