Federal contract award

W9127822C0008

ZONE 1 TYNDALL AFB, FL

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW074 ENDIST MOBILE
NAICS236220 — Commercial and Institutional Building Construction
PSCY1JZ — CONSTRUCTION OF MISCELLANEOUS BUILDINGS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$664.6M
Current contract value$664.6M
Potential contract value / ceiling$670.8M
Start dateMay 20, 2022
Current end dateJul 26, 2026
Potential end dateJul 26, 2026
Latest award activityJun 4, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 145 of 145 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 4, 2026A00114$183.9KCONTRACT FOR CONSTRUCTION OF ZONE 1 F-35 FLIGHT LINE FACILITIES, TYNDALL AIR FORCE BASE, FLORIDA REFERENCE NO. A00114FP331, FP337, FP338 AND FP342
May 12, 2026A00113$-120.0KCONTRACT FOR CONSTRUCTION OF ZONE 1 F-35 FLIGHT LINE FACILITIES, TYNDALL AIR FORCE BASE, FLORIDA REFERENCE NO. A00113FP333 APRON - PAVING LOT AND EDGE SLUMP
Apr 23, 2026A00112$343.3KCONTRACT FOR CONSTRUCTION OF ZONE 1 F-35 FLIGHT LINE FACILITIES, TYNDALL AIR FORCE BASE, FLORIDA REFERENCE NO. A00111FP316, FP318, FP324 AND FP328
Mar 24, 2026A00111$108.9KCONTRACT FOR CONSTRUCTION OF ZONE 1 F-35 FLIGHT LINE FACILITIES, TYNDALL AIR FORCE BASE, FLORIDA REFERENCE NO. A00111FP316, FP318, FP324 AND FP328
Mar 2, 2026A00110$371.6KCONTRACT FOR CONSTRUCTION OF ZONE 1 F-35 FLIGHT LINE FACILITIES, TYNDALL AIR FORCE BASE, FLORIDA REFERENCE NO. A00110FP308, FP311, FP313, FP314 AND FP315
Feb 24, 2026A00109$438.0KCONTRACT FOR CONSTRUCTION OF ZONE 1 F-35 FLIGHT LINE FACILITIES, TYNDALL AIR FORCE BASE, FLORIDA REFERENCE NO. A00109CHANGES FP293, FP300, FP304, FP305, FP309, FP310 AND FP312
Feb 11, 2026A00108$75.0KCONTRACT FOR CONSTRUCTION OF ZONE 1 F-35 FLIGHT LINE FACILITIES, TYNDALL AIR FORCE BASE, FLORIDA REFERENCE NO. A00107FP273, FP297, FP299, FP301, FP302, FP303 AND FP307
Feb 6, 2026A00107$440.1KCONTRACT FOR CONSTRUCTION OF ZONE 1 F-35 FLIGHT LINE FACILITIES, TYNDALL AIR FORCE BASE, FLORIDA REFERENCE NO. A00107FP273, FP297, FP299, FP301, FP302, FP303 AND FP307
Feb 3, 2026A00106$89.7KCONTRACT FOR CONSTRUCTION OF ZONE 1 F-35 FLIGHT LINE FACILITIES, TYNDALL AIR FORCE BASE, FLORIDA REFERENCE NO. A00106FP292 LRS - STORM DRAIN CLASH WITH WATER LINEFP306 HGR 1 - EAST PARKING DRIVEWAY
Jan 5, 2026A00105$0CONTRACT FOR CONSTRUCTION OF ZONE 1 F-35 FLIGHT LINE FACILITIES, TYNDALL AIR FORCE BASE, FLORIDA FP265 WEATHER DELAY JULY 2025
Dec 23, 2025P00031$3.6MCONTRACT FOR CONSTRUCTION OF ZONE 1 F-35 FLIGHT LINE FACILITIES, TYNDALL AIR FORCE BASE, FLORIDA P00031 MULTI CHANGE #3FP183 FP204 FP214 FP217 FP220 FP238 FP244 FP248 FP249 FP256FP262 FP269 FP272 FP281 FP286 FP287 FP289 FP290 FP295 FP296
Dec 2, 2025A00104$122.7KCONTRACT FOR CONSTRUCTION OF ZONE 1 F-35 FLIGHT LINE FACILITIES, TYNDALL AIR FORCE BASE, FLORIDA MODIFICATION NO. A00104 VARIOUS CHANGESFP105-2 FP168 FP176 FP230 FP275 FP277FP282 FP283 FP284 FP285 FP291
Oct 17, 2025A00103$427.5KMISC CHANGES
Sep 30, 2025P00030$14.7MTHE PURPOSE OF THIS MODIFICATION IS A MULTI-CHANGE MOD #3 FOR ZONE 1.
Sep 18, 2025A00102$474.9KHQ-RFI RESP, COMM CHANGES, AGE ELEVATION
Sep 12, 2025A00101$292.3KFP245, FP246, FP210
Sep 8, 2025A00100$448.2KFP241 AGE AND FP252 WLT
Sep 2, 2025A00099$488.6KFP185-FP209-FP242-FP243-FP251
Aug 26, 2025P00029$1.9MTHE PURPOSE OF THIS MODIFICATION IS A MULTI-CHANGE MODIFICATION #2.
Aug 12, 2025P00028$2.1MTHE PURPOSE OF THIS MODIFICATION IS TO EXECUTE A MULTIPLE CONSTRUCTION CHANGES.
Jul 24, 2025A00098$90.5KFP196, 197, 201, 212, 218
Jul 10, 2025A00097$19.2KLRS - HSS CONFLICT/LOADING DOCK WALL
Jul 2, 2025A00096$308.7KFP121-2 TITLE: WLT - UNFORESEEN UST
Jun 11, 2025A00095$365.4KMISC CHANGES WLT & MXS
Jun 5, 2025A00094$266.2KFP155,158,159,175,195,199,205,207
May 30, 2025A00093$-346CHANGE: FP194 TITLE: B503 - DELETE SCOPE TO DEMO SIDEWALKS
May 28, 2025A00092$42.6KFP177, FP178, FP179
May 27, 2025A00091$143.5KA00091
May 23, 2025A00089$320.8KFP107 TITLE: APRON - INNERDUCT ADDITION
May 23, 2025A00090$153.2KFP112 TITLE: Z1/Z4 DRIVEWAY RESCOPE
May 20, 2025A00088$493.8KFP063 / FP133 / FP153 / FP172 / FP173
May 19, 2025A00087$432.1KFP129 EXTENDED SANITARY BYPASS DURATION FP167 HGRS 1-3 CRAC UNIT CONDENSERS
May 8, 2025A00086$86.1KFP140 TITLE: HGRS 1-3 - LOBBY VAV BOX CHANGES FP143 TITLE: HGRS 1-3 WELD WASHERS HANGAR BAY FP151 TITLE: HGR 1, 2, 3, & SIM - INTERIOR WALL JOIST FP170 TITLE: HGRS 1-3 ROOM 204A ACCESS PANELS
Apr 24, 2025A00085$24.8KFP154 TITLE: SIM - JOIST LOADING OVERSTRESS
Apr 22, 2025P00027$753.5KWEST POND FP163 SIM RFD REVISIONS AT TYNDALL AIR FORCE BASE, FL
Apr 7, 2025A00084$128.0KMXS- MULTI CHANGE
Mar 26, 2025A00083$56.6KFP150 HGRS 1, 2, 3 - FIRE WATER LINE AND PILES
Mar 20, 2025A00082$104.6KHGRS 1-3 ROOF SUPPORT & PANEL BOARDS
Feb 27, 2025A00081$13.4KFP147 MXS - FASCIA PLATE BEAM HEIGHT
Feb 20, 2025A00080$175.0KFP136-1 MXS - TIA FOR RFI CHANGES NTP W/NTE
Feb 11, 2025A00079$51.3KMXS - MULTI CHANGE REQUEST
Feb 3, 2025A00078$486.8KHQ - MULTI CHANGE REQUEST
Jan 24, 2025A00077$112.6KSIM SPRINKLER DESIGN/FILLED FUEL TANK
Jan 13, 2025A00076$0FP110 ALL - REVISED INTERIOR PAINT COLORS
Jan 6, 2025A00075$47.5KFUNDING CORRECTION
Jan 2, 2025A00073$0FP152 WEATHER DELAY SEPT 2024
Dec 20, 2024P00026$3.2MWEST POND EXERCISE BID OPTIONS 5, 6, 9, 10, 15, 16, 21, & 22.
Dec 13, 2024P00025$290.0KEXERCISE BID OPTIONS 17 & 18 ZONE 1 F-35 FLIGHTLINE FACILITIES.
Nov 18, 2024P00024$1.9MEXERCISE BID OPTIONS 3, 4, 11, 12, 19, & 20 ZONE 1 F-35 FLIGHTLINE FACILITIES.
Nov 6, 2024A00074$-50.0KFP111 SIM, HQ, HGRS 1-3 - DELETE KIOSK
Oct 21, 2024A00072$179.6KFP117 HQ EXPOSED VENT ROOM 231 FP118 FC IHWS MODULATING VALVE FP119 MXS DOOR FRAME 189B FP120 WLT ADDITIONAL STORM DRAIN MH FP122 HGRS 1-3 TRANSLUCENT PANEL AND STEEL FP124 HGRS 1-3 GUY WIRE DISCREPANCIES FP130 HGRS 1-3 TP01 AND TP02
Oct 9, 2024A00071$33.9KFP116 ADDITIONAL STEEL CHANGES FROM RFI'S
Sep 26, 2024A00070$190.2KFP100 ALL - ESS/IDS JUNCTION BOXES
Sep 23, 2024A00069$0FP102 SIM - KEYED PORTS TO NON-KEYED PORTS
Sep 17, 2024A00068$35.0KFP106-2 SIM - UNFORESEEN FILLED FUEL TANK
Sep 16, 2024A00067$110.0KFP108 LRS - LOADING DOCK CHEMICAL BARRIER FP123 APRON TRENCH DRAINS
Sep 12, 2024A00066$0FP126 WEATHER DELAY DEC 2023
Aug 14, 2024A00065$299.4KFP099 FRCS POINTS & GRAPHICS FP109 WEST POND - MONITORING WELLS ABANDONMENT FP114 AGE - TRAP PRIMERS AT CANOPIES
Jul 23, 2024P00023$2.5MWEST POND EXERCISE BID OPTIONS 1, 2, 7, 8, 13, AND 14.
Jul 17, 2024A00064$35.0KFP121-1 WLT - UNFORESEEN UST NTP W/NTE
Jul 16, 2024A00063$43.0KFP115 MXS - CMU WALL OPEN VOID
Jul 11, 2024A00062$270.0KFP092 HGR1/2/3 & SIM FRCS POINTS & GRAPHICS
Jun 27, 2024P00022$0WEST POND THIS ADMIN MODIFICATION IS TO GET SPS TO MATCH WHAT WAS COMPLETED IN CEFMS.
Jun 24, 2024P00021$0WEST POND ADMINISTRATIVE MODIFICATION TO CORRECT EXISTING FUNDING.
Jun 7, 2024A00061$231.0KFP093 HGRS 1, 2, 3 - STC-RATED FLOOR ASSEMBLY
May 29, 2024A00060$211.8KFP088 HQ - ROOM 102 ELECTRICAL RELOCATION
May 13, 2024A00059$35.0KFP1206-1 SIM UNFORESEEN FILLED FUEL TANK
May 2, 2024A00058$8.8KFP091 AIR BARRIER CHANGES PART 2 FP101 RE-PROGRAMMING CONTROLLED RECEPTACLES FP103 MXS 4" CMU WALL CJ AND REINFORCING
Apr 16, 2024A00057$16.4KFP098 FC - MANHOLE AT MECHANICAL YARD
Apr 10, 2024A00056$10.7KFP097 HQ, AGE, CCF, FC COORD STUDY PANELBOARDS
Apr 4, 2024A00055$8.3KFP094 WLT - UNFORESEEN UG STORAGE TANK
Apr 2, 2024A00054$49.1KFP090 AGE - CONCRETE BOND BEAMS & VENEER FP096 FC/CCF - CABLE TRAY RE-ROUTE
Mar 28, 2024P00020$29.7MWEST POND FP028-2 PART 2 OF SW POND COMPLETION.
Mar 20, 2024A00053$4.4KFP086 MXS - EXPOSED STEM WALL FP087 HQ - FIRE RISER REROUTE CONNECTION
Mar 4, 2024A00052$132.1KFP074 SIM, HQ, AGE FW SCOPE REVISIONS FP084 HGR1-CU103 DRAINAGE REVISION
Feb 27, 2024A00051$38.2KFP085 HGRS 2/3 DCW FOR WH-1 ROOM 163 FP089 HGRS 1-3 & SIM CX CHANGES
Feb 13, 2024A00050$6.2KFP061 BOX CULVERT RCP CONNECTION STA 3+50 FP078 FC -SHIFT POND OUTFALL ALONG FLORIDA AVE
Feb 12, 2024A00049$234.5KFP076 WLT DEMO AND DISPOSE OF LOUD VOICE POLE FP082 FC - PILES ENCOUNTERED UNFORESEEN DEBRIS
Feb 9, 2024P00019$1.0MCONSTRUCTION OF OPS/AMU/HANGER 1 EXCAVATING AND REMOVAL OF ALL UNDERGROUND OBSTRUCTIONS ENCOUNTERED WITHIN FP015-4 DEEP CONCRETE BASES.
Feb 2, 2024A00048$94.7KFP070 ALL - LIGHTNING PROTECTION DETAILS FP071 HQ - SANITARY REVISIONS FP079 HGR-1 HVAC OPENING ADDITIONAL SUPPORTS FP080 HQ REVISED PHOTOMETRICS FP081 AGE - 8" SAN SEWER INV SS-MH02/SS-MH03 FP083 AGE - FIRE RISER REROUTE CONNECTION
Jan 22, 2024A00047$14.1KFP056 RCP B503 SG CONFLICT FP064 MXS, AGE, & CCF PATHWAY LIGHTING
Jan 10, 2024P00018$367.5KCONSTRUCTION OF OPS/AMU/HANGER 1 FR062 TERMITICIDE PRODUCT CHANGE MODIFICATION.
Dec 29, 2023A00046$-131.1KFP024-2 HGR-3 UST
Dec 13, 2023A00045$66.7KFP066 SIM - SDMH03 EXISTING CONNECTION FP075 CCF UNDERGROUND STORAGE TANK
Dec 7, 2023A00044$109.5KFP067 SIM, CCF, FC, WLT TRANSFORMER RELOCATION
Dec 1, 2023A00043$0FP072 HGR1-HOLLOW METAL DOOR CHANGE FP077 HGR 2 AND 3 DOOR/FRAME REVISIONS
Nov 30, 2023A00042$145.8KFP045 SIM -INSTALL RETAINING WALL GUARDRAIL
Nov 15, 2023A00041$11.9KFP054-2 SIM - UNFORESEEN UNDERGROUND (UG) STORAGE TANK
Nov 14, 2023P00016$0CONSTRUCTION OF OPS/AMU/HANGER 1 ADD DFARS CLAUSE 252.226-7001 TO THE CONTRACT.
Nov 7, 2023A00039$122.6KFP049 ADDITIONAL STEEL CHANGES FROM RFI'S
Nov 7, 2023A00040$-2.8KFP048 SIM -DELETE DOWNSPOUT AND DOWNSPOUT BOOT
Oct 24, 2023A00038$88.6KFP060 FC - METAL PANEL SYSTEM CHANGES FP068 CCF - ADDED DECK SUPPORT STEEL FP073 AGE - CHILLER ELEC & MECH DISCREPANCY
Oct 19, 2023A00037$61.2KFP059 HGRS 2 & 3 ADDTIONAL FLOOR OUTLET BOXES FP069 SIM - ACCESS FLOOR FOUNDATION DRAINS
Oct 12, 2023A00036$43.1KFP055 MXS - STEM WALL CHANGES FP057 HGR-1 MISSING FLOOR OUTLET BOXES FP065 CCF - STEM WALL CHANGES
Sep 29, 2023P00015$41.5MCONSTRUCTION OF ZONE 1 F35 FACILITIES AT TYNDALL AFB - FP028-1 STORMWATER POND & CONVEYANCE.
Sep 21, 2023A00035$32.9KFP033 GUTTERS & HGR STORAGE CANOPY COLUMNS
Sep 11, 2023A00034$50.3KFP051 MXS PILE 61 OBSTRUCTION
Aug 31, 2023A00033$48.0KFP041 UG DUCTBANK CHANGES FOR SUNSHADES
Aug 28, 2023A00032$0FP039 DEMO STEEL HIGH MAST POLE BASE
Aug 24, 2023A00031$3.6KFP053 AGE - ELECTRICAL FLOOR BOXES
Aug 22, 2023A00030$43.7KFP027-2 HGR-3 UNFORESEEN UG MATERIALS FP043 HQ UNFORESEEN CONCRETE FOUNDATION FP052 FC UNFORESEEN UG MATERIALS
Aug 16, 2023A00029$75.0KFP047 HGRS1-3 LINTEL AND JAMB /HGR1 BOND BEAM
Aug 10, 2023A00028$210.9KFP035 DRAFT CURTAIN DETAIL CHANGES WLT & CCF FP042 ADDITIONAL APRON GROUNDING & TIE-DOWNS
Aug 7, 2023A00027$25.0KFP054-1 SIM - UNFORESEEN UG STORAGE TANK
Jul 28, 2023A00026$161.8KFP022 FRCS CHANGES
Jul 26, 2023A00025$15.9KFP050 HGR-1 UNFORESEEN UG MATERIALS
Jul 25, 2023A00024$9.3KBOX CULVERT STATION STUB OUT REMOVAL
Jul 17, 2023A00023$3.3KFP029-2 SIM -DEMO UNFORESEEN CONC FOUNDATION
Jul 5, 2023A00022$70.1KFP030 AIR BARRIER CHANGES FP032 ELEC. PIT & SLAB ELEV. CHANGES FP034 STEEL CHANGES FROM RFI RESPONSES
Jun 22, 2023A00021$107.7KFP046 HGR-3 SANITARY SEWER FORCE MAIN
Jun 21, 2023P00014$0CONSTRUCTION OF OPS/AMU/HANGER 1 ADDING THE TIKTOK CLAUSE TO THE CONTRACT.
Jun 15, 2023A00020$81.6KFP038 SIM SURCHARGE SHIFT
Jun 9, 2023P00013$400.0KCONSTRUCTION OF OPS/AMU/HANGER 1 FP015-3 UST CONCRETE BASES REMOVAL
Jun 5, 2023A00019$-73.5KFP023-2 HGR-3 ACM ABATEMENT
Jun 1, 2023A00018$30.2KFP025 SHORT CIRCUIT/COORDINATION STUDY
May 30, 2023A00017$53.8KFP037 APRON BOX CULVERT RELOCATION
May 9, 2023A00016$62.7KFP017 AGE, HGR2, MXS UNFORESEEN UG MATERIALS FP026 HGR-3 DEMO UNFORESEEN GEOTHERMAL SYSTEM
May 5, 2023P00012$-3.5MCONSTRUCTION OF OPS/AMU/HANGER 1 FP003-2 DELETE HEF FIRE SUPPRESSION.
Apr 25, 2023A00015$62.6KFP007 ADDITIONAL WELL ABANDONMENT FP008-2 HGR-2 ACM ABATEMENT FP019-2 AGE & CCF - UNFORESEEN CONC MATERIALS FP031 ADDITIONAL OBSTRUCTED TELECOMM CONDUITS
Apr 25, 2023P00011$4.6MCONSTRUCTION OF OPS/AMU/HANGER 1 ADDING ADDITIONAL FUNDS AND CALENDAR DAYS FOR HANGAR 1 PHASED SURCHARGE.
Apr 12, 2023P00010$730.7KCONSTRUCTION OF OPS/AMU/HANGER 1 DEFINITIZATION OF TWO UNPRICED CHANGE ORDERS AND A 21 DAY CALENDAR EXTENSION.
Mar 29, 2023P00008$150.0KMODIFICATION FOR CONSTRUCTION OF SUPPORTING SITE WORK & UTILITIES FOR OPS/AMU/HANGAR 3 FACILITY
Mar 29, 2023P00009$200.0KMODIFICATION FP024-1, HGR-3 TESTING & DISPOSAL OF UNDERGROUND TANK
Mar 21, 2023A00014$20.0KFP029-1 SIM -DEMO UNFORESEEN CONCRETE FOUNDATION
Mar 17, 2023A00013$25.0KFP027-1 HGR-3 UNFORESEEN UG MATERIALS
Mar 17, 2023P00007$450.0KCONSTRUCTION OF OPS/AMU/HANGER 1 ADDING FUNDS FOR FP015-2 DEEP CONCRETE BASES TYNDALL AFB, FL
Mar 13, 2023P00006$478.6KCONSTRUCTION OF OPS/AMU/HANGER 1 - ADDING FUNDS AND TIME FOR ACM TESTING AND ABATEMENT OF HANGER 1 TYNDALL AFB, FLORIDA.
Mar 7, 2023P00005$-137.9KCONSTRUCTION OF OPS/AMU/HANGER 1 REPLACE FOAM FIRE SUPPRESSION DESIGN
Feb 23, 2023A00011$101.1KFP006-2 OBSTRUCTED COMMS PATHWAYS FP012 BOX CULVERT SHIFT FP016 HGR-2 EXIST COMM DUCTBANK FOR SURCHARGE FP018 MXS - UNFORESEEN UNSUITABLE SOILS
Feb 23, 2023A00012$225.4KFP011 GROUNDING AT EACH TIE-DOWN POINTS
Feb 23, 2023P00004$120.0KCONSTRUCTION OF OPS/AMU/HANGER 1 ADDING FUNDS TO TEST AND DISPOSE OF UG TANK AND ADMIN MOD TO CORRECT PREVIOUS FUNDING.
Feb 15, 2023A00010$108.4KFP010 TEMP TELECOM REROUTING CHANGES
Feb 9, 2023A00009$20.0KFP019-1 AGE & CCF - UNFORESEEN CONC MATERIALS
Feb 9, 2023P00003$100.0KCONSTRUCTION OF OPS/AMU/HANGER 1 FOR DIFFERING SITE CONDITIONS - DEEP CONCRETE BASES.
Jan 30, 2023A00008$3.9KFP013 USP WEAPONS LOAD TRAINING (WLT) INDIRECT WATER HEATER
Jan 26, 2023A00007$100.0KFP008-1 ACM ABATEMENT HGR-2
Jan 11, 2023A00006$60.0KFP009-1 HGR-2 TESTING & DISPOSAL OF UG TANK.
Jan 6, 2023A00005$345.0KFP005-1 ADDITIONAL SANITARY INTERCEPT AT B503
Nov 22, 2022A00003$40.0KFP004-2 ACM TESTING & ABATEMENT (HGR-1)
Nov 22, 2022A00004$8.8KFP002 B503 UTILITY ABANDONMENT & DE-SCOPE
Nov 3, 2022A00002$20.0KMOD A00002 FP006-L OBSTRUCTED COMMS
Sep 30, 2022A00001$20.0KMOD A00001 FP004-1 POTENTIAL ACM PIPE
Jun 15, 2022P00002$0CONSTRUCTION OF OPS/AMU/HANGER 1
Jun 7, 2022P00001$0CONSTRUCTION OF ZONE 1 TYNDALL AFB NOTICE TO PROCEED
May 10, 20220$531.7MZONE 1 TYNDALL AFB, FL

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.