Federal contract award
W9127822C0008
ZONE 1 TYNDALL AFB, FL
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W074 ENDIST MOBILE |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Y1JZ — CONSTRUCTION OF MISCELLANEOUS BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $664.6M |
| Current contract value | $664.6M |
| Potential contract value / ceiling | $670.8M |
| Start date | May 20, 2022 |
| Current end date | Jul 26, 2026 |
| Potential end date | Jul 26, 2026 |
| Latest award activity | Jun 4, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 145 of 145 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 4, 2026 | A00114 | $183.9K | CONTRACT FOR CONSTRUCTION OF ZONE 1 F-35 FLIGHT LINE FACILITIES, TYNDALL AIR FORCE BASE, FLORIDA REFERENCE NO. A00114FP331, FP337, FP338 AND FP342 |
| May 12, 2026 | A00113 | $-120.0K | CONTRACT FOR CONSTRUCTION OF ZONE 1 F-35 FLIGHT LINE FACILITIES, TYNDALL AIR FORCE BASE, FLORIDA REFERENCE NO. A00113FP333 APRON - PAVING LOT AND EDGE SLUMP |
| Apr 23, 2026 | A00112 | $343.3K | CONTRACT FOR CONSTRUCTION OF ZONE 1 F-35 FLIGHT LINE FACILITIES, TYNDALL AIR FORCE BASE, FLORIDA REFERENCE NO. A00111FP316, FP318, FP324 AND FP328 |
| Mar 24, 2026 | A00111 | $108.9K | CONTRACT FOR CONSTRUCTION OF ZONE 1 F-35 FLIGHT LINE FACILITIES, TYNDALL AIR FORCE BASE, FLORIDA REFERENCE NO. A00111FP316, FP318, FP324 AND FP328 |
| Mar 2, 2026 | A00110 | $371.6K | CONTRACT FOR CONSTRUCTION OF ZONE 1 F-35 FLIGHT LINE FACILITIES, TYNDALL AIR FORCE BASE, FLORIDA REFERENCE NO. A00110FP308, FP311, FP313, FP314 AND FP315 |
| Feb 24, 2026 | A00109 | $438.0K | CONTRACT FOR CONSTRUCTION OF ZONE 1 F-35 FLIGHT LINE FACILITIES, TYNDALL AIR FORCE BASE, FLORIDA REFERENCE NO. A00109CHANGES FP293, FP300, FP304, FP305, FP309, FP310 AND FP312 |
| Feb 11, 2026 | A00108 | $75.0K | CONTRACT FOR CONSTRUCTION OF ZONE 1 F-35 FLIGHT LINE FACILITIES, TYNDALL AIR FORCE BASE, FLORIDA REFERENCE NO. A00107FP273, FP297, FP299, FP301, FP302, FP303 AND FP307 |
| Feb 6, 2026 | A00107 | $440.1K | CONTRACT FOR CONSTRUCTION OF ZONE 1 F-35 FLIGHT LINE FACILITIES, TYNDALL AIR FORCE BASE, FLORIDA REFERENCE NO. A00107FP273, FP297, FP299, FP301, FP302, FP303 AND FP307 |
| Feb 3, 2026 | A00106 | $89.7K | CONTRACT FOR CONSTRUCTION OF ZONE 1 F-35 FLIGHT LINE FACILITIES, TYNDALL AIR FORCE BASE, FLORIDA REFERENCE NO. A00106FP292 LRS - STORM DRAIN CLASH WITH WATER LINEFP306 HGR 1 - EAST PARKING DRIVEWAY |
| Jan 5, 2026 | A00105 | $0 | CONTRACT FOR CONSTRUCTION OF ZONE 1 F-35 FLIGHT LINE FACILITIES, TYNDALL AIR FORCE BASE, FLORIDA FP265 WEATHER DELAY JULY 2025 |
| Dec 23, 2025 | P00031 | $3.6M | CONTRACT FOR CONSTRUCTION OF ZONE 1 F-35 FLIGHT LINE FACILITIES, TYNDALL AIR FORCE BASE, FLORIDA P00031 MULTI CHANGE #3FP183 FP204 FP214 FP217 FP220 FP238 FP244 FP248 FP249 FP256FP262 FP269 FP272 FP281 FP286 FP287 FP289 FP290 FP295 FP296 |
| Dec 2, 2025 | A00104 | $122.7K | CONTRACT FOR CONSTRUCTION OF ZONE 1 F-35 FLIGHT LINE FACILITIES, TYNDALL AIR FORCE BASE, FLORIDA MODIFICATION NO. A00104 VARIOUS CHANGESFP105-2 FP168 FP176 FP230 FP275 FP277FP282 FP283 FP284 FP285 FP291 |
| Oct 17, 2025 | A00103 | $427.5K | MISC CHANGES |
| Sep 30, 2025 | P00030 | $14.7M | THE PURPOSE OF THIS MODIFICATION IS A MULTI-CHANGE MOD #3 FOR ZONE 1. |
| Sep 18, 2025 | A00102 | $474.9K | HQ-RFI RESP, COMM CHANGES, AGE ELEVATION |
| Sep 12, 2025 | A00101 | $292.3K | FP245, FP246, FP210 |
| Sep 8, 2025 | A00100 | $448.2K | FP241 AGE AND FP252 WLT |
| Sep 2, 2025 | A00099 | $488.6K | FP185-FP209-FP242-FP243-FP251 |
| Aug 26, 2025 | P00029 | $1.9M | THE PURPOSE OF THIS MODIFICATION IS A MULTI-CHANGE MODIFICATION #2. |
| Aug 12, 2025 | P00028 | $2.1M | THE PURPOSE OF THIS MODIFICATION IS TO EXECUTE A MULTIPLE CONSTRUCTION CHANGES. |
| Jul 24, 2025 | A00098 | $90.5K | FP196, 197, 201, 212, 218 |
| Jul 10, 2025 | A00097 | $19.2K | LRS - HSS CONFLICT/LOADING DOCK WALL |
| Jul 2, 2025 | A00096 | $308.7K | FP121-2 TITLE: WLT - UNFORESEEN UST |
| Jun 11, 2025 | A00095 | $365.4K | MISC CHANGES WLT & MXS |
| Jun 5, 2025 | A00094 | $266.2K | FP155,158,159,175,195,199,205,207 |
| May 30, 2025 | A00093 | $-346 | CHANGE: FP194 TITLE: B503 - DELETE SCOPE TO DEMO SIDEWALKS |
| May 28, 2025 | A00092 | $42.6K | FP177, FP178, FP179 |
| May 27, 2025 | A00091 | $143.5K | A00091 |
| May 23, 2025 | A00089 | $320.8K | FP107 TITLE: APRON - INNERDUCT ADDITION |
| May 23, 2025 | A00090 | $153.2K | FP112 TITLE: Z1/Z4 DRIVEWAY RESCOPE |
| May 20, 2025 | A00088 | $493.8K | FP063 / FP133 / FP153 / FP172 / FP173 |
| May 19, 2025 | A00087 | $432.1K | FP129 EXTENDED SANITARY BYPASS DURATION FP167 HGRS 1-3 CRAC UNIT CONDENSERS |
| May 8, 2025 | A00086 | $86.1K | FP140 TITLE: HGRS 1-3 - LOBBY VAV BOX CHANGES FP143 TITLE: HGRS 1-3 WELD WASHERS HANGAR BAY FP151 TITLE: HGR 1, 2, 3, & SIM - INTERIOR WALL JOIST FP170 TITLE: HGRS 1-3 ROOM 204A ACCESS PANELS |
| Apr 24, 2025 | A00085 | $24.8K | FP154 TITLE: SIM - JOIST LOADING OVERSTRESS |
| Apr 22, 2025 | P00027 | $753.5K | WEST POND FP163 SIM RFD REVISIONS AT TYNDALL AIR FORCE BASE, FL |
| Apr 7, 2025 | A00084 | $128.0K | MXS- MULTI CHANGE |
| Mar 26, 2025 | A00083 | $56.6K | FP150 HGRS 1, 2, 3 - FIRE WATER LINE AND PILES |
| Mar 20, 2025 | A00082 | $104.6K | HGRS 1-3 ROOF SUPPORT & PANEL BOARDS |
| Feb 27, 2025 | A00081 | $13.4K | FP147 MXS - FASCIA PLATE BEAM HEIGHT |
| Feb 20, 2025 | A00080 | $175.0K | FP136-1 MXS - TIA FOR RFI CHANGES NTP W/NTE |
| Feb 11, 2025 | A00079 | $51.3K | MXS - MULTI CHANGE REQUEST |
| Feb 3, 2025 | A00078 | $486.8K | HQ - MULTI CHANGE REQUEST |
| Jan 24, 2025 | A00077 | $112.6K | SIM SPRINKLER DESIGN/FILLED FUEL TANK |
| Jan 13, 2025 | A00076 | $0 | FP110 ALL - REVISED INTERIOR PAINT COLORS |
| Jan 6, 2025 | A00075 | $47.5K | FUNDING CORRECTION |
| Jan 2, 2025 | A00073 | $0 | FP152 WEATHER DELAY SEPT 2024 |
| Dec 20, 2024 | P00026 | $3.2M | WEST POND EXERCISE BID OPTIONS 5, 6, 9, 10, 15, 16, 21, & 22. |
| Dec 13, 2024 | P00025 | $290.0K | EXERCISE BID OPTIONS 17 & 18 ZONE 1 F-35 FLIGHTLINE FACILITIES. |
| Nov 18, 2024 | P00024 | $1.9M | EXERCISE BID OPTIONS 3, 4, 11, 12, 19, & 20 ZONE 1 F-35 FLIGHTLINE FACILITIES. |
| Nov 6, 2024 | A00074 | $-50.0K | FP111 SIM, HQ, HGRS 1-3 - DELETE KIOSK |
| Oct 21, 2024 | A00072 | $179.6K | FP117 HQ EXPOSED VENT ROOM 231 FP118 FC IHWS MODULATING VALVE FP119 MXS DOOR FRAME 189B FP120 WLT ADDITIONAL STORM DRAIN MH FP122 HGRS 1-3 TRANSLUCENT PANEL AND STEEL FP124 HGRS 1-3 GUY WIRE DISCREPANCIES FP130 HGRS 1-3 TP01 AND TP02 |
| Oct 9, 2024 | A00071 | $33.9K | FP116 ADDITIONAL STEEL CHANGES FROM RFI'S |
| Sep 26, 2024 | A00070 | $190.2K | FP100 ALL - ESS/IDS JUNCTION BOXES |
| Sep 23, 2024 | A00069 | $0 | FP102 SIM - KEYED PORTS TO NON-KEYED PORTS |
| Sep 17, 2024 | A00068 | $35.0K | FP106-2 SIM - UNFORESEEN FILLED FUEL TANK |
| Sep 16, 2024 | A00067 | $110.0K | FP108 LRS - LOADING DOCK CHEMICAL BARRIER FP123 APRON TRENCH DRAINS |
| Sep 12, 2024 | A00066 | $0 | FP126 WEATHER DELAY DEC 2023 |
| Aug 14, 2024 | A00065 | $299.4K | FP099 FRCS POINTS & GRAPHICS FP109 WEST POND - MONITORING WELLS ABANDONMENT FP114 AGE - TRAP PRIMERS AT CANOPIES |
| Jul 23, 2024 | P00023 | $2.5M | WEST POND EXERCISE BID OPTIONS 1, 2, 7, 8, 13, AND 14. |
| Jul 17, 2024 | A00064 | $35.0K | FP121-1 WLT - UNFORESEEN UST NTP W/NTE |
| Jul 16, 2024 | A00063 | $43.0K | FP115 MXS - CMU WALL OPEN VOID |
| Jul 11, 2024 | A00062 | $270.0K | FP092 HGR1/2/3 & SIM FRCS POINTS & GRAPHICS |
| Jun 27, 2024 | P00022 | $0 | WEST POND THIS ADMIN MODIFICATION IS TO GET SPS TO MATCH WHAT WAS COMPLETED IN CEFMS. |
| Jun 24, 2024 | P00021 | $0 | WEST POND ADMINISTRATIVE MODIFICATION TO CORRECT EXISTING FUNDING. |
| Jun 7, 2024 | A00061 | $231.0K | FP093 HGRS 1, 2, 3 - STC-RATED FLOOR ASSEMBLY |
| May 29, 2024 | A00060 | $211.8K | FP088 HQ - ROOM 102 ELECTRICAL RELOCATION |
| May 13, 2024 | A00059 | $35.0K | FP1206-1 SIM UNFORESEEN FILLED FUEL TANK |
| May 2, 2024 | A00058 | $8.8K | FP091 AIR BARRIER CHANGES PART 2 FP101 RE-PROGRAMMING CONTROLLED RECEPTACLES FP103 MXS 4" CMU WALL CJ AND REINFORCING |
| Apr 16, 2024 | A00057 | $16.4K | FP098 FC - MANHOLE AT MECHANICAL YARD |
| Apr 10, 2024 | A00056 | $10.7K | FP097 HQ, AGE, CCF, FC COORD STUDY PANELBOARDS |
| Apr 4, 2024 | A00055 | $8.3K | FP094 WLT - UNFORESEEN UG STORAGE TANK |
| Apr 2, 2024 | A00054 | $49.1K | FP090 AGE - CONCRETE BOND BEAMS & VENEER FP096 FC/CCF - CABLE TRAY RE-ROUTE |
| Mar 28, 2024 | P00020 | $29.7M | WEST POND FP028-2 PART 2 OF SW POND COMPLETION. |
| Mar 20, 2024 | A00053 | $4.4K | FP086 MXS - EXPOSED STEM WALL FP087 HQ - FIRE RISER REROUTE CONNECTION |
| Mar 4, 2024 | A00052 | $132.1K | FP074 SIM, HQ, AGE FW SCOPE REVISIONS FP084 HGR1-CU103 DRAINAGE REVISION |
| Feb 27, 2024 | A00051 | $38.2K | FP085 HGRS 2/3 DCW FOR WH-1 ROOM 163 FP089 HGRS 1-3 & SIM CX CHANGES |
| Feb 13, 2024 | A00050 | $6.2K | FP061 BOX CULVERT RCP CONNECTION STA 3+50 FP078 FC -SHIFT POND OUTFALL ALONG FLORIDA AVE |
| Feb 12, 2024 | A00049 | $234.5K | FP076 WLT DEMO AND DISPOSE OF LOUD VOICE POLE FP082 FC - PILES ENCOUNTERED UNFORESEEN DEBRIS |
| Feb 9, 2024 | P00019 | $1.0M | CONSTRUCTION OF OPS/AMU/HANGER 1 EXCAVATING AND REMOVAL OF ALL UNDERGROUND OBSTRUCTIONS ENCOUNTERED WITHIN FP015-4 DEEP CONCRETE BASES. |
| Feb 2, 2024 | A00048 | $94.7K | FP070 ALL - LIGHTNING PROTECTION DETAILS FP071 HQ - SANITARY REVISIONS FP079 HGR-1 HVAC OPENING ADDITIONAL SUPPORTS FP080 HQ REVISED PHOTOMETRICS FP081 AGE - 8" SAN SEWER INV SS-MH02/SS-MH03 FP083 AGE - FIRE RISER REROUTE CONNECTION |
| Jan 22, 2024 | A00047 | $14.1K | FP056 RCP B503 SG CONFLICT FP064 MXS, AGE, & CCF PATHWAY LIGHTING |
| Jan 10, 2024 | P00018 | $367.5K | CONSTRUCTION OF OPS/AMU/HANGER 1 FR062 TERMITICIDE PRODUCT CHANGE MODIFICATION. |
| Dec 29, 2023 | A00046 | $-131.1K | FP024-2 HGR-3 UST |
| Dec 13, 2023 | A00045 | $66.7K | FP066 SIM - SDMH03 EXISTING CONNECTION FP075 CCF UNDERGROUND STORAGE TANK |
| Dec 7, 2023 | A00044 | $109.5K | FP067 SIM, CCF, FC, WLT TRANSFORMER RELOCATION |
| Dec 1, 2023 | A00043 | $0 | FP072 HGR1-HOLLOW METAL DOOR CHANGE FP077 HGR 2 AND 3 DOOR/FRAME REVISIONS |
| Nov 30, 2023 | A00042 | $145.8K | FP045 SIM -INSTALL RETAINING WALL GUARDRAIL |
| Nov 15, 2023 | A00041 | $11.9K | FP054-2 SIM - UNFORESEEN UNDERGROUND (UG) STORAGE TANK |
| Nov 14, 2023 | P00016 | $0 | CONSTRUCTION OF OPS/AMU/HANGER 1 ADD DFARS CLAUSE 252.226-7001 TO THE CONTRACT. |
| Nov 7, 2023 | A00039 | $122.6K | FP049 ADDITIONAL STEEL CHANGES FROM RFI'S |
| Nov 7, 2023 | A00040 | $-2.8K | FP048 SIM -DELETE DOWNSPOUT AND DOWNSPOUT BOOT |
| Oct 24, 2023 | A00038 | $88.6K | FP060 FC - METAL PANEL SYSTEM CHANGES FP068 CCF - ADDED DECK SUPPORT STEEL FP073 AGE - CHILLER ELEC & MECH DISCREPANCY |
| Oct 19, 2023 | A00037 | $61.2K | FP059 HGRS 2 & 3 ADDTIONAL FLOOR OUTLET BOXES FP069 SIM - ACCESS FLOOR FOUNDATION DRAINS |
| Oct 12, 2023 | A00036 | $43.1K | FP055 MXS - STEM WALL CHANGES FP057 HGR-1 MISSING FLOOR OUTLET BOXES FP065 CCF - STEM WALL CHANGES |
| Sep 29, 2023 | P00015 | $41.5M | CONSTRUCTION OF ZONE 1 F35 FACILITIES AT TYNDALL AFB - FP028-1 STORMWATER POND & CONVEYANCE. |
| Sep 21, 2023 | A00035 | $32.9K | FP033 GUTTERS & HGR STORAGE CANOPY COLUMNS |
| Sep 11, 2023 | A00034 | $50.3K | FP051 MXS PILE 61 OBSTRUCTION |
| Aug 31, 2023 | A00033 | $48.0K | FP041 UG DUCTBANK CHANGES FOR SUNSHADES |
| Aug 28, 2023 | A00032 | $0 | FP039 DEMO STEEL HIGH MAST POLE BASE |
| Aug 24, 2023 | A00031 | $3.6K | FP053 AGE - ELECTRICAL FLOOR BOXES |
| Aug 22, 2023 | A00030 | $43.7K | FP027-2 HGR-3 UNFORESEEN UG MATERIALS FP043 HQ UNFORESEEN CONCRETE FOUNDATION FP052 FC UNFORESEEN UG MATERIALS |
| Aug 16, 2023 | A00029 | $75.0K | FP047 HGRS1-3 LINTEL AND JAMB /HGR1 BOND BEAM |
| Aug 10, 2023 | A00028 | $210.9K | FP035 DRAFT CURTAIN DETAIL CHANGES WLT & CCF FP042 ADDITIONAL APRON GROUNDING & TIE-DOWNS |
| Aug 7, 2023 | A00027 | $25.0K | FP054-1 SIM - UNFORESEEN UG STORAGE TANK |
| Jul 28, 2023 | A00026 | $161.8K | FP022 FRCS CHANGES |
| Jul 26, 2023 | A00025 | $15.9K | FP050 HGR-1 UNFORESEEN UG MATERIALS |
| Jul 25, 2023 | A00024 | $9.3K | BOX CULVERT STATION STUB OUT REMOVAL |
| Jul 17, 2023 | A00023 | $3.3K | FP029-2 SIM -DEMO UNFORESEEN CONC FOUNDATION |
| Jul 5, 2023 | A00022 | $70.1K | FP030 AIR BARRIER CHANGES FP032 ELEC. PIT & SLAB ELEV. CHANGES FP034 STEEL CHANGES FROM RFI RESPONSES |
| Jun 22, 2023 | A00021 | $107.7K | FP046 HGR-3 SANITARY SEWER FORCE MAIN |
| Jun 21, 2023 | P00014 | $0 | CONSTRUCTION OF OPS/AMU/HANGER 1 ADDING THE TIKTOK CLAUSE TO THE CONTRACT. |
| Jun 15, 2023 | A00020 | $81.6K | FP038 SIM SURCHARGE SHIFT |
| Jun 9, 2023 | P00013 | $400.0K | CONSTRUCTION OF OPS/AMU/HANGER 1 FP015-3 UST CONCRETE BASES REMOVAL |
| Jun 5, 2023 | A00019 | $-73.5K | FP023-2 HGR-3 ACM ABATEMENT |
| Jun 1, 2023 | A00018 | $30.2K | FP025 SHORT CIRCUIT/COORDINATION STUDY |
| May 30, 2023 | A00017 | $53.8K | FP037 APRON BOX CULVERT RELOCATION |
| May 9, 2023 | A00016 | $62.7K | FP017 AGE, HGR2, MXS UNFORESEEN UG MATERIALS FP026 HGR-3 DEMO UNFORESEEN GEOTHERMAL SYSTEM |
| May 5, 2023 | P00012 | $-3.5M | CONSTRUCTION OF OPS/AMU/HANGER 1 FP003-2 DELETE HEF FIRE SUPPRESSION. |
| Apr 25, 2023 | A00015 | $62.6K | FP007 ADDITIONAL WELL ABANDONMENT FP008-2 HGR-2 ACM ABATEMENT FP019-2 AGE & CCF - UNFORESEEN CONC MATERIALS FP031 ADDITIONAL OBSTRUCTED TELECOMM CONDUITS |
| Apr 25, 2023 | P00011 | $4.6M | CONSTRUCTION OF OPS/AMU/HANGER 1 ADDING ADDITIONAL FUNDS AND CALENDAR DAYS FOR HANGAR 1 PHASED SURCHARGE. |
| Apr 12, 2023 | P00010 | $730.7K | CONSTRUCTION OF OPS/AMU/HANGER 1 DEFINITIZATION OF TWO UNPRICED CHANGE ORDERS AND A 21 DAY CALENDAR EXTENSION. |
| Mar 29, 2023 | P00008 | $150.0K | MODIFICATION FOR CONSTRUCTION OF SUPPORTING SITE WORK & UTILITIES FOR OPS/AMU/HANGAR 3 FACILITY |
| Mar 29, 2023 | P00009 | $200.0K | MODIFICATION FP024-1, HGR-3 TESTING & DISPOSAL OF UNDERGROUND TANK |
| Mar 21, 2023 | A00014 | $20.0K | FP029-1 SIM -DEMO UNFORESEEN CONCRETE FOUNDATION |
| Mar 17, 2023 | A00013 | $25.0K | FP027-1 HGR-3 UNFORESEEN UG MATERIALS |
| Mar 17, 2023 | P00007 | $450.0K | CONSTRUCTION OF OPS/AMU/HANGER 1 ADDING FUNDS FOR FP015-2 DEEP CONCRETE BASES TYNDALL AFB, FL |
| Mar 13, 2023 | P00006 | $478.6K | CONSTRUCTION OF OPS/AMU/HANGER 1 - ADDING FUNDS AND TIME FOR ACM TESTING AND ABATEMENT OF HANGER 1 TYNDALL AFB, FLORIDA. |
| Mar 7, 2023 | P00005 | $-137.9K | CONSTRUCTION OF OPS/AMU/HANGER 1 REPLACE FOAM FIRE SUPPRESSION DESIGN |
| Feb 23, 2023 | A00011 | $101.1K | FP006-2 OBSTRUCTED COMMS PATHWAYS FP012 BOX CULVERT SHIFT FP016 HGR-2 EXIST COMM DUCTBANK FOR SURCHARGE FP018 MXS - UNFORESEEN UNSUITABLE SOILS |
| Feb 23, 2023 | A00012 | $225.4K | FP011 GROUNDING AT EACH TIE-DOWN POINTS |
| Feb 23, 2023 | P00004 | $120.0K | CONSTRUCTION OF OPS/AMU/HANGER 1 ADDING FUNDS TO TEST AND DISPOSE OF UG TANK AND ADMIN MOD TO CORRECT PREVIOUS FUNDING. |
| Feb 15, 2023 | A00010 | $108.4K | FP010 TEMP TELECOM REROUTING CHANGES |
| Feb 9, 2023 | A00009 | $20.0K | FP019-1 AGE & CCF - UNFORESEEN CONC MATERIALS |
| Feb 9, 2023 | P00003 | $100.0K | CONSTRUCTION OF OPS/AMU/HANGER 1 FOR DIFFERING SITE CONDITIONS - DEEP CONCRETE BASES. |
| Jan 30, 2023 | A00008 | $3.9K | FP013 USP WEAPONS LOAD TRAINING (WLT) INDIRECT WATER HEATER |
| Jan 26, 2023 | A00007 | $100.0K | FP008-1 ACM ABATEMENT HGR-2 |
| Jan 11, 2023 | A00006 | $60.0K | FP009-1 HGR-2 TESTING & DISPOSAL OF UG TANK. |
| Jan 6, 2023 | A00005 | $345.0K | FP005-1 ADDITIONAL SANITARY INTERCEPT AT B503 |
| Nov 22, 2022 | A00003 | $40.0K | FP004-2 ACM TESTING & ABATEMENT (HGR-1) |
| Nov 22, 2022 | A00004 | $8.8K | FP002 B503 UTILITY ABANDONMENT & DE-SCOPE |
| Nov 3, 2022 | A00002 | $20.0K | MOD A00002 FP006-L OBSTRUCTED COMMS |
| Sep 30, 2022 | A00001 | $20.0K | MOD A00001 FP004-1 POTENTIAL ACM PIPE |
| Jun 15, 2022 | P00002 | $0 | CONSTRUCTION OF OPS/AMU/HANGER 1 |
| Jun 7, 2022 | P00001 | $0 | CONSTRUCTION OF ZONE 1 TYNDALL AFB NOTICE TO PROCEED |
| May 10, 2022 | 0 | $531.7M | ZONE 1 TYNDALL AFB, FL |