Federal contract award
W9127822C0011
CONSTRUCTION OF OSS FACILITY TYNDALL AFB, FL
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W074 ENDIST MOBILE |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Y1JZ — CONSTRUCTION OF MISCELLANEOUS BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $49.4M |
| Current contract value | $49.4M |
| Potential contract value / ceiling | $50.7M |
| Start date | May 26, 2022 |
| Current end date | Jan 28, 2026 |
| Potential end date | Jan 28, 2026 |
| Latest award activity | Apr 30, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 48 of 48 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Apr 30, 2026 | A00035 | $9.0K | CONSTRUCTION OF OSS RADAR AND SPECIAL PURPOSE VEHICLE MAINTENANCE BUILDINGS ALONG THE FLIGHT LINE. FACILITIES TO INCLUDE 3 MAIN FUNCTIONS; BASE OPERATIONS, TRANSIENT ALERT AND RADAR APPROACH CONTROL CENTER (RAPCON). APPROXIMATELY 34,000 SF. |
| Apr 24, 2026 | A00034 | $0 | CONSTRUCTION OF OSS RADAR AND SPECIAL PURPOSE VEHICLE MAINTENANCE BUILDINGS ALONG THE FLIGHT LINE. FACILITIES TO INCLUDE 3 MAIN FUNCTIONS; BASE OPERATIONS, TRANSIENT ALERT AND RADAR APPROACH CONTROL CENTER (RAPCON). APPROXIMATELY 34,000 SF. |
| Oct 28, 2025 | A00033 | $-9.2K | 00035 TITLE: SITE LANDSCAPING CHANGES |
| Sep 29, 2025 | A00032 | $8.3K | 00034 TITLE: TAS & AM ANTENNA INFRASTRUCTURE |
| Aug 27, 2025 | A00031 | $53.9K | TR031 TITLE: RAPCON POWER AND TELECOM DISTRIBUTION |
| Aug 1, 2025 | P00012 | $0 | CONSTRUCTION OF OSS FACILITY FUNDING CORRECTION TO A00022 |
| May 30, 2025 | P00011 | $1.4M | CONSTRUCTION OF OSS FACILITY O0027 EXTENDED OH MACII, RAPCORN AT TYNDALL AIR FORCE BASE, FL. |
| May 9, 2025 | A00030 | $-1.5K | 00019 TECH LAPTOP, SUBMETER, & CONTROL RECEPTA |
| Apr 18, 2025 | A00029 | $57.9K | 00020-4 TITLE: REVISED WATER CONNECTION POINTS |
| Feb 27, 2025 | A00028 | $0 | WEATHER TIME EXTENSION AUG 24 - NOV 24 |
| Jan 24, 2025 | A00027 | $200.9K | 00021 RAPCON & IFR EQUIPMENT INSTALL CHANGE |
| Dec 10, 2024 | A00026 | $-39.0K | 00023 FLORIDA AVE & OSS AF SIGNAGE DESCOPE |
| Nov 21, 2024 | A00025 | $311.1K | 00020-3 REVISED WATER CONNECTION POINTS |
| Oct 3, 2024 | A00024 | $9.9K | 00029 FMF PARKING LOT ACM REMOVAL |
| Sep 27, 2024 | P00010 | $398.7K | CONSTRUCTION OF OSS FACILITY O0010-2 OSS MAC II RATING CONSTRUCTION AT TYNDALL AFB, FL |
| Sep 26, 2024 | A00022 | $122.5K | 00003-4 OSS&FMF FLOOR LAYOUT CHANGES CONST PART3 |
| Sep 26, 2024 | A00023 | $300.6K | 00004-2 ADDITIONAL FMF FLUID LINES CONSTRUCTION |
| Sep 23, 2024 | A00020 | $177.9K | 00001-2 FIBER STRAND & HUMIDITY CONTROL CONSTRUC |
| Sep 23, 2024 | A00021 | $2.5K | 00026 GCEC REPAIR OSS WATER LINE |
| Jul 26, 2024 | A00019 | $50.0K | 00020-2 REVISED WATER CONNECTION POINTS |
| Jul 1, 2024 | A00018 | $6.0K | 00024 FMF NORTH FENCE REMOVAL |
| Jun 19, 2024 | A00017 | $15.1K | 00022 ADDITIONAL DEWATER AT FMF |
| Jun 6, 2024 | A00016 | $146.1K | 00003-3 OSS&FMF FLOOR LAYOUT CHANGES CONST PART2 |
| May 10, 2024 | A00015 | $-33.0K | 00002 FRCS REVISIONS - APPENDIX L |
| May 2, 2024 | P00009 | $102.6K | CONSTRUCTION OF OSS FACILITY O0010-1 OSS MAC II RATING AT TYNDALL AIR FORCE BASE, FLORIDA. |
| Apr 17, 2024 | P00008 | $328.0K | CONSTRUCTION OF OSS FACILITY O0012-3 FMF BLDG PAD DEBRIS REMOVAL - PART 3. |
| Mar 28, 2024 | A00014 | $70.9K | 00013 OSS/FMF CONCRETE DEBRIS REMOVAL |
| Mar 27, 2024 | A00013 | $5.7K | 00018 OSS DOWNED FENCE |
| Mar 7, 2024 | A00012 | $35.0K | 00020-1 REVISED WATER CONNECTION POINTS |
| Feb 27, 2024 | A00011 | $25.3K | 00016 FMF SE PARKING LOT ACM & WATER ABATEMENT |
| Jan 25, 2024 | A00010 | $90.1K | 00011 TELECOMMUNICATION CHANGES |
| Dec 7, 2023 | A00009 | $26.3K | 00007 FMF ROTARY LIFT FOUNDATION |
| Sep 30, 2023 | A00008 | $90.0K | 00003-2 OSS & FMF FLOOR LAYOUT CHANGES CONST PART 1 |
| Sep 12, 2023 | A00007 | $14.4K | 00009 FMF CONCRETE PADS DEMO |
| Sep 11, 2023 | A00006 | $6.4K | 00004-1 ADDITIONAL FMF FLUID LINES DESIGN |
| Aug 11, 2023 | A00005 | $87.8K | 00003-1 OSS & FMF FLOOR LAYOUT CHANGES DESIGN |
| Aug 2, 2023 | P00007 | $85.0K | CONSTRUCTION OF OSS FACILITY ADDING IN A NOT TO EXCEED AMOUNT TO THE CONTRACT FOR TR012-2 FMF BLDG PAD DEBRIS REMOVAL. ALSO CORRECTING CLIN 0005AB FUNDING MISTAKE AT AWARD. |
| Jul 19, 2023 | A00003 | $12.9K | 00001-1 FIBER STRAND AND HUMIDITY CONTROL |
| Jul 19, 2023 | A00004 | $90.0K | 00012-1 FMF BLDG PAD DEBRIS REMOVAL - PART 1 |
| Jul 18, 2023 | P00006 | $0 | CONSTRUCTION OF OSS FACILITY CHANGING THE FUNDING FOR BID OPTIONS 1, 2, 4, AND 7. |
| Jul 13, 2023 | A00002 | $5.1K | 00006 EXISTING CONCRETE STRUCTURE DEMO |
| Jul 12, 2023 | P00005 | $0 | CONSTRUCTION OF OSS RADAR AND FIRE TRUCK HANDLING MATERIAL ADDING THE TIKTOK CLAUSE TO THE CONTRACT. |
| Jun 1, 2023 | A00001 | $0 | 00005 TOPO SURVEY DELAY |
| May 25, 2023 | P00004 | $1.8M | CONSTRUCTION OF OSS FACILITY BID OPTION EXECUTION FOR OPTIONS 1, 2, 4, AND 7. |
| Apr 17, 2023 | P00003 | $254.6K | CONSTRUCTION OF OSS FACILITY |
| Jun 28, 2022 | P00002 | $0 | CONSTRUCTION OF OSS FACILITY ADMINISTRATIVE CORRECTION MODIFICATION TO UPDATE CLIN 0006 DELIVERY DATE. |
| Jun 27, 2022 | P00001 | $0 | CONSTRUCTION OF OSS FACILITY NOTICE TO PROCEED MODIFICATION. |
| May 25, 2022 | 0 | $43.0M | CONSTRUCTION OF OSS FACILITY TYNDALL AFB, FL |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.