Federal contract award

W9127822C0017

TYNDALL AIR FORCE BASE SITE DEVELOPMENT AND INFRASTRUCTURE PHASE I & II

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW074 ENDIST MOBILE
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCY1JZ — CONSTRUCTION OF MISCELLANEOUS BUILDINGS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$361.9M
Current contract value$364.7M
Potential contract value / ceiling$364.7M
Start dateMay 2, 2022
Current end dateJun 25, 2026
Potential end dateJun 25, 2026
Latest award activityMay 18, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 60 of 60 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 8, 2026P00020$624.3KTWO-PHASE DESIGN AND CONSTRUCTION OF ZONE 4 TWO-PHASE DESIGN AND CONSTRUCTION SITE DEVELOPMENT AND UTILITIES PHASES I AND II TYNDALL AIR FORCE BASE, FLORIDA
May 18, 2026P00019$315.1KTWO-PHASE DESIGN AND CONSTRUCTION OF ZONE 4 TWO-PHASE DESIGN AND CONSTRUCTION SITE DEVELOPMENT AND UTILITIES PHASES I AND II TYNDALL AIR FORCE BASE, FLORIDA
May 7, 2026P00018$-1.7MTWO-PHASE DESIGN AND CONSTRUCTION OF ZONE 4 TWO-PHASE DESIGN AND CONSTRUCTION SITE DEVELOPMENT AND UTILITIES PHASES I AND II TYNDALL AIR FORCE BASE, FLORIDA
Mar 11, 2026A00040$-308.9KTWO-PHASE DESIGN AND CONSTRUCTION OF ZONE 4 TWO-PHASE DESIGN AND CONSTRUCTION SITE DEVELOPMENT AND UTILITIES PHASES I AND II TYNDALL AIR FORCE BASE, FLORIDA
Feb 5, 2026A00039$-69.4KTWO-PHASE DESIGN AND CONSTRUCTION OF ZONE 4 TWO-PHASE DESIGN AND CONSTRUCTION SITE DEVELOPMENT AND UTILITIES PHASES I AND II TYNDALL AIR FORCE BASE, FLORIDA
Dec 22, 2025A00038$398.6KTI083,TI084,TI088-2,TI090,TI093
Dec 8, 2025A00037$100.0KSCOPE OF WORK ZONE 10 LODGING STORMWATER MITIGATIONITEM 1. THIS WILL BE A TWO PART MODIFICATION. DESIGN AND CONSTRUCTION.THE ZONE 4.1 UTILITIES RFP SHEET CY13G INTENDED THE ZONE 4.1 UTILITIES STORM DRAIN COMING DOWNMINNESOTA AVENUE TO TIE-IN TO A
Oct 28, 2025A00036$16.4KTI069-2 TITLE: P2 MINNESOTA CONDUIT REPAIR
Oct 3, 2025A00035$25.0KTI088-1 TITLE: P2 REDESIGN FOUNDATION FOR PUMP STATION
Sep 30, 2025A00034$92.2KTI087 TITLE: P1 BLDG 267 MECH WALL AND FOUNDATION
Sep 23, 2025A00033$217.5KP2 GCEC CCAS 255,261,276, AND 302
Sep 18, 2025A00032$100.0KTI085-1 TITLE: P1 RELOCATE AL STORM DRAIN_DECONF COMMS
Sep 16, 2025A00031$44.4KCHANGE: TI067 TITLE: P2 AIREY AVE VCP SANITARY LINE
Aug 1, 2025A00030$12.0KTI079 TITLE: P2 UNFORESEEN SLAB MH653
Jul 29, 2025P00017$945.4KTI015-3 P2 POND 25 OUTFALL
Jul 7, 2025A00029$14.0KTI056-2 TITLE: P2 MISSISSIPPI UTILITY PAVING
Jun 18, 2025A00028$7.2KTI066 TITLE: P1 Z1 COPPER SPLICE ENCLOSURES
May 19, 2025A00027$149.5KTI071-2 TITLE: P1 AFFF TANK REMOVAL
Apr 24, 2025A00026$12.9KTI070 TITLE: P1 B11630 TRANSFORMER RELOCATION
Apr 16, 2025A00025$182.9KTI060 P1 B333 PAD TEMPORARY PAVEMENT
Apr 1, 2025A00024$100.0KTI071-1 P1 AFFF TANK REMOVAL
Mar 28, 2025P00016$-1.4MROAD INFRASTRUCTURE PHASE 2 DE-OBLIGATING FUNDS FOR TI057 WAYFINDING SIGNAGE AT TYNDALL AIR FORCE BASE, FL.
Mar 5, 2025A00023$65.0KP2 UNFORESEEN COND. AIREY AVE COMM INFR
Feb 28, 2025A00022$2.8KP2 MINNEOTA CONDUIT REPAIR
Dec 16, 2024A00021$0FUNDING CORRECTION TO A00018
Sep 17, 2024A00020$-287.1KTI032 P2 OLD MISSISSIPPI SIDEWALK TI044 P2 POND 12 DESCOPE TI045 P2 MAGNOLIA DRAINAGE PIPE
Sep 5, 2024A00019$10.0KTI056-1 P2 MISSISSIPPI UTILITY PAVING
Aug 30, 2024A00018$-121.7KTI050 P2 BYPASS PUMP+Z1/Z4 DRIVEWAY+AAFES PARK TI051 P2 BEACON BEACH SIDEWALK TI052 CLINIC WALK+SSLATERAL+HH DRIVE
Jul 26, 2024P00015$-266.2KROAD INFRASTRUCTURE PHASE 2 TI019 P1 LIFT STATION 3 VECP.
Jul 25, 2024P00014$1.5MROAD INFRASTRUCTURE PHASE 2 THIS MODIFICATION IS FOR PROJECTS TI041, TI046-2, TI047, AND TI054 AT TYNDALL AFB, FL.
Jun 27, 2024A00017$81.9KTI028-2 P1 Z1 36" RCP RISER TI039-2 P1 ELECTRICAL VAULT REMOVAL TI049 P1 UNDERGROUND STORAGE TANK REMOVAL
Jun 24, 2024A00016$-80.3KTI029 P1 B560 DRIVE REALIGNMENT & ADDITION TI030-2 P1 DESIGN ELECTRIC CONDUIT FOR 750MCM TI031 P1 COPPER COM RUN FROM MH681-MH315 TI034 P1P2 REM. RAISED WALK & INROAD LIGHTS
May 30, 2024P00013$-1.9MROAD INFRASTRUCTURE PHASE 2 TI018 MISSISSIPPI CULVERT REMOVAL & TI033 1700 AREA FLOODWALL DESCOPE
Apr 29, 2024P00012$40.5KTI038 P1 EAST ALABAMA WATERMAIN REMOVAL
Apr 18, 2024P00011$300.0KROAD INFRASTRUCTURE PHASE 2 TI015-2 PART 2 OF POND #25 OUTFALL AT TYNDALL AFB, FLORIDA. THIS MOD REVISES THE INITIAL NTE ESTABLISHED IN P00008.
Apr 17, 2024A00014$20.0KTI046-1 PL EARLY INSTALL OF MH0701A.9
Apr 5, 2024A00013$148.1KTI014-2 Z3 WEG INCREASED ELECTRICAL DEMAND
Mar 21, 2024A00012$54.1KTI017-L RELOCATION OF LIFT STATION 2
Mar 6, 2024A00009$214.3KTI016 SUWANNEE AVE SANITARY FORCE MAIN TIE-IN TI024-2 P2 STATIC DISPLAY HAZMAT REMOVAL
Feb 27, 2024A00011$50.0KTI030-1 DESIGN ELECTRIC CONDUIT FOR 750MCM AL
Feb 27, 2024P00010$1.5MROAD INFRASTRUCTURE PHASE 2 TR004-3 LODGING STORMWATER MITIGATION PART 3 OF A 3 PART MODIFICATION.
Feb 7, 2024A00010$7.5KTI039-1 P1 ELECTRICAL VAULT REMOVAL
Feb 6, 2024A00008$0TI022 Z4.1 P1 REMOVAL OF MQ-9 MINILOOP
Oct 25, 2023P00009$-610.8KROAD INFRASTRUCTURE PHASE 2 TI011 DESCOPE Z10 WEST MECHANICAL BUILDING
Oct 23, 2023A00007$10.0KTI028-1 P1 - Z1 36" RCP RISER
Sep 11, 2023A00006$40.0KTI024-1 P2 STATIC DISPLAY HAZMAT REMOVAL
Aug 30, 2023P00008$50.0KROAD INFRASTRUCTURE PHASE 2 UCO FOR TI015-1 POND 25 OUTFALL AT TYNDALL AFB.
Aug 21, 2023A00005$0TR007 ELECTRICAL CONDUIT SIZE CHANGE
Aug 16, 2023A00004$86.1KTI013 BUILDING 503 SANITARY SEWER LATERAL
Jul 13, 2023A00003$50.0KTI014-1 Z3 WEG INCREASED ELECTRICAL DEMAND
Jun 27, 2023A00002$-71.9KTR010 DESCOPE NATURAL GAS DESIGN
Jun 22, 2023P00007$0ROAD INFRASTRUCTURE PHASE 2 ADDING THE TIKTOK CLAUSE TO THE CONTRACT.
Jun 15, 2023A00001$25.9KTR008 T256 TO REMAIN
Jun 1, 2023P00006$272.2KROAD INFRASTRUCTURE PHASE 2 FOR COSTS AND FEES ASSOCIATED WITH APPENDIX G CHANGES.
Apr 21, 2023P00005$174.1KROAD INFRASTRUCTURE PHASE 2 ADD FUNDING FOR ZONE 10 LODGING STORMWATER MITIGATION.
Jan 6, 2023P00004$118.5KROAD INFRASTRUCTURE PHASE 2 INCREASE CONTRACT FOR TWO-PHASE DESIGN AND CONSTRUCTION AND UTILITIES PHASES I AND II TYNDALL AIR FORCE BASE, FLORIDA ZONE 10 LODGING STORMWATER MITIGATION
Sep 29, 2022P00003$2.6MROAD INFRASTRUCTURE PHASE 2 ADDING FUNDING
Sep 12, 2022P00002$0ROAD INFRASTRUCTURE PHASE 2 ADDING CLAUSES 52.230-2 AND 52.230-6
May 17, 2022P00001$0ROAD INFRASTRUCTURE PHASE 2 NOTICE TO PROCEED MODIFICATION.
Apr 29, 20220$358.0MTYNDALL AIR FORCE BASE SITE DEVELOPMENT AND INFRASTRUCTURE PHASE I & II

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.