Federal contract award
W9127822C0017
TYNDALL AIR FORCE BASE SITE DEVELOPMENT AND INFRASTRUCTURE PHASE I & II
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W074 ENDIST MOBILE |
| NAICS | 237990 — Other Heavy and Civil Engineering Construction |
| PSC | Y1JZ — CONSTRUCTION OF MISCELLANEOUS BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $361.9M |
| Current contract value | $364.7M |
| Potential contract value / ceiling | $364.7M |
| Start date | May 2, 2022 |
| Current end date | Jun 25, 2026 |
| Potential end date | Jun 25, 2026 |
| Latest award activity | May 18, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 60 of 60 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 8, 2026 | P00020 | $624.3K | TWO-PHASE DESIGN AND CONSTRUCTION OF ZONE 4 TWO-PHASE DESIGN AND CONSTRUCTION SITE DEVELOPMENT AND UTILITIES PHASES I AND II TYNDALL AIR FORCE BASE, FLORIDA |
| May 18, 2026 | P00019 | $315.1K | TWO-PHASE DESIGN AND CONSTRUCTION OF ZONE 4 TWO-PHASE DESIGN AND CONSTRUCTION SITE DEVELOPMENT AND UTILITIES PHASES I AND II TYNDALL AIR FORCE BASE, FLORIDA |
| May 7, 2026 | P00018 | $-1.7M | TWO-PHASE DESIGN AND CONSTRUCTION OF ZONE 4 TWO-PHASE DESIGN AND CONSTRUCTION SITE DEVELOPMENT AND UTILITIES PHASES I AND II TYNDALL AIR FORCE BASE, FLORIDA |
| Mar 11, 2026 | A00040 | $-308.9K | TWO-PHASE DESIGN AND CONSTRUCTION OF ZONE 4 TWO-PHASE DESIGN AND CONSTRUCTION SITE DEVELOPMENT AND UTILITIES PHASES I AND II TYNDALL AIR FORCE BASE, FLORIDA |
| Feb 5, 2026 | A00039 | $-69.4K | TWO-PHASE DESIGN AND CONSTRUCTION OF ZONE 4 TWO-PHASE DESIGN AND CONSTRUCTION SITE DEVELOPMENT AND UTILITIES PHASES I AND II TYNDALL AIR FORCE BASE, FLORIDA |
| Dec 22, 2025 | A00038 | $398.6K | TI083,TI084,TI088-2,TI090,TI093 |
| Dec 8, 2025 | A00037 | $100.0K | SCOPE OF WORK ZONE 10 LODGING STORMWATER MITIGATIONITEM 1. THIS WILL BE A TWO PART MODIFICATION. DESIGN AND CONSTRUCTION.THE ZONE 4.1 UTILITIES RFP SHEET CY13G INTENDED THE ZONE 4.1 UTILITIES STORM DRAIN COMING DOWNMINNESOTA AVENUE TO TIE-IN TO A |
| Oct 28, 2025 | A00036 | $16.4K | TI069-2 TITLE: P2 MINNESOTA CONDUIT REPAIR |
| Oct 3, 2025 | A00035 | $25.0K | TI088-1 TITLE: P2 REDESIGN FOUNDATION FOR PUMP STATION |
| Sep 30, 2025 | A00034 | $92.2K | TI087 TITLE: P1 BLDG 267 MECH WALL AND FOUNDATION |
| Sep 23, 2025 | A00033 | $217.5K | P2 GCEC CCAS 255,261,276, AND 302 |
| Sep 18, 2025 | A00032 | $100.0K | TI085-1 TITLE: P1 RELOCATE AL STORM DRAIN_DECONF COMMS |
| Sep 16, 2025 | A00031 | $44.4K | CHANGE: TI067 TITLE: P2 AIREY AVE VCP SANITARY LINE |
| Aug 1, 2025 | A00030 | $12.0K | TI079 TITLE: P2 UNFORESEEN SLAB MH653 |
| Jul 29, 2025 | P00017 | $945.4K | TI015-3 P2 POND 25 OUTFALL |
| Jul 7, 2025 | A00029 | $14.0K | TI056-2 TITLE: P2 MISSISSIPPI UTILITY PAVING |
| Jun 18, 2025 | A00028 | $7.2K | TI066 TITLE: P1 Z1 COPPER SPLICE ENCLOSURES |
| May 19, 2025 | A00027 | $149.5K | TI071-2 TITLE: P1 AFFF TANK REMOVAL |
| Apr 24, 2025 | A00026 | $12.9K | TI070 TITLE: P1 B11630 TRANSFORMER RELOCATION |
| Apr 16, 2025 | A00025 | $182.9K | TI060 P1 B333 PAD TEMPORARY PAVEMENT |
| Apr 1, 2025 | A00024 | $100.0K | TI071-1 P1 AFFF TANK REMOVAL |
| Mar 28, 2025 | P00016 | $-1.4M | ROAD INFRASTRUCTURE PHASE 2 DE-OBLIGATING FUNDS FOR TI057 WAYFINDING SIGNAGE AT TYNDALL AIR FORCE BASE, FL. |
| Mar 5, 2025 | A00023 | $65.0K | P2 UNFORESEEN COND. AIREY AVE COMM INFR |
| Feb 28, 2025 | A00022 | $2.8K | P2 MINNEOTA CONDUIT REPAIR |
| Dec 16, 2024 | A00021 | $0 | FUNDING CORRECTION TO A00018 |
| Sep 17, 2024 | A00020 | $-287.1K | TI032 P2 OLD MISSISSIPPI SIDEWALK TI044 P2 POND 12 DESCOPE TI045 P2 MAGNOLIA DRAINAGE PIPE |
| Sep 5, 2024 | A00019 | $10.0K | TI056-1 P2 MISSISSIPPI UTILITY PAVING |
| Aug 30, 2024 | A00018 | $-121.7K | TI050 P2 BYPASS PUMP+Z1/Z4 DRIVEWAY+AAFES PARK TI051 P2 BEACON BEACH SIDEWALK TI052 CLINIC WALK+SSLATERAL+HH DRIVE |
| Jul 26, 2024 | P00015 | $-266.2K | ROAD INFRASTRUCTURE PHASE 2 TI019 P1 LIFT STATION 3 VECP. |
| Jul 25, 2024 | P00014 | $1.5M | ROAD INFRASTRUCTURE PHASE 2 THIS MODIFICATION IS FOR PROJECTS TI041, TI046-2, TI047, AND TI054 AT TYNDALL AFB, FL. |
| Jun 27, 2024 | A00017 | $81.9K | TI028-2 P1 Z1 36" RCP RISER TI039-2 P1 ELECTRICAL VAULT REMOVAL TI049 P1 UNDERGROUND STORAGE TANK REMOVAL |
| Jun 24, 2024 | A00016 | $-80.3K | TI029 P1 B560 DRIVE REALIGNMENT & ADDITION TI030-2 P1 DESIGN ELECTRIC CONDUIT FOR 750MCM TI031 P1 COPPER COM RUN FROM MH681-MH315 TI034 P1P2 REM. RAISED WALK & INROAD LIGHTS |
| May 30, 2024 | P00013 | $-1.9M | ROAD INFRASTRUCTURE PHASE 2 TI018 MISSISSIPPI CULVERT REMOVAL & TI033 1700 AREA FLOODWALL DESCOPE |
| Apr 29, 2024 | P00012 | $40.5K | TI038 P1 EAST ALABAMA WATERMAIN REMOVAL |
| Apr 18, 2024 | P00011 | $300.0K | ROAD INFRASTRUCTURE PHASE 2 TI015-2 PART 2 OF POND #25 OUTFALL AT TYNDALL AFB, FLORIDA. THIS MOD REVISES THE INITIAL NTE ESTABLISHED IN P00008. |
| Apr 17, 2024 | A00014 | $20.0K | TI046-1 PL EARLY INSTALL OF MH0701A.9 |
| Apr 5, 2024 | A00013 | $148.1K | TI014-2 Z3 WEG INCREASED ELECTRICAL DEMAND |
| Mar 21, 2024 | A00012 | $54.1K | TI017-L RELOCATION OF LIFT STATION 2 |
| Mar 6, 2024 | A00009 | $214.3K | TI016 SUWANNEE AVE SANITARY FORCE MAIN TIE-IN TI024-2 P2 STATIC DISPLAY HAZMAT REMOVAL |
| Feb 27, 2024 | A00011 | $50.0K | TI030-1 DESIGN ELECTRIC CONDUIT FOR 750MCM AL |
| Feb 27, 2024 | P00010 | $1.5M | ROAD INFRASTRUCTURE PHASE 2 TR004-3 LODGING STORMWATER MITIGATION PART 3 OF A 3 PART MODIFICATION. |
| Feb 7, 2024 | A00010 | $7.5K | TI039-1 P1 ELECTRICAL VAULT REMOVAL |
| Feb 6, 2024 | A00008 | $0 | TI022 Z4.1 P1 REMOVAL OF MQ-9 MINILOOP |
| Oct 25, 2023 | P00009 | $-610.8K | ROAD INFRASTRUCTURE PHASE 2 TI011 DESCOPE Z10 WEST MECHANICAL BUILDING |
| Oct 23, 2023 | A00007 | $10.0K | TI028-1 P1 - Z1 36" RCP RISER |
| Sep 11, 2023 | A00006 | $40.0K | TI024-1 P2 STATIC DISPLAY HAZMAT REMOVAL |
| Aug 30, 2023 | P00008 | $50.0K | ROAD INFRASTRUCTURE PHASE 2 UCO FOR TI015-1 POND 25 OUTFALL AT TYNDALL AFB. |
| Aug 21, 2023 | A00005 | $0 | TR007 ELECTRICAL CONDUIT SIZE CHANGE |
| Aug 16, 2023 | A00004 | $86.1K | TI013 BUILDING 503 SANITARY SEWER LATERAL |
| Jul 13, 2023 | A00003 | $50.0K | TI014-1 Z3 WEG INCREASED ELECTRICAL DEMAND |
| Jun 27, 2023 | A00002 | $-71.9K | TR010 DESCOPE NATURAL GAS DESIGN |
| Jun 22, 2023 | P00007 | $0 | ROAD INFRASTRUCTURE PHASE 2 ADDING THE TIKTOK CLAUSE TO THE CONTRACT. |
| Jun 15, 2023 | A00001 | $25.9K | TR008 T256 TO REMAIN |
| Jun 1, 2023 | P00006 | $272.2K | ROAD INFRASTRUCTURE PHASE 2 FOR COSTS AND FEES ASSOCIATED WITH APPENDIX G CHANGES. |
| Apr 21, 2023 | P00005 | $174.1K | ROAD INFRASTRUCTURE PHASE 2 ADD FUNDING FOR ZONE 10 LODGING STORMWATER MITIGATION. |
| Jan 6, 2023 | P00004 | $118.5K | ROAD INFRASTRUCTURE PHASE 2 INCREASE CONTRACT FOR TWO-PHASE DESIGN AND CONSTRUCTION AND UTILITIES PHASES I AND II TYNDALL AIR FORCE BASE, FLORIDA ZONE 10 LODGING STORMWATER MITIGATION |
| Sep 29, 2022 | P00003 | $2.6M | ROAD INFRASTRUCTURE PHASE 2 ADDING FUNDING |
| Sep 12, 2022 | P00002 | $0 | ROAD INFRASTRUCTURE PHASE 2 ADDING CLAUSES 52.230-2 AND 52.230-6 |
| May 17, 2022 | P00001 | $0 | ROAD INFRASTRUCTURE PHASE 2 NOTICE TO PROCEED MODIFICATION. |
| Apr 29, 2022 | 0 | $358.0M | TYNDALL AIR FORCE BASE SITE DEVELOPMENT AND INFRASTRUCTURE PHASE I & II |