TURBINE REHABILITATION AND GENERATOR REWIND, NORFORK LAKE, DAM AND POWERHOUSE, WHITE RIVER BASIN, BAXTER COUNTY, ARKANSAS. COMPLETION IS EXPECTED NLT 1,975 CALENDAR DAYS AFTER RECEIPT OF NOTICE TO PROCEED.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W076 ENDIST LITTLE ROCK |
| NAICS | 237990 — Other Heavy and Civil Engineering Construction |
| PSC | Z2QA — REPAIR OR ALTERATION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE) |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $55.9M |
| Current contract value | $56.0M |
| Potential contract value / ceiling | $57.2M |
| Start date | Dec 21, 2022 |
| Current end date | Jul 28, 2028 |
| Potential end date | Jul 28, 2028 |
| Latest award activity | May 22, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 18 of 18 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 22, 2026 | A00014 | $1.3M | A. SCOPE OF WORK CC014 DESCOPE REMOVAL OF STATOR CORE(S) |
| Feb 18, 2026 | A00013 | $-62.0K | A. SCOPE OF WORK CC014 DESCOPE REMOVAL OF STATOR CORE(S) |
| Jan 22, 2026 | A00012 | $0 | A. SCOPE OF WORK CC016 TIME EXTENSION TO ALIGN MOBILIZATION |
| Oct 31, 2025 | A00011 | $20.2K | CONTRACT FOR TURBINE REHABILITATION AND GENERATOR REWIND, NORFORK POWERHOUSE REFERENCE NO. R00015 CHANGE: CC017 TITLE: REPLACE ROTOR PED FLANGE |
| Aug 29, 2025 | A00010 | $89.9K | CONTRACT FOR TURBINE REHABILITATION AND GENERATOR REWIND, NORFORK POWERHOUSE REFERENCE NO. R00014 CHANGE: CC013 TITLE: REA RELATED TO P00003 DESCOPE |
| Aug 11, 2025 | A00009 | $320.2K | CONTRACT FOR TURBINE REHABILITATION AND GENERATOR REW IND, NORFORK POW ERHOUSE REFERENCE NO. R00013 CC011 TITLE: NEW GRATED WALK SURFACE IN TURBINE PIT |
| Feb 24, 2025 | A00008 | $200.0K | NO. W9127S22C0005 NF TURBINE REHAB AND GENERATOR REW R00012 - REDESIGN & REPLACE UPPER BEARING DECK CC012-1 REDESIGN & REPLACE UPPER BEARING DECK |
| Feb 19, 2025 | A00007 | $0 | 53.243CONTRACT FOR TURBINE REHABILITATION AND GENERATOR REWIND, NORFORK POWERHOUSE REFERENCE NO. R00011 CC009 CORRERCT UNIT OF MEASURE ON CLIN 114 |
| Feb 6, 2025 | A00006 | $0 | 53.243CONTRACT FOR TURBINE REHABILITATION AND GENERATOR REWIND, NORFORK POWERHOUSE. REFERENCE NO. R00005 CC006 WICKET GATE END CLEARENCE |
| Jan 29, 2025 | A00005 | $-83.0K | CONTRACT FOR TURBINE REHABILITATION AND GENERATOR REWIND, NORFORK POWERHOUSE CC010 DELETION & SUBSTITUTION OF AIR VALVES REFERENCE NO. R00009 |
| Dec 19, 2024 | P00003 | $-411.0K | CONTRACT FOR TURBINE REHABILITATION AND GENERATOR REWIND, NORFORK POWERHOUSE. REFERENCE NO. R00008 CC007 DEOBLIGATE GUIDE BEARING REFURBISHMENT |
| Sep 24, 2024 | A00004 | $-330.4K | CONTRACT FOR TURBINE REHABILITATION AND GENERATOR REWIND, NORFORK POWERHOUSE. REFERENCE NO. R00007 CC004 DELETE POST-DISASSEMBLY TESTING OF CORES |
| Jul 16, 2024 | A00003 | $12.9K | 53.243CONTRACT FOR TURBINE REHABILITATION AND GENERATOR REWIND, NORFORK POWERHOUSE. REFERENCE NO. R00006 CC008 REPAIR WELDS ON BTH LIFTING DEVICES |
| Jul 2, 2024 | A00002 | $64.2K | 53.243CONTRACT FOR TURBINE REHABILITATION AND GENERATOR REWIND, NORFORK POWERHOUSE. REFERENCE NO. R00005 CC002 REPAIR ROTOR PEDESTAL |
| Jun 5, 2024 | A00001 | $0 | 53.243CONTRACT FOR TURBINE REHABILITATION AND GENERATOR REWIND, NORFORK POWERHOUSE.REFERENCE NO. R00004 CC005 DIGITAL CONTROLS FOR VALVE ACTUATORS |
| Apr 22, 2024 | P00002 | $585.7K | TURBINE REHABILITATION AND GENERATOR REWIND AT NORFORK POWERHOUSE, MOUNTAIN HOME PROJECT. THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CHANGES ASSOCIATED WITH CC0001/RFP-0001 UPDATE WICKET GATE SAFETY DEVICES. |
| Dec 6, 2023 | P00001 | $2.6M | TURBINE REHABILITATION & GENERATOR REWIND AT NORFORK POWERHOUSE. THIS MODIFICATION EXERCISES OPTIONAL CLINS 0142 AND 0170. |
| Sep 22, 2022 | 0 | $49.6M | TURBINE REHABILITATION AND GENERATOR REWIND, NORFORK LAKE, DAM AND POWERHOUSE, WHITE RIVER BASIN, BAXTER COUNTY, ARKANSAS. COMPLETION IS EXPECTED NLT 1,975 CALENDAR DAYS AFTER RECEIPT OF NOTICE TO PROCEED. |
Estimated positioning window
Jul 28, 2027 – Jan 28, 2028
70/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 70/100. Available recorded signals: 65 points.
- Contract end 2028-07-28 (635 days from calculation)
- +25 points
- 9 historical awards in this buyer and category group
- +15 points
- 18 recorded award transactions
- +10 points
- Latest award action: 2026-05-22
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.