Federal contract award
W9127S25C0001
DESIGN-BID-BUILD OF THREE RIVERS PHASE 2 HYDRAULIC CONTAINMENT STRUCTURE AND MODIFICATIONS TO OWENS LAKE AND LA GRUES LAKE CULVERTS. WORK WILL INCLUDE, BUT NOT LIMITED TO, ACTIVITIES SUCH AS CLEARING, GRUBBING, EXCAVATION AND HAUL ROADS.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W076 ENDIST LITTLE ROCK |
| NAICS | 237990 — Other Heavy and Civil Engineering Construction |
| PSC | Y1PZ — CONSTRUCTION OF OTHER NON-BUILDING FACILITIES |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $109.2M |
| Current contract value | $109.5M |
| Potential contract value / ceiling | $109.5M |
| Start date | Dec 17, 2024 |
| Current end date | Jan 8, 2028 |
| Potential end date | Jan 8, 2028 |
| Latest award activity | Apr 27, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Apr 27, 2026 | P00003 | $812.2K | A. SCOPE OF WORK CC001 BENZAL ROAD IMPROVEMENTSPURSUANT TO CONTRACT CLAUSE FAR 52.243-4, CHANGES, THE CONTRACTOR SHALL FURNISH ALL COSTS ASSOCIATED THE PROCUREMENT AND PLACEMENT OF CLASS 7 BASE ALONG THE HIGHLIGHTED PORTION OF BENZAL ROAD AS SHOWN |
| Oct 29, 2025 | P00002 | $4.8M | P00002 ADDITIONAL COSTS TO CONSTRUCT CONTAINMENT STRUCTURE C157 DUE TO DIFFERING SITE CONDITION. |
| Jun 26, 2025 | P00001 | $0 | DESIGN-BID-BUILD OF THREE RIVERS PHASE 2 HYDRAULIC CONTAINMENT STRUCTURE AND MODIFICATIONS TO OWNS LAKE AND LA GRUES LAKE CULVERTS. |
| Mar 20, 2025 | A00001 | $245.7K | CONTRACT FOR FY25 THREE RIVERS PHASE 2 REFERENCE NO. R00001 CC001 BENZAL ROAD IMPROVEMENTS |
| Dec 17, 2024 | 0 | $103.6M | DESIGN-BID-BUILD OF THREE RIVERS PHASE 2 HYDRAULIC CONTAINMENT STRUCTURE AND MODIFICATIONS TO OWENS LAKE AND LA GRUES LAKE CULVERTS. WORK WILL INCLUDE, BUT NOT LIMITED TO, ACTIVITIES SUCH AS CLEARING, GRUBBING, EXCAVATION AND HAUL ROADS. |
Estimated positioning window
Jan 8, 2027 – Jul 8, 2027
65/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 65/100. Available recorded signals: 60 points.
- Contract end 2028-01-08 (433 days from calculation)
- +25 points
- 2 historical awards in this buyer and category group
- +10 points
- 5 recorded award transactions
- +10 points
- Latest award action: 2026-04-27
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.