Federal contract award

W9127S25C0003

RAW WATER PIPING SYSTEM REPLACEMENT, TABLE ROCK DAM POWERHOUSE, TANEY COUNTY, MISSOURI. 720-DAY CONTRACT DURATION BEGINNING UPON RECEIPT OF NTP. DATES ON CAR ARE ONLY ESTIMATES.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW076 ENDIST LITTLE ROCK
NAICS237110 — Water and Sewer Line and Related Structures Construction
PSCZ1MD — MAINTENANCE OF EPG FACILITIES - HYDRO
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$7.6M
Current contract value$7.6M
Potential contract value / ceiling$7.6M
Start dateJan 9, 2025
Current end dateOct 29, 2026
Potential end dateDec 31, 2026
Latest award activityApr 9, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 9, 2026A00001$27.7KPROVIDE NEW CONTROLLERS TO REPLACE EXISTING CONTROLLERS FOR THRUST BEARING COOLING WATER EQUIPMENT. PROVIDE NEW CONTROLLER FOR NEW THRUST BEARING COOLING VALVE FLOW METER. INTEGRATE CONTROLS FOR ALL THREE FLOW METERS ON EACH UNIT.
Mar 5, 2026P00005$188.0KW9127S25C0003, RAW WATER PIPING SYSTEM REPLACEMENT, TABLE ROCK DAM POWERHOUSE, EXERCISE OPTIONAL CLIN 0015
Jul 25, 2025P00004$1.5MRAW WATER PIPING SYSTEM REPLACEMENT AT TABLE ROCK POWERHOUSE. MODIFICATION TO EXERCISE OPTIONAL CLINS FOR REPLACEMENT OF RAW WATER SYSTEM INSIDE GENERATION UNITS 1, 3, AND 4, AND INSPECTION OF EMBEDDED PIPE AND HYDROCLEAN.
Jun 24, 2025P00003$477.2KTABLE ROCK POWERHOUSE RAW WATER SYSTEM REPLACEMENT. EXERCISE OPTION CLIN 0010. CONTRACT DURATION IS NOT EXTENDED.
May 7, 2025P00002$0CLAUSE UPDATES IAW CLASS DEVIATIONS 2025-O0003 - RESTORING MERIT BASED OPPORTUNITY IN FEDERAL CONTRACTS (EFFECTIVE 04 MARCH 2025) AND 2025-O0004 - REVOCATION OF EXECUTIVE ORDER ON SUSTAINABILITY (EFFECTIVE 07 MARCH 2025).
Apr 2, 2025P00001$41.1KTABLE ROCK POWERHOUSE RAW WATER SYSTEM REPLACEMENT. EXERCISING OPTION CLINS 0005 - 0008 AND UPDATING DELIVERY TO REFLECT CONTRACT COMPLETION DATE ON NTP 28 DEC 2026.
Dec 5, 20240$5.4MRAW WATER PIPING SYSTEM REPLACEMENT, TABLE ROCK DAM POWERHOUSE, TANEY COUNTY, MISSOURI. 720-DAY CONTRACT DURATION BEGINNING UPON RECEIPT OF NTP. DATES ON CAR ARE ONLY ESTIMATES.

Estimated positioning window

Nov 1, 2026 – Jan 30, 2027

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2026-12-31 (60 days from calculation)
+35 points
1 historical awards in this buyer and category group
+0 points
7 recorded award transactions
+10 points
Latest award action: 2026-04-09
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Check the stated set-aside against the solicitation and current certifications.
  4. Review the award scope and buyer evidence before making a bid/no-bid decision.