Federal contract award

W9128F23C0002

CONSTRUCT B-21 ADAL FLIGHT SIMULATOR FAC

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW071 ENDIST OMAHA
NAICS236220 — Commercial and Institutional Building Construction
PSCY1EZ — CONSTRUCTION OF OTHER INDUSTRIAL BUILDINGS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$44.6M
Current contract value$44.6M
Potential contract value / ceiling$45.8M
Start dateDec 5, 2022
Current end dateApr 10, 2026
Potential end dateApr 10, 2026
Latest award activityMar 19, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 13 of 13 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Mar 19, 2026A00042$58.2KADDITION TO B.8205 FROM B-1 SIM TO B-21 SIM FAC. R-CONCRETE FOUNDATIONS, CONCRETE FLOOR, STRUCTURAL STEEL FRAME W/SPLIT FACED CONCRETE UNIT FACADE, STANDING SEAM METAL ROOF. PROJ TO INCLUDE 16,183 SF FLIGHT SIM W/9,526 SF SCIF - 2 HIGH-BAYS W/POWER
Mar 5, 2026A00041$14.1KADDITION TO B.8205 FROM B-1 SIM TO B-21 SIM FAC. R-CONCRETE FOUNDATIONS, CONCRETE FLOOR, STRUCTURAL STEEL FRAME W/SPLIT FACED CONCRETE UNIT FACADE, STANDING SEAM METAL ROOF. PROJ TO INCLUDE 16,183 SF FLIGHT SIM W/9,526 SF SCIF - 2 HIGH-BAYS W/POWER
Oct 14, 2025A00040$35.0KCD: B-21 ADAL FLIGHT SIMULATOR (SIM), EAFB - R00061 ADD CONNECTION FOR ELEVATOR PHONE
Sep 29, 2025A00039$0CONSTRUCT B-21 ADAL FLIGHT SIMULATOR FAC
Jul 1, 2025A00038$321.8KCD - B-21 ADAL FLIGHT SIMULATOR (SIM}, EAFB - R00060 WST POWER REQUIREMENT- RM 145 & 149 SERVER RMS
Jun 23, 2025A00037$466.8KCD - B-21 ADAL FLIGHT SIMULATOR (SIM}, EAFB - R00059 CONNECTING CONDUITS - PHASE 1 TO PHASE 2
Feb 4, 2025A00036$29.3KCD - B-21 ADAL FLIGHT SIMULATOR (SIM}, EAFB - R00056 REVISE CONCRETE STOOP, AND R00058 ADD WALL FURRING
Dec 19, 2024A00035$83.0KCD - B-21 ADAL FLIGHT SIMULATOR (SIM}, EAFB - R00047 FURNISH BREATHING AIR SYSTEM
Nov 12, 2024A00034$71.1KCD - B-21 ADAL FLIGHT SIMULATOR (SIM}, EAFB - R/54 MODIFY WALL AND OH DOOR DETAILS R/55 ADD RF SHIELDING AT TRANSITIONS
Nov 6, 2024P00007$793.1KCD - B-21 ADAL FLIGHT SIMULATOR (SIM}, EAFB - R10041 MODIFICATION TO ADD FINISH TO FIRST LAYER SECURE CEILINGS PT-2
Oct 22, 2024A00033$12.2KCD - B-21 ADAL FLIGHT SIMULATOR (SIM}, EAFB - R00052 REVISE DOOR 119A HARDWARE CHANGE
Oct 10, 2024A00032$115.6KCD - B-21 ADAL FLIGHT SIMULATOR (SIM}, EAFB - R00042 SECURE & SOUND WALL DUCT REVISIONS R00051 REVISE PLBG VENTS & CW PIPE RM 110 R00053 ADD EXPANSION JOINT AT GRIDLINE 11.2- TRUE CEILING
Oct 7, 2024A00031$29.8KCD - B-21 ADAL FLIGHT SIMULATOR (SIM}, EAFB R10040 ADD FINISH TO BASE LAYER ON SECURE WALL & CEILINGS PART-2

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.