Federal contract award

W9128F23C0036

BLDG 504- DESIGN AND CONSTRUCTION REPAIR

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW071 ENDIST OMAHA
NAICS236220 — Commercial and Institutional Building Construction
PSCZ2AZ — REPAIR OR ALTERATION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$17.3M
Current contract value$17.3M
Potential contract value / ceiling$17.3M
Start dateSep 11, 2023
Current end dateSep 7, 2026
Potential end dateSep 7, 2026
Latest award activityJun 5, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 12 of 12 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 5, 2026A00007$122.3KREPAIR BUILDING 303/504
Jun 1, 2026A00006$139.2KREPAIR BUILDING 303/504
Sep 29, 2025A00005$115.2KBLDG 504- DESIGN AND CONSTRUCTION REPAIR R00008 OSP COPPER FIBER INSTALL
Sep 26, 2025A00002$252.1KBLDG 504- DESIGN AND CONSTRUCTION REPAIR R00003 CONDENSING UNIT CHILLER WIRES GAS LINE
Sep 26, 2025A00003$81.7KBLDG 504- DESIGN AND CONSTRUCTION REPAIR R00005 FIRE WALL SOUND ATTENUATION
Sep 26, 2025A00004$22.8KBLDG 504- DESIGN AND CONSTRUCTION REPAIR R00007 RM 2400 HVAC ELEC CONFIG
Sep 18, 2025A00001$37.5KBLDG 504- DESIGN AND CONSTRUCTION REPAIR R00004 MECHANICAL AND ELECTRICAL
Jul 22, 2025P00004$0BLDG 504- DESIGN AND CONSTRUCTION REPAIR R00006 CORRECTION TO P00003
May 15, 2025P00003$408.8KBLDG 504- DESIGN AND CONSTRUCTION REPAIR R00002 Z DUCT UPDATE DOOR UPDATE AND DIELECTRIC BREAKS
Mar 21, 2025P00002$-133.8KR00001 PARTIAL TERMINATION OF WORK ON BULDING 303 BLDG 303 DESIGN AND CONSTRUCTION REPAIR
Sep 12, 2023P00001$0BLDG 504- DESIGN AND CONSTRUCTION REPAIR
Aug 21, 20230$16.1MBLDG 504- DESIGN AND CONSTRUCTION REPAIR

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.