Federal contract award
W9128F24C0009
CONSTRUCTION OF GBSD INTEGRATED COMMAND CENTER, F. E. WARREN AFB
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W071 ENDIST OMAHA |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Y1JZ — CONSTRUCTION OF MISCELLANEOUS BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $119.0M |
| Current contract value | $229.5M |
| Potential contract value / ceiling | $229.5M |
| Start date | Jan 25, 2024 |
| Current end date | Nov 28, 2026 |
| Potential end date | Nov 28, 2026 |
| Latest award activity | May 27, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 32 of 32 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 27, 2026 | P00017 | $1.5M | R00030-2 - ASI 0011 HEMP REVISIONS (NTE) |
| Apr 17, 2026 | P00016 | $1.5M | R00035-1 ASI 013 - TEMPEST SHIELDED ENCLOSURES (NTE) |
| Apr 6, 2026 | P00015 | $2.9M | R00032 RFI 0395 - HEMP FRAMING STUB COLUMN CAP PLATE ELEVATIONS |
| Mar 25, 2026 | P00014 | $250.0K | BB GBSD - INTEGRATED COMMAND CENTER - R00030-1 ASI 0011 HEMP REVISIONS (NTE) |
| Mar 20, 2026 | A00014 | $472.0K | BB GBSD - INTEGRATED COMMAND CENTER - MODIFICATION R00036 CTI LOG ROLL UP MOD# 010 |
| Mar 19, 2026 | A00013 | $386.2K | BB GBSD - INTEGRATED COMMAND CENTER MODIFICATION R00034 - CTI ROLL UP 009 |
| Feb 6, 2026 | A00012 | $351.2K | CONSTRUCT GBSD INTEGRATED COMMAND CENTER BUILDING, F.E. WARREN AFB, WY |
| Jan 22, 2026 | P00013 | $551.0K | CONSTRUCT GBSD INTEGRATED COMMAND CENTER BUILDING, F.E. WARREN AFB, WY |
| Nov 17, 2025 | P00012 | $1.0M | CD-CONSTRUCT GBSD INTEGRATED COMMAND CENTER BUILDING, FE WARREN AFB, WY R00027-2 ASI-012 WAVEGUIDE SCHEDULES PART 2 |
| Oct 31, 2025 | A00011 | $409.7K | CD-CONSTRUCT GBSC INTEGRATED COMMAND CENTER BUILDING, FE WARREN AFB, WY R00001 ASI-003 PROTECTIVE TECHNICAL BARRIER SPECS |
| Oct 30, 2025 | P00011 | $1.8M | CD-CONSTRUCT GBSD INTEGRATED COMMAND CENTER BUILDING, FE WARREN AFB, WY R00007 ASI-0004 CB PRESSURIZATION |
| Sep 24, 2025 | P00010 | $1.5M | ICC BUILDING - NC3 VAULT ASI 0005 |
| Sep 8, 2025 | A00010 | $387.0K | CD - CONSTRUCT GBSD INTEGRATED COMMAND CENTER BLDG, FE WARREN AFB, WY R00025 RFI 0172 - MECHANICAL WAVEGUIDE CLARIFICATION |
| Aug 27, 2025 | A00009 | $231.7K | CD-CONSTRUCT GBSD INTEGRATED COMMAND CENTER BUILDING, FE WARREN AFB, WY R00024 RFI-0197 COLUMN 1068/BEAM 1049 CONNECTION |
| Aug 25, 2025 | A00008 | $81.0K | CD - CONSTRUCT GBSD INTEGRATED COMMAND CENTER BLDG, FE WARREN AFB, WY R00031 CTI LOG ROLL UP MOD #0007 |
| Aug 6, 2025 | P00009 | $308.8K | CD-CONSTRUCT GBSD INTEGRATED COMMAND CENTER BUILDING, FE WARREN AFB, WY R00016 MECHANICAL YARD SLAB CHANGE |
| Jul 23, 2025 | P00008 | $49.9K | CD-CONSTRUCT GBSD INTEGRATED COMMAND CENTER BUILDING, FE WARREN AFB, WY R00014 HYDRAULIC PIPE MATERIAL CHANGE |
| Jul 3, 2025 | P00007 | $500.0K | CD - INTEGRATED COMMAND CENTER (ICC), F.E. WARREN AFB, WY R00027-1 ASI 012 WAVEGUIDE SCHEDULE NOT TO EXCEED (NTE) |
| Jun 27, 2025 | A00007 | $241.2K | CD - CONSTRUCT GBSD INTEGRATED COMMAND CENTER BLDG, FE WARREN AFB, WY R00021 CTI LOG ROLL UP MOD# 6 (ITEMS: 15,30,34,37,47,55-57,59-60,62,64-69) |
| Jun 20, 2025 | A00006 | $179.7K | CD-CONSTRUCT GBSD INTEGRATED COMMAND CENTER BUILDING, FE WARREN AFB, WY R00023 RFI-0217 CHANNEL SIZE (TOP OF PRECAST) |
| Jun 4, 2025 | P00006 | $4.3M | EXERCISING OPTION CLINS 0007, 0008, 0009, 0011 |
| May 22, 2025 | P00005 | $0 | MODIFICATION FOR EO COMPLIANCE - ICC BUILDING |
| May 20, 2025 | A00005 | $220.1K | CD-CONSTRUCT GBSD INTEGRATED COMMAND CENTER BUILDING, FE WARREN AFB, WY R00017 CTI LOG ROLL UP MOD #5: 0031-0033, 0036, 0038-0042, & 0050-0054 |
| Mar 28, 2025 | P00004 | $732.0K | EXERCISING OPTION CLIN 0010 |
| Feb 28, 2025 | A00004 | $82.6K | CD-CONSTRUCT GBSD INTEGRATED COMMAND CENTER BUILDING, FE WARREN AFB, WY R00013 CTI LOG ROLL UP MOD #4: 00025-00027 & 00029 |
| Jan 29, 2025 | A00003 | $80.5K | CD-CONSTRUCT GBSD INTEGRATED COMMAND CENTER BUILDING, FE WARREN AFB, WY R00012 CTI LOG ROLL-UP MOD #3, ITEMS 22-24 |
| Dec 16, 2024 | A00002 | $173.4K | CD - CONSTRUCT GBSD INTEGRATED COMMAND CENTER BLDG., FE WARREN AFB, WY R00009 CTI LOG ROLL-UP MOD #2 |
| Nov 27, 2024 | P00003 | $16.0M | INCREMENT #2 FUNDING. |
| Oct 30, 2024 | A00001 | $120.2K | CD - CONSTRUCT GBSD INTEGRATED COMMAND CENTER BLDG, FE WARREN AFB, WY R00006 CTI LOG ROLL-UP MOD #1 |
| Oct 11, 2024 | P00002 | $281.2K | CD - CONSTRUCT GBSD INTEGRATED COMMAND CENTER BLDG, FE WARREN AFB, WY R00004 TELECOM DIRECT BORING |
| Aug 6, 2024 | P00001 | $2.4M | GBSD ICC AT FEW: EXERCISE OPTION CLIN 0014 |
| Jan 25, 2024 | 0 | $79.3M | CONSTRUCTION OF GBSD INTEGRATED COMMAND CENTER, F. E. WARREN AFB |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
80/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 80/100. Available recorded signals: 75 points.
- Contract end 2026-11-28 (34 days from calculation)
- +35 points
- 31 historical awards in this buyer and category group
- +15 points
- 32 recorded award transactions
- +10 points
- Latest award action: 2026-05-27
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.