Federal contract award

W9128F24C0013

CONSTRUCT B-21 PHASE MAINTENANCE HANGAR AT ELLSWORTH AFB

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW071 ENDIST OMAHA
NAICS236220 — Commercial and Institutional Building Construction
PSCY1BZ — CONSTRUCTION OF OTHER AIRFIELD STRUCTURES
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$141.8M
Current contract value$281.4M
Potential contract value / ceiling$281.4M
Start dateMay 23, 2024
Current end dateJul 26, 2027
Potential end dateJul 26, 2027
Latest award activityJun 11, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 22 of 22 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 11, 2026P00005$0PHASE MAINTENANCE HANGER EXERCISE OPTION CLIN 0007 - PRECONDITIONED AIR UNITS. ENTIRE WORK COMPLETE FOR PROCUREMENT, INSTALLATION, COMMISSIONING, AND CYBERSECURITY OF PRECONDITIONED AIR UNITS.
Apr 17, 2026A00016$348.6KPHASE MAINTENANCE HANGER EXERCISE OPTION CLIN 0007 - PRECONDITIONED AIR UNITS. ENTIRE WORK COMPLETE FOR PROCUREMENT, INSTALLATION, COMMISSIONING, AND CYBERSECURITY OF PRECONDITIONED AIR UNITS.
Mar 18, 2026P00004$674.5KPHASE MAINTENANCE HANGER EXERCISE OPTION CLIN 0007 - PRECONDITIONED AIR UNITS. ENTIRE WORK COMPLETE FOR PROCUREMENT, INSTALLATION, COMMISSIONING, AND CYBERSECURITY OF PRECONDITIONED AIR UNITS.
Mar 6, 2026A00015$207.3KPROJECT INCLUDES 73K SF, PHASE MAINTENANCE HANGAR (PHASE HANGAR) WITH A 2 AIRCRAFT SERVICING BAYS, ALL ASSOCIATED BACK SHOP, ADMIN., FACILITY SUPPORT SPACES, AND AIRFIELD APRON. THIS PROJECT WILL INCLUDE SPACES CONSTRUCTED TO ICD/ICS 705 STANDARDS.
Feb 9, 2026A00014$7.8KPROJECT INCLUDES 73K SF, PHASE MAINTENANCE HANGAR (PHASE HANGAR) WITH A 2 AIRCRAFT SERVICING BAYS, ALL ASSOCIATED BACK SHOP, ADMIN., FACILITY SUPPORT SPACES, AND AIRFIELD APRON. THIS PROJECT WILL INCLUDE SPACES CONSTRUCTED TO ICD/ICS 705 STANDARDS.
Nov 6, 2025A00013$27.0KCD: B-21 PHASE MAINTENANCE HANGER {EAFB} - R00019 REROUTE UNDERDRAIN UD54
Oct 24, 2025A00012$182.1KCD: B-21 PHASE MAINTENANCE HANGER {EAFB} - R00016 OPEN CUT ROAD CROSSING
Oct 9, 2025A00011$499.7KCD B-21 PHASE HANGAR - R00013 REROUTE COMM DUCTBANK & EXISTING UTILITIES
Sep 9, 2025A00010$96.6KCD: B-21 PHASE MAINTENANCE HANGER {EAFB} - R00017 (R00015 REPAIR JET FUEL LINE AND R00017 LOWER WATER LINE)
Sep 3, 2025A00009$0CD: B-21 PHASE MAINTENANCE HANGER {EAFB} - R00018 WEATHER DELAY THROUGH JULY 2025
Aug 12, 2025A00008$36.3KCD: B-21 PHASE MAINTENANCE HANGER {EAFB} - R00012 (R/7) REVISED PHASING & (R/12) JP PIPE ACM
Jul 22, 2025P00003$1.0MCONSTRUCT B-21 PHASE HANGAR/ EXERCISE OPTION CLIN 0009
Jun 25, 2025A00007$184.3KCD: B-21 PHASE MAINTENANCE HANGER {EAFB} - R00010 TAXIWAY ALPHA ELECTRICAL AND CONCRETE
Jun 13, 2025A00006$188.0KCD: B-21 PHASE MAINTENANCE HANGER {EAFB} - R00011 ADD TRIPLE WIDE PIO TRAILER
May 20, 2025A00005$118.0KCD: B-21 PHASE MAINTENANCE HANGER {EAFB} - R00008 ADD 4 MANHOLES ON SSW, IW LINES
Mar 28, 2025A00004$201.4KCD: B-21 PHASE MAINTENANCE HANGER {EAFB} - R00001 EPS RE-SIZE UTILITY SHIFTS & CONTRACT DRAWING CORRECTIONS
Mar 24, 2025P00002$1.0MTHE PURPOSE OF THIS MODIFICATION IS TO EXERCISE LINE ITEMS 0008, 0010, 0011 IN THE AMOUNT OF $1,003,423.00. AND COMPLIANCE WITH CLASS DEVIATION 2025-O0003
Feb 21, 2025A00003$432.0KCD: B-21 PHASE MAINTENANCE HANGER {EAFB} - R00004 R/2 ADD UNIT HEATER AND R/4 ELEC RECEPTICLES FOR AGES
Jan 17, 2025A00002$57.2KCD: B-21 PHASE MAINTENANCE HANGER {EAFB} - R00005 UTILITY LOCATE SERVICES
Dec 9, 2024A00001$0CD: B-21 PHASE MAINTENANCE HANGER {EAFB} - R00003 CHANGED SITE CONDITIONS
Sep 30, 2024P00001$0CONSTRUCT B-21 PHASE HANGAR - PAYMENT OFFICE UPDATE
May 23, 20240$135.5MCONSTRUCT B-21 PHASE MAINTENANCE HANGAR AT ELLSWORTH AFB

Estimated positioning window

Oct 25, 2026 – Jan 26, 2027

Recompete signal:
80/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 80/100. Available recorded signals: 75 points.

Contract end 2027-07-26 (274 days from calculation)
+35 points
13 historical awards in this buyer and category group
+15 points
22 recorded award transactions
+10 points
Latest award action: 2026-06-11
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.