Federal contract award
W9128F24C0014
CONSTRUCT B-21 FUEL SYSTEM MAINT. DOCK, CONSTRUCTION DESIGN-BUILD ELLSWORTH AFB, SD
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W071 ENDIST OMAHA |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Y1AZ — CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $67.6M |
| Current contract value | $134.6M |
| Potential contract value / ceiling | $135.6M |
| Start date | Apr 18, 2024 |
| Current end date | Dec 7, 2026 |
| Potential end date | Dec 7, 2026 |
| Latest award activity | May 18, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 25 of 25 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 18, 2026 | A00020 | $35.3K | CONSTRUCT A SINGLE-BAY FUEL SYSTEM MAINTENANCE DOCK (HANGAR). PROJECT INCLUDES A NEW, APPROXIMATELY 39,000 SF, FUELS MAINTENANCE FACILITY WITH A SINGLE AIRCRAFT MEASUREMENT BAY AND ALL ASSOCIATED BACK SHOP, ADMINISTRATIVE AND FACILITY SUPPORT SPACES. |
| May 12, 2026 | A00019 | $43.4K | CONSTRUCT A SINGLE-BAY FUEL SYSTEM MAINTENANCE DOCK (HANGAR). PROJECT INCLUDES A NEW, APPROXIMATELY 39,000 SF, FUELS MAINTENANCE FACILITY WITH A SINGLE AIRCRAFT MEASUREMENT BAY AND ALL ASSOCIATED BACK SHOP, ADMINISTRATIVE AND FACILITY SUPPORT SPACES. |
| Apr 30, 2026 | A00018 | $33.7K | CONSTRUCT A SINGLE-BAY FUEL SYSTEM MAINTENANCE DOCK (HANGAR). PROJECT INCLUDES A NEW, APPROXIMATELY 39,000 SF, FUELS MAINTENANCE FACILITY WITH A SINGLE AIRCRAFT MEASUREMENT BAY AND ALL ASSOCIATED BACK SHOP, ADMINISTRATIVE AND FACILITY SUPPORT SPACES. |
| Apr 17, 2026 | A00017 | $226.3K | CONSTRUCT A SINGLE-BAY FUEL SYSTEM MAINTENANCE DOCK (HANGAR). PROJECT INCLUDES A NEW, APPROXIMATELY 39,000 SF, FUELS MAINTENANCE FACILITY WITH A SINGLE AIRCRAFT MEASUREMENT BAY AND ALL ASSOCIATED BACK SHOP, ADMINISTRATIVE AND FACILITY SUPPORT SPACES. |
| Apr 6, 2026 | A00016 | $33.3K | CONSTRUCT A SINGLE-BAY FUEL SYSTEM MAINTENANCE DOCK (HANGAR). PROJECT INCLUDES A NEW, APPROXIMATELY 39,000 SF, FUELS MAINTENANCE FACILITY WITH A SINGLE AIRCRAFT MEASUREMENT BAY AND ALL ASSOCIATED BACK SHOP, ADMINISTRATIVE AND FACILITY SUPPORT SPACES. |
| Feb 13, 2026 | P00004 | $0 | CONSTRUCT A SINGLE-BAY FUEL SYSTEM MAINTENANCE DOCK (HANGAR). PROJECT INCLUDES A NEW, APPROXIMATELY 39,000 SF, FUELS MAINTENANCE FACILITY WITH A SINGLE AIRCRAFT MEASUREMENT BAY AND ALL ASSOCIATED BACK SHOP, ADMINISTRATIVE AND FACILITY SUPPORT SPACES. |
| Feb 9, 2026 | A00015 | $13.8K | CONSTRUCT A SINGLE-BAY FUEL SYSTEM MAINTENANCE DOCK (HANGAR). PROJECT INCLUDES A NEW, APPROXIMATELY 39,000 SF, FUELS MAINTENANCE FACILITY WITH A SINGLE AIRCRAFT MEASUREMENT BAY AND ALL ASSOCIATED BACK SHOP, ADMINISTRATIVE AND FACILITY SUPPORT SPACES. |
| Dec 30, 2025 | A00014 | $199.5K | CONSTRUCT A SINGLE-BAY FUEL SYSTEM MAINTENANCE DOCK (HANGAR). PROJECT INCLUDES A NEW, APPROXIMATELY 39,000 SF, FUELS MAINTENANCE FACILITY WITH A SINGLE AIRCRAFT MEASUREMENT BAY AND ALL ASSOCIATED BACK SHOP, ADMINISTRATIVE AND FACILITY SUPPORT SPACES. |
| Nov 13, 2025 | A00013 | $400.0K | CD: B-21 FUEL SYSTEMS MAINTENANCE DOCK-80 EAFB R10023 REVISE MEDIUM VOLTAGE CIRCUITS 7 & 7S PT-1 (NTE) |
| Oct 14, 2025 | A00012 | $-31.9K | CD: B-21 FUEL SYSTEMS MAINTENANCE DOCK-80 EAFB R00028 [R/22 REVISE DOOR HDWE 107A DELETE CCTV R-I R/28 POWER CIRCUIT FOR MONORAIL HOIST] |
| Aug 14, 2025 | A00011 | $179.3K | CD: B-21 FUEL SYSTEMS MAINTENANCE DOCK-80 EAFB R00026 - E-STOP DELAY |
| Aug 12, 2025 | A00010 | $52.7K | CD: B-21 FUEL SYSTEMS MAINTENANCE DOCK-80 EAFB R00024 PERMANENT E-STOP & 90 ROW LIGHT CIRCUIT |
| Jul 16, 2025 | P00003 | $1.2M | CONSTRUCT B-21 FUEL SYSTEM MAINT. DOCK |
| Apr 29, 2025 | A00009 | $6.7K | CD: B-21 FUEL SYSTEMS MAINTENANCE DOCK-80 EAFB R00021 (R/17 WORK CLEARANCE REQUEST-UTILITY LOCATING AND R/21 REVISE EF 10, 11 & 12 |
| Apr 10, 2025 | A00008 | $130.5K | CD: B-21 FUEL SYSTEMS MAINTENANCE DOCK-80 EAFB R00019 REPLACE EXST 14" FIRE WATER MAIN & PIV |
| Mar 18, 2025 | P00002 | $1.1M | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE LINE ITEMS 0007, 0008, AND 0010 IN THE AMOUNT OF $1,106,900.00. AND IMPLEMENT CLASS DEVIATION 2025-O0003 RESTORING MERIT-BASED OPPORTUNITY IN FEDERAL CONTRACTS. |
| Feb 25, 2025 | A00007 | $9.4K | CD: B-21 FUEL SYSTEMS MAINTENANCE DOCK-80 EAFB R00015 DEMOLISH ABANDONED UTILITIES |
| Jan 23, 2025 | A00006 | $66.9K | CD: B-21 FUEL SYSTEMS MAINTENANCE DOCK-80 EAFB R00016 DUCT BANK SPARE CONDUIT |
| Jan 13, 2025 | A00005 | $11.4K | CD: B-21 FUEL SYSTEMS MAINTENANCE DOCK-80 EAFB R00014 - ASBESTOS MAIN HANGAR DOOR GASKETS |
| Dec 9, 2024 | A00004 | $112.9K | CD: B-21 FUEL SYSTEMS MAINTENANCE DOCK-80 EAFB R00010 - R00006 REVISE AGE ELECTRICAL RECEPTACLES & R00010 ELIMINATE WATER LINE DEAD ENDS |
| Nov 22, 2024 | A00003 | $112.1K | CD: B-21 FUEL SYSTEMS MAINTENANCE DOCK-80 EAFB R00012 - R00008 CONCRETE SLAB REVISIONS, R00011 REVISE RIGID INSULATION REQUIREMENT, AND R00012 TEMP POWER 90 ROW RAMP LIGHTS |
| Sep 10, 2024 | A00002 | $-39.2K | CD: B-21 FUEL SYSTEMS MAINTENANCE DOCK-80 EAFB R00003 - R00003 TEXTUAL SIGNS & R00004 PARTITION SLEEVE |
| Aug 27, 2024 | P00001 | $573.0K | EXERCISE OPTION CLIN 0016 FOR TRAILER RENTAL FOR CONSTRUCT B-21 FUEL SYSTEM MAINT. DOCK |
| Aug 21, 2024 | A00001 | $4.5K | CD: B-21 FUEL SYSTEMS MAINTENANCE DOCK-80 EAFB R00005 - R00001 REVISE MECH RM R00002 DEMO 2" W-LINE AND R00005 WATER PIPING PRESSURE CLASS |
| Apr 18, 2024 | 0 | $63.1M | CONSTRUCT B-21 FUEL SYSTEM MAINT. DOCK, CONSTRUCTION DESIGN-BUILD ELLSWORTH AFB, SD |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
80/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 80/100. Available recorded signals: 75 points.
- Contract end 2026-12-07 (43 days from calculation)
- +35 points
- 7 historical awards in this buyer and category group
- +15 points
- 25 recorded award transactions
- +10 points
- Latest award action: 2026-05-18
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.