Federal contract award

W9128F24C0014

CONSTRUCT B-21 FUEL SYSTEM MAINT. DOCK, CONSTRUCTION DESIGN-BUILD ELLSWORTH AFB, SD

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW071 ENDIST OMAHA
NAICS236220 — Commercial and Institutional Building Construction
PSCY1AZ — CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$67.6M
Current contract value$134.6M
Potential contract value / ceiling$135.6M
Start dateApr 18, 2024
Current end dateDec 7, 2026
Potential end dateDec 7, 2026
Latest award activityMay 18, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 25 of 25 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 18, 2026A00020$35.3KCONSTRUCT A SINGLE-BAY FUEL SYSTEM MAINTENANCE DOCK (HANGAR). PROJECT INCLUDES A NEW, APPROXIMATELY 39,000 SF, FUELS MAINTENANCE FACILITY WITH A SINGLE AIRCRAFT MEASUREMENT BAY AND ALL ASSOCIATED BACK SHOP, ADMINISTRATIVE AND FACILITY SUPPORT SPACES.
May 12, 2026A00019$43.4KCONSTRUCT A SINGLE-BAY FUEL SYSTEM MAINTENANCE DOCK (HANGAR). PROJECT INCLUDES A NEW, APPROXIMATELY 39,000 SF, FUELS MAINTENANCE FACILITY WITH A SINGLE AIRCRAFT MEASUREMENT BAY AND ALL ASSOCIATED BACK SHOP, ADMINISTRATIVE AND FACILITY SUPPORT SPACES.
Apr 30, 2026A00018$33.7KCONSTRUCT A SINGLE-BAY FUEL SYSTEM MAINTENANCE DOCK (HANGAR). PROJECT INCLUDES A NEW, APPROXIMATELY 39,000 SF, FUELS MAINTENANCE FACILITY WITH A SINGLE AIRCRAFT MEASUREMENT BAY AND ALL ASSOCIATED BACK SHOP, ADMINISTRATIVE AND FACILITY SUPPORT SPACES.
Apr 17, 2026A00017$226.3KCONSTRUCT A SINGLE-BAY FUEL SYSTEM MAINTENANCE DOCK (HANGAR). PROJECT INCLUDES A NEW, APPROXIMATELY 39,000 SF, FUELS MAINTENANCE FACILITY WITH A SINGLE AIRCRAFT MEASUREMENT BAY AND ALL ASSOCIATED BACK SHOP, ADMINISTRATIVE AND FACILITY SUPPORT SPACES.
Apr 6, 2026A00016$33.3KCONSTRUCT A SINGLE-BAY FUEL SYSTEM MAINTENANCE DOCK (HANGAR). PROJECT INCLUDES A NEW, APPROXIMATELY 39,000 SF, FUELS MAINTENANCE FACILITY WITH A SINGLE AIRCRAFT MEASUREMENT BAY AND ALL ASSOCIATED BACK SHOP, ADMINISTRATIVE AND FACILITY SUPPORT SPACES.
Feb 13, 2026P00004$0CONSTRUCT A SINGLE-BAY FUEL SYSTEM MAINTENANCE DOCK (HANGAR). PROJECT INCLUDES A NEW, APPROXIMATELY 39,000 SF, FUELS MAINTENANCE FACILITY WITH A SINGLE AIRCRAFT MEASUREMENT BAY AND ALL ASSOCIATED BACK SHOP, ADMINISTRATIVE AND FACILITY SUPPORT SPACES.
Feb 9, 2026A00015$13.8KCONSTRUCT A SINGLE-BAY FUEL SYSTEM MAINTENANCE DOCK (HANGAR). PROJECT INCLUDES A NEW, APPROXIMATELY 39,000 SF, FUELS MAINTENANCE FACILITY WITH A SINGLE AIRCRAFT MEASUREMENT BAY AND ALL ASSOCIATED BACK SHOP, ADMINISTRATIVE AND FACILITY SUPPORT SPACES.
Dec 30, 2025A00014$199.5KCONSTRUCT A SINGLE-BAY FUEL SYSTEM MAINTENANCE DOCK (HANGAR). PROJECT INCLUDES A NEW, APPROXIMATELY 39,000 SF, FUELS MAINTENANCE FACILITY WITH A SINGLE AIRCRAFT MEASUREMENT BAY AND ALL ASSOCIATED BACK SHOP, ADMINISTRATIVE AND FACILITY SUPPORT SPACES.
Nov 13, 2025A00013$400.0KCD: B-21 FUEL SYSTEMS MAINTENANCE DOCK-80 EAFB R10023 REVISE MEDIUM VOLTAGE CIRCUITS 7 & 7S PT-1 (NTE)
Oct 14, 2025A00012$-31.9KCD: B-21 FUEL SYSTEMS MAINTENANCE DOCK-80 EAFB R00028 [R/22 REVISE DOOR HDWE 107A DELETE CCTV R-I R/28 POWER CIRCUIT FOR MONORAIL HOIST]
Aug 14, 2025A00011$179.3KCD: B-21 FUEL SYSTEMS MAINTENANCE DOCK-80 EAFB R00026 - E-STOP DELAY
Aug 12, 2025A00010$52.7KCD: B-21 FUEL SYSTEMS MAINTENANCE DOCK-80 EAFB R00024 PERMANENT E-STOP & 90 ROW LIGHT CIRCUIT
Jul 16, 2025P00003$1.2MCONSTRUCT B-21 FUEL SYSTEM MAINT. DOCK
Apr 29, 2025A00009$6.7KCD: B-21 FUEL SYSTEMS MAINTENANCE DOCK-80 EAFB R00021 (R/17 WORK CLEARANCE REQUEST-UTILITY LOCATING AND R/21 REVISE EF 10, 11 & 12
Apr 10, 2025A00008$130.5KCD: B-21 FUEL SYSTEMS MAINTENANCE DOCK-80 EAFB R00019 REPLACE EXST 14" FIRE WATER MAIN & PIV
Mar 18, 2025P00002$1.1MTHE PURPOSE OF THIS MODIFICATION IS TO EXERCISE LINE ITEMS 0007, 0008, AND 0010 IN THE AMOUNT OF $1,106,900.00. AND IMPLEMENT CLASS DEVIATION 2025-O0003 RESTORING MERIT-BASED OPPORTUNITY IN FEDERAL CONTRACTS.
Feb 25, 2025A00007$9.4KCD: B-21 FUEL SYSTEMS MAINTENANCE DOCK-80 EAFB R00015 DEMOLISH ABANDONED UTILITIES
Jan 23, 2025A00006$66.9KCD: B-21 FUEL SYSTEMS MAINTENANCE DOCK-80 EAFB R00016 DUCT BANK SPARE CONDUIT
Jan 13, 2025A00005$11.4KCD: B-21 FUEL SYSTEMS MAINTENANCE DOCK-80 EAFB R00014 - ASBESTOS MAIN HANGAR DOOR GASKETS
Dec 9, 2024A00004$112.9KCD: B-21 FUEL SYSTEMS MAINTENANCE DOCK-80 EAFB R00010 - R00006 REVISE AGE ELECTRICAL RECEPTACLES & R00010 ELIMINATE WATER LINE DEAD ENDS
Nov 22, 2024A00003$112.1KCD: B-21 FUEL SYSTEMS MAINTENANCE DOCK-80 EAFB R00012 - R00008 CONCRETE SLAB REVISIONS, R00011 REVISE RIGID INSULATION REQUIREMENT, AND R00012 TEMP POWER 90 ROW RAMP LIGHTS
Sep 10, 2024A00002$-39.2KCD: B-21 FUEL SYSTEMS MAINTENANCE DOCK-80 EAFB R00003 - R00003 TEXTUAL SIGNS & R00004 PARTITION SLEEVE
Aug 27, 2024P00001$573.0KEXERCISE OPTION CLIN 0016 FOR TRAILER RENTAL FOR CONSTRUCT B-21 FUEL SYSTEM MAINT. DOCK
Aug 21, 2024A00001$4.5KCD: B-21 FUEL SYSTEMS MAINTENANCE DOCK-80 EAFB R00005 - R00001 REVISE MECH RM R00002 DEMO 2" W-LINE AND R00005 WATER PIPING PRESSURE CLASS
Apr 18, 20240$63.1MCONSTRUCT B-21 FUEL SYSTEM MAINT. DOCK, CONSTRUCTION DESIGN-BUILD ELLSWORTH AFB, SD

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
80/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 80/100. Available recorded signals: 75 points.

Contract end 2026-12-07 (43 days from calculation)
+35 points
7 historical awards in this buyer and category group
+15 points
25 recorded award transactions
+10 points
Latest award action: 2026-05-18
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.