Federal contract award

W9128F24C0034

CONSTRUCTION OF THE B-21 RENOVATE DOCK81, CONSTRUCTION DESIGN-BID-BUILD, ELLSWORTH AFB, SD

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW071 ENDIST OMAHA
NAICS236220 — Commercial and Institutional Building Construction
PSCY1JZ — CONSTRUCTION OF MISCELLANEOUS BUILDINGS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$34.5M
Current contract value$68.5M
Potential contract value / ceiling$68.5M
Start dateSep 27, 2024
Current end dateNov 22, 2026
Potential end dateNov 22, 2026
Latest award activityMay 29, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 12 of 12 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 9, 2026A00005$120.6KRENOVATE DOCK 81 TO SECURE ALT FUEL DOCK.
May 29, 2026A00004$188.8KRENOVATE DOCK 81 TO SECURE ALT FUEL DOCK.
Apr 9, 2026A00003$119.6KRENOVATE DOCK 81 TO SECURE ALT FUEL DOCK.
Jan 16, 2026P00006$0CORRECT MOD P00003 _ B-21 RENOVATE DOC 81, ELLSWORTH AFB ADMID MOD TO CORRECT P00003 PAYMENT TERMS TO 14 DAYS
Dec 3, 2025P00004$0CONSTRUCTION OF THE B-21 RENOVATE DOCK81 - MODIFICATION TO CORRECT PICTURES FOR CONTRACT TO TRANSITION CORRECTLY FROM PDS/PD2 TO ACWS.
Dec 3, 2025P00005$0CONSTRUCTION OF THE B-21 RENOVATE DOCK81
Sep 16, 2025A00002$203.3KCD: B-21 RENOVATE DOCK 81 (ALT FUEL DOCK) {EAFB} - R00004 (R00002 MISC COMBINED CHANGES AND R00004 RM A108 SEWER LINE CONNECTIONS)
Jul 22, 2025A00001$0CD: B-21 RENOVATE DOCK 81 (ALT FUEL DOCK) {EAFB} - R00007-1 DRY PIPE FIRE PROTECTION MODIFICATIONS (NTE) PART-1
Jul 15, 2025P00003$1.8MCONSTRUCTION OF THE B-21 RENOVATE DOCK81/EXERCISE OPTIONS CLIN 0009,0010 AND 0012.
May 31, 2025P00002$0CONSTRUCTION OF THE B-21 RENOVATE DOCK81
Mar 5, 2025P00001$318.0KTHE PURPOSE OF THIS MODIFICATION IS TO EXERCISE LINE ITEMS 0008, 0011, AND 0013.
Sep 26, 20240$31.7MCONSTRUCTION OF THE B-21 RENOVATE DOCK81, CONSTRUCTION DESIGN-BID-BUILD, ELLSWORTH AFB, SD

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
80/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 80/100. Available recorded signals: 75 points.

Contract end 2026-11-22 (28 days from calculation)
+35 points
31 historical awards in this buyer and category group
+15 points
12 recorded award transactions
+10 points
Latest award action: 2026-05-29
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.