Federal contract award

W9128F25C0009

ST VRAIN CREEK FRRP - LONGMONT CO

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW071 ENDIST OMAHA
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCZ2PC — REPAIR OR ALTERATION OF UNIMPROVED REAL PROPERTY (LAND)
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$13.0M
Current contract value$13.0M
Potential contract value / ceiling$13.1M
Start dateJan 31, 2025
Current end dateAug 13, 2026
Potential end dateAug 13, 2026
Latest award activityMay 28, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 15 of 15 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 28, 2026A00010$-7.2KR00014: A PARTIAL CREDIT OF CONCRETE MATERIAL COST FOR PUMPHOUSE SLAB AND STOOP. R00015: A CREDIT FOR LEAVING THE EXISTING GATE, LOCATED WEST OF THE SUNSET ST. BRIDGE, AS CURRENTLY CONSTRUCTED.
May 14, 2026P00004$206.6KTO OVER EXCAVATE CONTAMINATED SOIL, AND BACKFILL OVER EXCAVATED AREAS WITH IMPERVIOUS FILL BACK UP TO FINISHED GRADE. WORK TO CONDUCT A FEW SAMPLE TESTS OF SURROUNDING AREAS TO DETERMINE A BASELINE, NORMAL CONDITIONS FOR THE AREA OF THE CREEK BANK.
Feb 14, 2026A00009$341.2KTO OVER EXCAVATE CONTAMINATED SOIL, AND BACKFILL OVER EXCAVATED AREAS WITH IMPERVIOUS FILL BACK UP TO FINISHED GRADE. WORK TO CONDUCT A FEW SAMPLE TESTS OF SURROUNDING AREAS TO DETERMINE A BASELINE, NORMAL CONDITIONS FOR THE AREA OF THE CREEK BANK.
Feb 2, 2026A00008$12.4KTHIS MODIFICATION ADDS A STEP-DOWN TRANSFORMER AT THE CLUBHOUSE, REPLACES THE EXISTING METER AND DISCONNECT, AND ADDS A NEW METER AND DISCONNECT AT THE PUMPHOUSE TO ALLOW A SINGLE DISTRIBUTION TRANSFORMER WHILE KEEPING POWER BILLING SEPARATE.
Oct 14, 2025A00007$74.8KCD - ST VRAIN CREEK FLOOD RISK REDUCTION PROJECT, LONGMONT, CO R00009 AERATION SYSTEM AND R00010 OUTFALL 4 SUBGRADE
Sep 19, 2025A00006$220.5KCD - ST VRAIN CREEK FLOOD RICK REDUCTION PROJECT R00008 BLACK DIRT EXCAVATE/HAUL OFF
Aug 4, 2025A00005$43.4KCD - ST VRAIN CREEK FLOOD RISK REDUCTION PROJECT, LONGMONT, CO R00004 BURIED SLAB REMOVAL AND R00007 SOIL BIN
Jul 24, 2025A00004$7.2KCD - ST VRAIN CREEK FLOOD RISK REDUCTION PROJECT, LONGMONT, CO R00005 BLACK DIRT ENCOUNTERED
Jul 23, 2025A00003$477CD - ST VRAIN CREEK FLOOD RISK REDUCTION PROJECT, LONGMONT, CO R10002 A00002 R00002 ADDITIONAL TREE REMOVAL CORRECTION
Jul 1, 2025A00002$27.8KCD - ST VRAIN CREEK FLOOD RISK REDUCTION PROJECT, LONGMONT, CO R00002 ADDITIONAL TREE REMOVAL
May 22, 2025P00003$0MODIFICATION FOR EO COMPLIANCE - ST VRAIN CREEK FRRP
May 14, 2025A00001$36.0KCD - ST VRAIN CREEK FLOOD RISK REDUCTION PROJECT, LONGMONT, CO R00001 SHEETPILING QUANTITY
May 13, 2025P00002$60.0KST VRAIN CREEK OPTION 1
Jan 17, 2025P00001$0ADMIN MOD FOR ST VRAIN CREEK FRRP - LONGMONT CO
Jan 10, 20250$12.0MST VRAIN CREEK FRRP - LONGMONT CO

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.