Federal contract award
W912CH25C0043
R-DEX, ALONG WITH TENNLAB, PROPOSES THE DEVELOPMENT OF ULTRAFAST NEUROMORPHIC ALGORITHMS FOR DRONE DETECTION. THE TEAM AIMS TO INTEGRATE ULTRA-FAST SPIKING NEURAL NETWORKS INTO NEUROMORPHIC HARDWARE TO ACHIEVE LOWPOWER, HIGH-SPEED DRONE DETECTION.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W6QK ACC- DTA |
| NAICS | 541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) |
| PSC | AC11 — NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; BASIC RESEARCH |
| Parent award / vehicle | Not reported |
| Set-aside | SMALL BUSINESS SET ASIDE - TOTAL |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $204.0K |
| Current contract value | $204.0K |
| Potential contract value / ceiling | $204.0K |
| Start date | Apr 14, 2025 |
| Current end date | Jan 14, 2026 |
| Potential end date | Jan 14, 2026 |
| Latest award activity | Apr 14, 2025 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 2 of 2 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Apr 14, 2025 | 0 | $204.0K | R-DEX, ALONG WITH TENNLAB, PROPOSES THE DEVELOPMENT OF ULTRAFAST NEUROMORPHIC ALGORITHMS FOR DRONE DETECTION. THE TEAM AIMS TO INTEGRATE ULTRA-FAST SPIKING NEURAL NETWORKS INTO NEUROMORPHIC HARDWARE TO ACHIEVE LOWPOWER, HIGH-SPEED DRONE DETECTION. |
| Apr 14, 2025 | 0 | $204.0K | R-DEX, ALONG WITH TENNLAB, PROPOSES THE DEVELOPMENT OF ULTRAFAST NEUROMORPHIC ALGORITHMS FOR DRONE DETECTION. THE TEAM AIMS TO INTEGRATE ULTRA-FAST SPIKING NEURAL NETWORKS INTO NEUROMORPHIC HARDWARE TO ACHIEVE LOWPOWER, HIGH-SPEED DRONE DETECTION. |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.