Federal contract award
W912DQ19C4011
DESIGN BUILD CONSTRUCTION OF FACILITIES FORT LEONARD WOOD HOSPITAL REPLACEMENT
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W071 ENDIST KANSAS CITY |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Y1DA — CONSTRUCTION OF HOSPITALS AND INFIRMARIES |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $320.0M |
| Current contract value | $320.4M |
| Potential contract value / ceiling | $320.4M |
| Start date | Aug 8, 2019 |
| Current end date | Jul 13, 2026 |
| Potential end date | Jul 13, 2026 |
| Latest award activity | Apr 23, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 153 of 153 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Apr 23, 2026 | A00119 | $296.0K | MODIFICATION FOR STORMWATER AND CONTAMINATED DW MAIN TO 091884 - HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI REFERENCE NO. R00148 |
| Apr 8, 2026 | A00118 | $218.4K | NEBRASKA AVE, AMBULANCE POWER, FUEL AND OX CONTRACT FOR 091884 - HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURIREFERENCE NO. R00147 |
| Sep 19, 2025 | A00117 | $199.9K | MODIFICATION TO CONTRACT HOSPITAL REPLACEMENT AT FORT LEONARD WOOD, MISSOURI FOR R00146 CANOPY & CLINIC SIGNAGE, IPBH DEVICES - SH171, SH178, AND SH179. |
| Jun 27, 2025 | A00116 | $-28.5K | MODIFICATION TO CONTRACT HOSPITAL REPLACEMENT AT FORT LEONARD WOOD, MISSOURI FOR R00145 - SH168+SH170+SH176 - HELIPAD MARKINGS, KITCHEN TILE, NEB. CURB |
| May 15, 2025 | A00115 | $0 | CONTRACT FOR 091884 - HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI REFERENCE NO. R00144 - WEATHER TIME EXTENSION JUL 22 - MAR 25 |
| May 1, 2025 | A00114 | $272.4K | MODIFICATION TO CONTRACT HOSPITAL REPLACEMENT AT FORT LEONARD WOOD, MISSOURI FOR R00143 SH165 IA AND SH166 KITCHEN SINK |
| Nov 14, 2024 | A00113 | $210.4K | MODIFICATION TO CONTRACT FOR 091884 - HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI FOR R00124 - TRAINING VIDEO, BCS REA, RX VAULT |
| Sep 30, 2024 | P00037 | $702.4K | FLWRH - BHSAA |
| Sep 25, 2024 | P00036 | $4.2M | CONSTRUCTION OF FACILITIES - MODIFICATION TO ADD REMAINING FY18, FY20 AND FY21 INCREMENTAL FUNDING |
| Sep 3, 2024 | P00035 | $129.3K | MODIFICATION TO CONTRACT HOSPITAL REPLACEMENT AT FORT LEONARD WOOD, MISSOURI FOR R00140 SH161 IOR WARRANTY |
| Aug 22, 2024 | A00112 | $381.8K | MODIFICATION TO CONTRACT FOR 091884 - HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FORT LEONARD WOOD, MISSOURI FOR REFERENCE NO. R00139 SH154 BAS OUTBUILDING SUPPLEMENT AND SH162 BLACKOUT SHADES |
| Jul 12, 2024 | A00111 | $-185.1K | MODIFICATION TO CONTRACT FOR 091884 - HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI FOR REFERENCE NO. R00135 CLIN 0008 REDUCTION |
| Jul 11, 2024 | P00032 | $361.9K | CONSTRUCTION OF FACILITIES - ADMIN MOD TO CORRECT ACO MOD A00094 PART 2 |
| Jul 11, 2024 | P00033 | $0 | ADMIN MOD PART 2 OF 3 (FOLLOWING P00032) |
| Jul 11, 2024 | P00034 | $0 | CONSTRUCTION OF FACILITIES- ADMIN MOD TO CORRECT ACO MOD A0094 PART 3OF3 (FOLLOWS P00033) |
| Jun 5, 2024 | A00110 | $0 | MODIFICATION TO CONTRACT HOSPITAL REPLACEMENT AT FORT LEONARD WOOD, MISSOURI FOR R00138 SH157 1E35 WET WALL AND SH160 ADDED CIRCUITS FOR JACE DEVICES |
| Jun 4, 2024 | P00031 | $1.6M | CONSTRUCTION OF FACILITIES - IOR MOD |
| May 3, 2024 | A00109 | $0 | MODIFICATION TO CONTRACT FOR 091884 - HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI FOR REFERENCE NUMBER R00136 SH148 FA & MNS MICROPACKAGE |
| Apr 2, 2024 | A00108 | $430.1K | MODIFICATION TO CONTRACT FLW HOSPITAL REPLACEMENT FOR THE M4125 BASE STATIONS. |
| Mar 6, 2024 | A00107 | $0 | MODIFICATION TO CONTRACT HOSPITAL REPLACEMENT AT FORT LEONARD WOOD, MISSOURI FOR R00133 SH153 DAS BATTERIES AND SH145 R00066 CORRECTION |
| Feb 29, 2024 | A00106 | $0 | MODIFICATION TO CONTRACT 091884 - HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI FOR REFERENCE NO. R00132 SH156 SOCCER FIELD SPOILS PILE PERMANENT TURF |
| Feb 9, 2024 | A00105 | $0 | MODIFICATION TO CONTRACT FLWHR FOR RADIO PAGING INTERCONNECTION |
| Jan 31, 2024 | A00104 | $0 | MODIFICATION TO CONTRACT FOR 091884 - HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI FOR REFERENCE NO. R00128 CLINIC WALK OFF MAT |
| Jan 29, 2024 | A00103 | $0 | MODIFICATION TO CONTRACT HOSPTIAL REPLACEMENT FOR R00130 NEEDLE GAS VALVE |
| Jan 11, 2024 | P00030 | $0 | CONSTRUCTION OF FACILITIES. THE PURPOSE OF THIS MODIFICATION IS FOR BUY AMERICAN ACT EXCEPTION. |
| Dec 22, 2023 | A00102 | $0 | MODIFICATION TO CONTRACT HOSPITAL REPLACEMENT AT FORT LEONARD WOOD, MISSOURI FOR R00126 SH146 TEMP BMP PUMPING |
| Nov 15, 2023 | A00100 | $0 | MODIFICATION TO CONTRACT FLWHR FOR ED SINK CHANGE |
| Nov 15, 2023 | A00101 | $0 | CONSTRUCTION OF FACILITIES MODIFICATION TO CONTRACT FLW HOSPITAL REPLACEMENT FOR R00125 EXTERIOR SIGNAGE AND ADDED SIDEWALK |
| Sep 19, 2023 | P00029 | $0 | CONSTRUCTION OF FACILITIES - ADDING CLAUSE |
| Sep 11, 2023 | A00098 | $0 | MODIFICATION TO CONTRACT FLW HOSPITAL REPLACEMENT FOR R00123 ADDRESSABLE SYSTEMS LABELING. |
| Aug 17, 2023 | A00097 | $0 | MODIFICATION TO CONTRACT FORT LEONARD WOOD HOSPITAL REPLACEMENT FOR IMPROVED TEMP SITE ACCESS FOR 1ST DAY PARKING |
| Aug 16, 2023 | A00096 | $45.9K | MODIFICATION TO CONTRACT FORT LEONARD WOOD HOSPITAL REPLACEMENT CONTRACT FOR CLINS 10, 11 AND 12 ICT CHANGES |
| Jul 19, 2023 | A00095 | $0 | MODIFICATION TO CONTRACT HOSPITAL REPLACEMENT AT FORT LEONARD WOOD, MISSOURI FOR R00119 SH137 NEW SPECT CT |
| Jul 18, 2023 | A00094 | $-361.9K | MODIFICATION TO CONTRACT FOR 091884 - HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI FOR REFERENCE NO. R00120 SH129 SITE WORK CHANGES |
| Jun 6, 2023 | A00093 | $0 | MODIFICATION TO CONTRACT FOR 091884 - HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI. REFERENCE NO. R00117 SH138 NEBRASKA TURN LANE REA |
| Jun 5, 2023 | A00092 | $0 | MODIFICATION TO CONTRACT FOR 091884 - HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI. REFERENCE NO. R00118 SH134 BASE SINK CABINETS IN RMS 0G01 AND 0H41 |
| Jun 1, 2023 | A00091 | $0 | MODIFICATION TO CONTRACT FOR 091884 - HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI. REFERENCE NO. R00116 SH135 STORM SEWER REA AND SH136 DUCT BANK CONFLICT REA |
| Jun 1, 2023 | P00028 | $361.5K | CONSTRUCTION OF FACILITIES MOD TO INCREASE FUNDING TO CLIN 0013 FOR EQUIPMENT CHANGES |
| Apr 21, 2023 | A00090 | $322.3K | CONSTRUCTION OF FACILITIES |
| Apr 6, 2023 | A00089 | $203.5K | MODIFICATION TO CONTRACT HOSPITAL REPLACEMENT AT FORT LEONARD WOOD, MISSOURI FOR R00114 CLIN 5 DETECTORS |
| Mar 8, 2023 | A00088 | $0 | MODIFICATION TO CONTRACT HOSPITAL REPLACEMENT AT FORT LEONARD WOOD, MISSOURI FOR R00111 SH131 STRUCTURAL CODE CHANGES |
| Mar 1, 2023 | A00087 | $0 | CONSTRUCTION OF FACILITIES |
| Feb 22, 2023 | P00027 | $-257.8K | CONSTRUCTION OF FACILITIES - CLIN 0019 DEDUCT |
| Feb 10, 2023 | P00026 | $0 | CONSTRUCTION OF FACILITIES |
| Dec 27, 2022 | A00086 | $0 | MODIFICATION TO CONTRACT HOSPITAL REPLACEMENT AT FORT LEONARD WOOD, MISSOURI FOR R00109 SH117 OR DOOR'S PRIVACY FILM |
| Dec 22, 2022 | A00085 | $0 | MODIFICATION TO CONTRACT HOSPITAL REPLACEMENT AT FORT LEONARD WOOD, MISSOURI FOR R00108 SH071 MHS GENESIS |
| Dec 15, 2022 | A00084 | $4.6K | MODIFICATION TO CONTRACT HOSPITAL REPLACEMENT AT FORT LEONARD WOOD, MISSOURI FOR REFERENCE NO. R00106 SH107 MICROPACKAGE |
| Dec 1, 2022 | A00083 | $-186.0K | CONSTRUCTION OF FACILITIES |
| Nov 30, 2022 | A00082 | $0 | CONSTRUCTION OF FACILITIES |
| Nov 29, 2022 | A00081 | $0 | MODIFICATION TO CONTRACT FLW HOSPITAL REPLACEMENT AT FT. LEONARD WOOD, MISSOURI FOR SH097 R00095 SMALL CHANGES. |
| Nov 16, 2022 | A00080 | $0 | CONSTRUCTION OF FACILITIES |
| Nov 9, 2022 | A00079 | $0 | CONSTRUCTION OF FACILITIES |
| Nov 8, 2022 | P00025 | $0 | CONSTRUCTION OF FACILITIES |
| Oct 13, 2022 | A00078 | $0 | MODIFICATION TO CONTRACT FOR 091884 - HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI FOR REFERENCE NO. R00090 SH106 RUBBER FLOORING REMOVAL |
| Oct 11, 2022 | A00077 | $0 | CONSTRUCTION OF FACILITIES |
| Sep 30, 2022 | A00074 | $114.0K | MODIFICATION TO CONTRACT FLW HOSPITAL REPLACEMENT FOR ADDITIONAL KITCHEN AND SERVER EQUIPMENT |
| Sep 30, 2022 | A00075 | $59.6K | MODIFICATION TO CONTRACT FLW HOSPITAL REPLACEMENT FOR REFERENCE NO. R00101 SH113 RECONCILIATION OF CLIN 14 LOCKERS |
| Sep 30, 2022 | A00076 | $102.7K | MODIFICATION TO CONTRACT W912DQ19C4011 FLW HOSPITAL REPLACEMENT FOR R00102 MRI VASCULAR SOFTWARE |
| Sep 30, 2022 | P00023 | $2.7M | CONSTRUCTION OF FACILITIES - FY18 INCREMENT OF FUNDS |
| Sep 30, 2022 | P00024 | $487.0K | CONSTRUCTION OF FACILITIES ADMIN MOD DUE TO ERROR IN A00073 |
| Sep 29, 2022 | P00022 | $323.7K | CONSTRUCTION OF FACILITIES |
| Sep 27, 2022 | A00073 | $0 | CONSTRUCTION OF FACILITIES |
| Sep 15, 2022 | P00021 | $0 | CONSTRUCTION OF FACILITIES - ADD DO RATED CLAUSE |
| Aug 12, 2022 | A00072 | $0 | CONSTRUCTION OF FACILITIES |
| Jul 7, 2022 | A00070 | $0 | CONSTRUCTION OF FACILITIES |
| Jul 7, 2022 | A00071 | $0 | MODIFICATION TO RECONFIGURE THE SERVER ROOM LAYOUT SH099, R00086 ON CONTRACT FOR 091884 - HOSPITAL REPLACEMENT, LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD |
| Jun 24, 2022 | P00020 | $87.6M | CONSTRUCTION OF FACILITIES - INCREASING CLIN 000104 FY22 INCREMENTAL FUNDING AND CLIN 000101 FY18 MANAGEMENT RESERVES CONSTRUCTION FUNDS |
| May 13, 2022 | A00069 | $0 | CONSTRUCTION OF FACILITIES |
| May 12, 2022 | A00068 | $0 | CONSTRUCTION OF FACILITIES |
| May 11, 2022 | A00067 | $0 | CONSTRUCTION OF FACILITIES |
| May 6, 2022 | A00066 | $0 | CONSTRUCTION OF FACILITIES |
| May 5, 2022 | A00065 | $0 | CONSTRUCTION OF FACILITIES |
| May 4, 2022 | A00064 | $0 | CONSTRUCTION OF FACILITIES |
| Apr 29, 2022 | A00063 | $0 | CONSTRUCTION OF FACILITIES |
| Apr 27, 2022 | P00019 | $57.3M | CONSTRUCTION OF FACILITIES - FY22 INCREMENTAL FUNDING MOD |
| Apr 25, 2022 | P00018 | $91.4K | CONSTRUCTION OF FACILITIES - ADMINISTRATIVE FUNDING MOD |
| Mar 22, 2022 | A00062 | $0 | CONSTRUCTION OF FACILITIES |
| Mar 15, 2022 | A00061 | $0 | CONSTRUCTION OF FACILITIES |
| Mar 3, 2022 | A00059 | $0 | CONSTRUCTION OF FACILITIES |
| Mar 3, 2022 | A00060 | $0 | CONSTRUCTION OF FACILITIES |
| Mar 2, 2022 | A00058 | $0 | CONSTRUCTION OF FACILITIES |
| Feb 16, 2022 | A00057 | $0 | CONSTRUCTION OF FACILITIES |
| Feb 14, 2022 | A00056 | $0 | MODIFICATION TO CONTRACT FOR 091884 - HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI FOR REFERENCE NO. R00067 SH064 SERVERY CEILING |
| Feb 10, 2022 | A00055 | $0 | MODIFICATION TO CONTRACT FOR 091884 - HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI FOR SH061 SINGLE FUEL FILTRATION SYSTEM. |
| Feb 7, 2022 | A00054 | $0 | MODIFICATION TO CONTRACT FOR 091884 - HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI FOR POWER METERING FOR MDMS AND MEDCOM |
| Jan 28, 2022 | A00053 | $0 | CONSTRUCTION OF FACILITIES |
| Jan 28, 2022 | P00017 | $5.1M | CONSTRUCTION OF FACILITIES - FLW HOSPITAL OPTION MOD. EXERCISE CLINS 0005-0009 AND 0014 |
| Jan 26, 2022 | A00051 | $0 | MODIFICATION FOR AIRBORNE ISOLATION ICU TO CONTRACT FOR 091884 - HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI. |
| Jan 26, 2022 | A00052 | $0 | MODIFICATION TO CONVERT HELIPAD LIGHTING TO LED FOR CONTRACT FOR 091884 - HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI. |
| Jan 24, 2022 | P00016 | $0 | MODIFICATION FOR REVISE OFF-SITE STORED MATERIALS LIST TO CONTRACT FOR 091884 - HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI |
| Jan 20, 2022 | P00015 | $0 | CONSTRUCTION OF FACILITIES |
| Dec 22, 2021 | A00050 | $0 | CONSTRUCTION OF FACILITIES |
| Dec 13, 2021 | A00049 | $0 | CONSTRUCTION OF FACILITIES |
| Dec 3, 2021 | A00048 | $0 | CONSTRUCTION OF FACILITIES |
| Dec 1, 2021 | A00047 | $0 | CONSTRUCTION OF FACILITIES |
| Nov 30, 2021 | A00044 | $0 | CONSTRUCTION OF FACILITIES |
| Nov 30, 2021 | A00045 | $0 | CONSTRUCTION OF FACILITIES |
| Nov 30, 2021 | A00046 | $0 | CONSTRUCTION OF FACILITIES |
| Nov 29, 2021 | A00038 | $0 | CONSTRUCTION OF FACILITIES |
| Nov 29, 2021 | A00039 | $0 | CONSTRUCTION OF FACILITIES |
| Nov 29, 2021 | A00040 | $0 | CONSTRUCTION OF FACILITIES |
| Nov 29, 2021 | A00041 | $0 | CONSTRUCTION OF FACILITIES |
| Nov 29, 2021 | A00042 | $0 | CONSTRUCTION OF FACILITIES |
| Nov 29, 2021 | A00043 | $0 | CONSTRUCTION OF FACILITIES |
| Nov 27, 2021 | A00037 | $0 | CONSTRUCTION OF FACILITIES |
| Nov 19, 2021 | A00036 | $0 | CONSTRUCTION OF FACILITIES |
| Nov 18, 2021 | A00034 | $0 | CONSTRUCTION OF FACILITIES |
| Nov 18, 2021 | A00035 | $0 | CONSTRUCTION OF FACILITIES |
| Nov 10, 2021 | A00033 | $0 | CONSTRUCTION OF FACILITIES |
| Nov 4, 2021 | A00031 | $0 | CONSTRUCTION OF FACILITIES |
| Nov 4, 2021 | A00032 | $0 | CONSTRUCTION OF FACILITIES |
| Nov 3, 2021 | A00030 | $0 | CONSTRUCTION OF FACILITIES |
| Nov 2, 2021 | A00029 | $0 | CONSTRUCTION OF FACILITIES |
| Nov 1, 2021 | A00028 | $0 | CONSTRUCTION OF FACILITIES |
| Oct 29, 2021 | A00027 | $0 | CONSTRUCTION OF FACILITIES |
| Oct 22, 2021 | P00014 | $0 | CONSTRUCTION OF FACILITIES - ADMIN MOD TO CORRECT OMISSION FROM MOD A00026 |
| Oct 13, 2021 | A00026 | $0 | CONSTRUCTION OF FACILITIES |
| Oct 6, 2021 | P00013 | $0 | CONSTRUCTION OF FACILITIES - EXTEND PERIOD FOR CONTRACTING OFFICER TO EXERCISE OPTIONS |
| Sep 30, 2021 | A00025 | $0 | CONSTRUCTION OF FACILITIES |
| Sep 29, 2021 | P00012 | $3.9M | CONSTRUCTION OF FACILITIES - EXERCISE OPTION CLINS 0004, 0010-0013, AND 0015-0019 |
| Sep 20, 2021 | P00011 | $0 | CONSTRUCTION OF FACILITIES |
| Aug 6, 2021 | P00010 | $0 | CONSTRUCTION OF FACILITIES - MODIFICATION TO EXTEND EXERCISE OPTION PERIOD FOR CLINS 0004-0019 |
| Jul 23, 2021 | P00009 | $30.5M | CONSTRUCTION OF FACILITIES - INCREMENTAL FUNDING FY21 MODIFICATION |
| Jun 30, 2021 | A00024 | $0 | CONSTRUCTION OF FACILITIES |
| Jun 29, 2021 | P00008 | $0 | CONSTRUCTION OF FACILITIES - ACM ACTUALS MODIFICATION |
| May 7, 2021 | A00023 | $0 | CONSTRUCTION OF FACILITIES |
| Apr 12, 2021 | A00022 | $0 | MODIFICATION FOR SH050 SUBSCRIBER SERVICES CABLE AMERICA TO CONTRACT FLW HOSPITAL REPLACEMENT AT FORT LEONARD WOOD, MISSOURI |
| Mar 12, 2021 | A00021 | $0 | MODIFICATION FOR SUBMITTAL REGISTER UPDATE TO CONTRACT FOR HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI. |
| Mar 3, 2021 | A00020 | $0 | MODIFICATION FOR REMOVAL OF UNDERGROUND STORAGE TANKS TO CONTRACT FOR HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI. |
| Mar 1, 2021 | A00019 | $0 | MODIFICATION FOR DEEP SEAL TRAP TO CONTRACT FOR HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI. |
| Feb 25, 2021 | P00007 | $0 | MODIFICATION FOR REMOVAL OF UNDOCUMENTED FILL (ACM) TO CONTRACT FOR HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI. |
| Feb 11, 2021 | A00018 | $0 | MODIFICATION FOR EQUIPMENT BRANCH POWER TO CLINIC REFRIGERATOR TO CONTRACT FOR HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI. |
| Feb 9, 2021 | P00006 | $0 | MODIFICATION FOR PAYMENT FOR SPECIFIED MATERIALS DELIVERED OFF-SITE TO CONTRACT FOR HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI. |
| Feb 1, 2021 | A00017 | $-230.0K | MODIFICATION FOR 2ND EXTRA REMOVAL OF ROCK/RELICT BED TO CONTRACT FOR FLW HOSPITAL REPLACEMENT, FORT LEONARD WOOD, MO |
| Jan 29, 2021 | A00016 | $0 | MODIFICATION FOR DELAYS CAUSED BY ADVERSE WEATHER IN EXCESS OF ANTICIPATED TO CONTRACT FOR HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI. |
| Jan 25, 2021 | A00015 | $230.0K | MODIFICATION FOR ADDITIONAL REMOVAL OF ROCK/RELICT BED TO CONTRACT FOR HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI. |
| Jan 22, 2021 | A00014 | $0 | MODIFICATION FOR SUBSCRIBER SERV. CENTURY LINK AND BASECO TO CONTRACT FOR FLW HOSPITAL REPLACEMENT AT FT. LEONARD WOOD, MISSOURI |
| Jan 21, 2021 | A00013 | $0 | MODIFICATION FOR OUTDOOR BREAK PAVILION TO CONTRACT FOR HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI. |
| Jan 15, 2021 | A00012 | $0 | MODIFICATION FOR ADD SIDEWALK AT ILLINOIS AVE & CHANNIL TO CONTRACT FOR HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI. |
| Jan 14, 2021 | A00011 | $0 | MODIFICATION FOR ADDITIONAL STORAGE AREA FOR SPOILS TO CONTRACT FOR HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI. |
| Jan 12, 2021 | A00009 | $0 | MODIFICATION FOR MO AVE SPUR ISLAND TO CONTRACT FOR FLW HOSPITAL REPLACEMENT AT FT. LEONARD WOOD, MISSOURI |
| Jan 11, 2021 | A00005 | $25.9K | MODIFICATION FOR MOCKUP ROOMS TO CONTRACT FOR HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI. |
| Jan 11, 2021 | A00006 | $0 | MODIFICATION FOR ADD SIDEWALK FOR TEMP PARKING LOT TO CONTRACT FOR HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI. |
| Jan 11, 2021 | A00007 | $0 | MODIFICATION FOR EXISTING WATERLINE RELOCATION TO CONTRACT FOR HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI. |
| Dec 22, 2020 | P00005 | $0 | ADDING REQUIRED FAR AND DFAR CLAUSES 52.204-25 AND 252.204-7018. |
| Oct 23, 2020 | P00004 | $0 | MODIFICATION FOR ADMIN MOD DISCREPANCY BETWEEN JSNS/CLINS TO CONTRACT FOR HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI. |
| Aug 27, 2020 | A00003 | $-117.3K | MODIFICATION FOR RFI-0013, 33&36 CHANGES AND, RELOCATE FIRE EXTINGUISHER AND SHELTER TO CONTRACT FOR HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI. |
| Jul 22, 2020 | P00003 | $29.4K | MODIFICATION FOR ADDITIONAL PARKING GOV SITE TRAILER CHANGES AND, REMOVE ABANDONED NATURAL GAS LINE TO CONTRACT FOR HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI. |
| Jul 21, 2020 | A00002 | $206.9K | MOD FOR STORM EVENT RELEASE&REV RFP APP L-5 TEMP PARKING DELETION, ADD PARKING SIGNS AND, OPEN CUT NEBRASKA AVE&FIRST STREET TO CONTRACT FOR HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT AT FT. LEONARD WOOD, MISSOURI. |
| Jul 10, 2020 | P00002 | $43.6M | CONSTRUCTION OF FACILITIES - MODIFICATION TO INCORPORATE FY20 INCREMENTAL FUNDING. SUBCLIN 000101 WAS ADDED |
| May 8, 2020 | A00001 | $-236.3K | MODIFICATION FOR DELETE RADON MITIGATION REQUIREMENT AND, EXTERIOR FACADE LIGHTING TO CONTRACT FOR HOSPITAL REPLACEMENT (CONSOLIDATED), LARGE BUSINESS DESIGN/BUILD CONTRACT. AT FT. LEONARD WOOD, MISSOURI. |
| Oct 3, 2019 | P00001 | $0 | FLW HOSPITAL REPLACEMENT PROJECT, CXC AND ADP MODIFICATION AT FORT LEONARD, MO |
| Aug 8, 2019 | 0 | $79.2M | DESIGN BUILD CONSTRUCTION OF FACILITIES FORT LEONARD WOOD HOSPITAL REPLACEMENT |