Federal contract award

W912DQ19C7001

N2W NGA FY18 DESIGN AND CONSTRUCTION (PHASE 1)

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW071 ENDIST KANSAS CITY
NAICS236220 — Commercial and Institutional Building Construction
PSCY1AA — CONSTRUCTION OF OFFICE BUILDINGS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$769.9M
Current contract value$769.9M
Potential contract value / ceiling$779.9M
Start dateMar 19, 2019
Current end dateJan 22, 2026
Potential end dateJan 22, 2026
Latest award activityMay 7, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 100 of 100 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 7, 2026A00058$31.1KCONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO MOD R00098 O AND M CHANGES
Jan 22, 2026A00057$327.6KCONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO MOD R00098 O AND M CHANGES
Dec 12, 2025A00056$127.5KMODIFICATION TO MCT PHONES, IRRIGAT., FLOORING, ACRONIS OF CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Nov 24, 2025P00042$510.0KMODIFICATION OF DIVIDING PANELS IN MODULES TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Nov 14, 2025P00041$911.6KMODIFICATION OF AV CABINET MODS COPY CTR & EXEC SUITE TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Oct 31, 2025A00055$371.6KMODIFICATION OF IFMS KITCHEN, HMI, CUP SKID, SAUTE, SIGN TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Oct 16, 2025A00054$467.9KMODIFICATION OF SERVICE ELEVATOR, EPOXY COAT, & ONE BLS TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Sep 23, 2025A00053$483.9KMODIFICATION OF CAGE, GYM, WINDOW FILM, PCC, REPAINT TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Sep 15, 2025A00052$490.0KMODIFICATION FOR KNOWLEDGE WALL, SIGNAGE & DOOR HARDWARE TO CONTRACT FOR PROJECT EERO DESIGN-BUILD, ST LOUIS, MISSOURI.
Aug 26, 2025P00040$0EXECUTIVE ORDER SCOPE MOD
Aug 20, 2025P00039$-480.1KMODIFICATION TO LANDSCAPING TURNOVER DELAY & WEATHER OF CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT.
Jul 23, 2025A00051$189.6KMODIFICATION OF ASR CLEAN, COFFEE, RETAIL FLOOR, TABLES TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Jul 9, 2025P00038$73.8KTHE PURPOSE OF THIS MODIFICATION IS TO UPDATE O&M MATERIALS AND SUPPLIES WITH THE LATEST PRICE INDEX INFORMATION.
Jul 1, 2025P00037$343.2KMODIFICATION OF CONFERENCE ROOMS, S60, WATCH FLOOR TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Jun 17, 2025P00036$359.9KMODIFICATION OF TRAINING ROOM, COFFEE BAR, RESEARCH LAB TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
May 19, 2025A00050$287.7KMODIFICATION TO HUDDLE-QUIET ROOM CONVERSION OF CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
May 7, 2025P00035$1.3MMODIFICATION OF CYBERSECURITY & 2-WAY AOR COMMS TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Jan 23, 2025P00034$11.7MFY19 DESIGN AND CONSTRUCTION (PHASE 2) - 1 YEAR O&M PHASE 1 EXERCISE OPTION MOD
Sep 5, 2024A00049$28.7KMODIFICATION OF DESCOPE IMPROVEMENTS SW CORNER PROJECT, SHELVING SUPPORT FINISH, VARIATION CREDITS, AND SBSA ZONE SIGNAGE COORDINATION TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Jun 27, 2024P00033$1.6MMODIFICATION OF LABELS - ROOMS AND WORKSTATIONS, PLUMBING SYSTEMS CLARIFICATION, ARCHITECTURAL SYSTEMS CLARIFICATION, WEATHER TIME EXTENSION JAN 24 - FEB 24, AND SACHS TIA EATON SUPPLY CHAIN TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Mar 28, 2024A00048$199.0KMODIFICATION OF ELECTRICAL SYSTEMS FLEX MODULE SHAFTS CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Feb 8, 2024P00032$559.9KMODIFICATION OF REA COURTYARD ROLLER SHADES CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO. REFERENCE NO. R00078 0206 REA COURTYARD ROLLER SHADES SEE PAGE 2
Sep 22, 2023A00047$170.2KMODIFICATION OF SBSA UTILITY EXTENSIONS, DESCOPE BENCH PAD TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Aug 25, 2023A00046$0MODIFICATION OF POWER FEASIBILITY STUDY TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Jul 5, 2023P00031$2.0MMODIFICATION OF REA - IFMS LEVEL 4 TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
May 18, 2023A00045$124.6KMODIFICATION OF REVISION TO FDW TEMPLATES TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Mar 31, 2023P00030$-513.0KMODIFICATION OF ROLLER SHADE CENTRAL CONTROL, KNOWLEDGE WALL CHANGES, AND STC 45 LABYRINTH WALLS TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Jan 30, 2023A00044$361.0KMODIFICATION OF REVISED JOINT USE MILESTONES TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Jan 12, 2023A00043$341.2KMODIFICATION TO ACS FOR PDR CABINETS AND UTV STORAGE RELOCATION TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Dec 14, 2022P00029$702.0KMODIFICATION IN CHANGES TO EXE AND S44, RF SHIELDING FOR MC WORKROOM, AND RIF ACCESS ROAD WIDENING CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Oct 26, 2022A00042$209.8KMODIFICATION OF PHOTOCATALYTIC AIR SANITIZERS AND REDUCE ELECTRONIC SIGNAGE TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Sep 13, 2022P00028$0MODIFICATION OF ADMIN MOD - PHASE 1, INC ADJUSTMENTS TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Sep 8, 2022A00041$213.6KMODIFICATION OF WAO ENCLAVE COLORS IN PUBLIC HUB, FCC AHU RELOCATION TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Aug 4, 2022P00027$950.0KMODIFICATION FOR REA IFMS LEVEL 5 TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Jul 28, 2022P00026$2.2MMODIFICATION OF SEC TRANS SW & NW ELEVATOR LOBBY, FACILITY CONTROL CENTER (FCC) CHANGES, CORRECTION OF TYPO IN R00061 TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Jun 27, 2022A00040$0MODIFICATION OF 2022 REVISED JOINT USE MILESTONES TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Jun 13, 2022A00039$375.8KMODIFICATION OF ADDT'L TELECOM FOOD SERVICES TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Jun 2, 2022A00038$-91.6KMODIFICATION OF INTERLOCK AT AREA F TRANSITIONS, OMIT PAINTING TIER 3 EXPOSED CEILINGS TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
May 13, 2022P00025$1.0MMODIFICATION OF S60 CHANGES, NCG WORKSTATIONS & TDK CHANGES, AND CREATE RF VESTIBULES AT CORRIDORS TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Apr 19, 2022A00037$0MODIFICATION OF WEATHER TIME EXTENSION JAN 22 - MAR 22 TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Apr 5, 2022A00036$313.2KMODIFICATION OF DIVIDE MAIL ROOM SPACE, CREATE CSOC SUITE, AND S64 CHANGES TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Mar 10, 2022A00035$316.0KMODIFICATION FOR WSU SUITE CHANGES, MCP TRAINING ROOM, AND RELOCATE COMMERCIAL CONNECTIONS IN FDR TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Mar 2, 2022P00024$1.9MMODIFICATION FOR RF SHIELDING ISOLATED SPACES, ABA SUPPORT SPACE - SPG WEST, AND AMEREN SUBSTATION DESIGN CHANGE TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Feb 10, 2022P00023$275.5KMODIFICATION TO CREATE CLASSIFIED COMSEC SUITE, MOVE DOORS TO INT. FLEX MED CR, AND REDEFINE TERMINATION METHOD OF CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Jan 24, 2022A00034$0MODIFICATION OF WEATHER TIME EXTENSION OCT 21 - DEC 21 TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Jan 19, 2022A00033$394.9KMODIFICATION TO CREATE ADDITIONAL CLASSIFIED SUITE S63, ADD IPMS TO THE MOB ROOF, COMBINE PUBLIC HUB RETAIL SPACE TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Dec 16, 2021P00022$35.5MMODIFICATION FOR FF&E PHASE 2 CLIN 0004 TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Dec 10, 2021A00032$166.2KMODIFICATION FOR SPG STAIR ENCLOSURES INCURRED COSTS, LIBRARY CHANGES, POWDER-COATED UNDERFLOOR BASKET TRAY TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Nov 23, 2021A00031$436.6KMODIFICATION FOR ABA SUPPORT SPACE - SPG EAST, RETAIL SPACE SECURITY GRILLES, WSC SUITE ADDITIONS TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Nov 5, 2021A00030$332.2KMODIFICATION FOR DECK-TO-DECK SOUND RATED PARTITIONS,VCCPL ELECTRICAL PANEL, CACP K9 TRAILER, CAP TRIP UNIT REPLACEMENT, VECP SCHEDULE 40 VS STANDARD WEIGHT PIPE, DP6 REJECTION ADMINISTRATIVE COSTS, BER MILESTONE UPDATE TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Oct 15, 2021P00021$497.9KMODIFICATION FOR REMOVE A9 SPACES FROM MCN SUITE, SPECIAL FUNCTION DINING ROOM DOORS, S37 LAB CHANGES, AND S19 SPACE CHANGES TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Sep 3, 2021P00020$28.1MMODIFICATION FOR NETWORK CLOCKS & ROOM RESERVATION SYSTEM, HYBRID FIBER FOR WIRELESS, RTLS CABLING, IDS INFRASTRUCTURE, SIGNAL CABLING FOR IPMS, ACS INFRASTRUCTURE, CCTV INFRASTRUCTURE IN MOB AND CUP TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO. 0151 SPECIAL SYSTEMS TIME IMPACT
Sep 2, 2021P00019$1.5MMODIFICATION FOR CHANGE CONTROL TEAM TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Aug 17, 2021P00018$0MODIFICATION FOR ADMIN - HIGH BAY 35/65 CLIN SPLIT TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Aug 4, 2021A00029$206.6KMODIFICATION FOR ADDITIONAL SURVEY MARKERS FOR RIF WATER LINE UPSIZE, PHOTOCATALYTIC INCURRED COSTS, S61 VOIP AND LAB TELECOM RELOCATE DOOR, BOOSTER PUMP BYPASS, DELETE SELECT DOOR CLOSERS TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Jul 27, 2021A00028$487.5KMODIFICATION FOR ARCHITECTURAL ROOM NUMBERING TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Jul 13, 2021A00027$245.1KMODIFICATION FOR NE SECURITY FENCE REALIGNMENT, INCREASE WORKSTATIONS IN SUITE S62, FITNESS CENTER FLOOR OUTLETS, SPG CAMERA REQUIREMENTS 120V, DAS REQUIREMENTS TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Jun 3, 2021A00026$374.9KMODIFICATION FOR VCC BALLISTIC PROTECTION & WASTE DISPOSERS IN BREAK AREAS/KITCHEN TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
May 27, 2021A00025$201.8KMODIFICATION FOR TEMPERATURE PROBES, MOVE WALL IN SCG TRAINING ROOM,SITE LAYOUT, ADD INDEPENDENT POWER FOR AREA M BER, AND FACILITATED PARTNERING TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
May 24, 2021A00024$164.0KMODIFICATION FOR ADD BREAK AREA TO LOWER LEVEL TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
May 18, 2021A00023$0MODIFICATION FOR WEATHER TIME EXTENSION JAN 21 - MAR 21 CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
May 7, 2021P00017$369.0KMODIFICATION FOR ADDT'L SEC TRANS BETWEEN H2U AND H3C PROTECTED CABLE PATHWAYS INCREASE PDR SIZE TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Apr 13, 2021P00016$2.3MMODIFICATION FOR BOOSTER PUMP SETTLEMENT TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Feb 18, 2021P00015$20.5MMODIFICATION EXECUTES OPTION CLIN0003 FURNITURE FIXTURES AND EQUIPMENT PHASE 1. PERIOD OF PERFORMANCE REMAINS UNCHANGED.
Feb 4, 2021P00014$101.2KMODIFICATION FOR THIN AND THICK CLIENT DISTRIBUTION TO CONTRACT FOR PROJECT EERO DESIGN-BUILD AT ST. LOUIS, MO
Jan 25, 2021A00022$12.5KMODIFICATION FOR ADDITIONAL STC/SPC MOCKUP TESTING TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Jan 14, 2021P00013$26.7MMODIFICATION FOR INCREMENT 3, PHASE 2 TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Jan 5, 2021P00012$9.0MMODIFICATION FOR HIGH BAY AND, DIFF SITE - UNDERGROUND DETENTION BASIN TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Dec 16, 2020A00021$0MODIFICATION TO VCCPL JOINT USE MILESTONE TO CONTRACT FOR PROJECT EERO DESIGN-BUILD AT ST. LOUIS, MO
Dec 15, 2020A00020$20.8KMODIFICATION FOR REVISED EQUIPMENT NAMING CONVENTION USER FACING STAGING TELECOM CHANGES RESTROOM CONFIGURATION AND DETENTION BASIN D DIFFERING SITE TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Dec 14, 2020A00019$162.0KMODIFICATION FOR CUSTODIAL OFFICE AND FITNESS CENTER CSP - SUPPLY CHAIN RISK MANAGEMENT CEILING PLENUM AND SOUND MASKING MOCKUP TESTING TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Nov 20, 2020P00011$0MODIFICATION FOR ADMINISTRATIVE CHANGE - MANDATED CLAUSES TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Sep 2, 2020A00018$180.6KMODIFICATION FOR ADDT'L SEC TRANSITION EXE SUITE ATM IN PUBLIC HUB MED SUITE DRINKING FOUNTAIN CORRECTION- CHANGE 0031 ENLARGE PDR AND, HARDCOPY SUBMITTAL QUANTITY REDUCTION TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Aug 3, 2020A00017$9.8KMODIFICATION FOR PAINT CACP PAVEMENT TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Jul 28, 2020A00016$0MODIFICATION FOR DELAYS CAUSED BY ADVERSE WEATHER IN EXCESS OF ANTICIPATED TO CONTRACT FOR CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Jul 24, 2020P00010$-670.9KMODIFICATION FOR VECP MOB ELEVATORS COATED STEEL BELTS TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Jul 23, 2020A00015$93.3KMODIFICATION FOR ADD SCIF BOUNDARY TO MOB-H2U-SCG-LBF-001 FIRE EXTINGUISHER CABINETS MCP SUITE RECEPT. DESK ADDITIONAL P4 OFFICE IN S44 AND, CAT 6 STP CABLE FOR SSCC, ACO,&CSST TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT, ST. LOUIS, MO.
Jul 22, 2020A00014$0MODIFICATION FOR RIF BERM DELETION TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Jul 8, 2020A00013$-110.4KMODIFICATION FOR REDUCE QUANTITY VCC DEVICE LOCKERS AND, CSC SUITE P3 OFFICES TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Jul 7, 2020A00012$172.4KMODIFICATION FOR NCG SUITE CHANGES AND, S59 FF&E CHANGES TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Jun 24, 2020P00009$2.3MMODIFICATION FOR STRUCTURED PARKING GARAGE ELEVATORS TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT, ST. LOUIS, MISSOURI.
Jun 23, 2020P00008$47.9KMODIFICATION TO PROHIBIT WINDOWS IN MISSION CRITICAL AREAS TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Jun 17, 2020P00007$335.0KMODIFICATION FOR VCC SQUARE FOOTAGE INCREASE TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Jun 8, 2020A00011$0MODIFICATION FOR ALTERNATIVE JOINT USE SPACES AND, WEATHER TIME EXTENSION TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
May 13, 2020P00006$200.8MMODIFICATION FOR INCREMENT 2, PHASE 2 TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
May 6, 2020P00005$-867.5KMODIFICATION FOR RISER CABLE FROM PDR TO ANTENNA ROOM COMBINING ANTENNA ROOM SPACES AND, SEWER PIPE MATERIAL REVISION TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Apr 3, 2020A00010$397.1KMODIFICATION TO ENLARGE BUILDING ENTRANCE ROOMS TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Mar 31, 2020A00009$-225.4KMODIFICATION FOR REARRANGE S19 SPACES ADD/REMOVE SCIF BOUNDARIES PITD SPACE CLASS AND ADJACENCY AMBER STROBE REMOVAL VCC ROOF CONSTRUCTION REMOVE SPECIFIC DESTRUCTION AREA EQUIPMENT QUANTITY OF HARDCOPY SUBMITTALS WORKSTATION USB REQUIREMENTS POL 000 VS PLY 000 FURNITURE TYPE AND, DIP TO PVC IRRIGATION DISTRIBUTION SYSTEM TO CONTRACT FOR CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Mar 27, 2020A00007$0MODIFICATION FOR FOR DELAYS CAUSED BY ADVERSE WEATHER IN EXCESS OF ANTICIPATED TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Mar 17, 2020A00006$177.2KMODIFICATION FOR ADDITIONAL TOILET IN PUBLIC HUB - H1P MED SUITE CHANGES 3 ADDITIONAL POLYGRAPH&QC RM LIB SUITE CHANGES&HIGH DENSITY STORAGE ADDITIONAL H1P RETAIL SPACE AMEREN SUBSTATION COMMUNICATION APPLYING EXCESS SQFT AT VCC TO CANOPY 6-INCH INLET VAV MINIMUM AIRFLOW TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Feb 12, 2020P00004$103.6KMODIFICATION FOR THIN AND THICK CLIENT DISTRIBUTION TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Feb 5, 2020P00003$225.0KMODIFICATION FOR THIN AND THICK CLIENT DISTRIBUTION TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Jan 10, 2020A00005$206.1KMODIFICATION FOR S32 CONFIG W/ PRINTER&S61 ADD PRINTER VTOC (T18) OPEN OFFICE AREA CREATE ADDT'L CLASS SUITE, S62 VEWSD REMOVAL FROM SELECT SPACES AND, CHANGES TO MINIMUM NET AREA REQUIREMENTS TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Nov 22, 2019A00004$65.0KMODIFICATION FOR WORKSTATION REDUCTION POLICE CENTER, S16 INO SUITE SEP ACCESS&ADD REFRIGERATOR REVISE M-H SITE MAINTENANCE DURATION AND, ENLARGE PRIMARY DISTRIBUTION ROOM TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Nov 7, 2019P00002$0MODIFICATION FOR ADMINISTRATIVE CHANGE - UPDATED DD254 TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Nov 4, 2019A00003$53.2KMODIFICATION FOR S60 RM CONFIG&ADD DEVICE LOCKERS ANSI ILO UFC P&ID GRAPHICS ADJACENCY OF STORAGE ROOM TO LAB-AREA AND, DRG SUITE ENTRANCE TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Oct 17, 2019A00002$24.2KMODIFICATION FOR SOFTWARE TESTING LAB MONITOR; S59 SPACE CHANGES COMBINING STORAGE; SRC FILE ROOM ACCESS; AND, MCN WORK ROOM 201 CHANGES TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
Oct 16, 2019A00001$29.3KMODIFICATION FOR TELECOM SPACE IN SECURITY TRAILER; EARLY SITE WORK; AND, QUANTITY OF HARDCOPY SUBMITTALS TO CONTRACT FOR PROJECT EERO DESIGN-BUILD CONTRACT AT ST. LOUIS, MO.
May 7, 2019P00001$0ADMINISTRATIVE MODIFICATION TOFY18 DESIGN AND CONSTRUCTION (PHASE 1)
Mar 19, 20190$408.0MN2W NGA FY18 DESIGN AND CONSTRUCTION (PHASE 1)