Federal contract award

W912DQ23C7001

REMOTE INSPECTION FACILITY BASE

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW071 ENDIST KANSAS CITY
NAICS236220 — Commercial and Institutional Building Construction
PSCY1EZ — CONSTRUCTION OF OTHER INDUSTRIAL BUILDINGS
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$19.4M
Current contract value$19.4M
Potential contract value / ceiling$19.6M
Start dateJul 28, 2023
Current end dateJun 25, 2026
Potential end dateJun 25, 2026
Latest award activityJun 2, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 23 of 23 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 2, 2026A00020$28.8KIT FIBER TERMINATIONS
May 13, 2026A00019$54.9KDRYER VENT, CO DETECTORS AND DUCT DETECTOR
Mar 30, 2026A00018$164.1KUPS LIGHTING, CANOPY ELEC, GATE PATHWAY
Feb 10, 2026A00017$19.4KPAINTING DESCOPE AND AVB CONDUIT ADD
Jan 14, 2026A00016$68.7KATS, LADDER, POWER, AND SHELVES
Dec 9, 2025A00015$130.5KMODIFICATION OF ELEVATOR EMERGENCY PHONE & TV RECEPTACLE TO CONTRACT FOR REMOTE INSPECTION FACILITY AT ST. LOUIS, MISSOURI.
Oct 31, 2025P00002$0REMOTE INSPECTION FACILITY BASE
Sep 3, 2025A00014$94.8KMODIFICATION FOR INSPECTION CANOPY BENT PLATE & BACKFILL FOR REMOTE INSPECTION FACILITY (RIF) CONTRACT, ST LOUIS, MO
Jun 9, 2025A00013$49.2KMODIFICATION FOR CANOPY STEEL TIE RODS AND TURNBUCKLES TO CONTRACT FOR REMOTE INSPECTION FACILITY AT ST. LOUIS, MISSOURI.
May 29, 2025A00012$334.0KMODIFICATION OF VEHICLE BARRIER CONTROLS AND GATE ARMS TO CONTRACT FOR REMOTE INSPECTION FACILITY AT ST. LOUIS, MISSOURI.
May 13, 2025A00011$11.9KMODIFICATION OF GRADING AROUND BUILDING SIDEWALK AND DF1 TO CONTRACT FOR REMOTE INSPECTION FACILITY AT ST. LOUIS, MISSOURI.
Apr 22, 2025A00010$0MODIFICATION OF WEATHER TIME EXTENSION JAN 25 - MAR 25 TO CONTRACT FOR REMOTE INSPECTION FACILITY AT ST. LOUIS, MISSOURI.
Apr 4, 2025A00009$288.9KMODIFICATION OF ELECTRICAL CHANGES DUE TO AVB LOADS, GARBAGE DISPOSAL AND HVU-1, AND TEMP ROCK LAYING AT MOB ENTRANCE TO CONTRACT FOR REMOTE INSPECTION FACILITY AT ST. LOUIS, MISSOURI.
Jan 27, 2025A00008$55.0KMODIFICATION OF SLIDING GATE STYLE AND STRUCTURAL STEEL TO CONTRACT FOR REMOTE INSPECTION FACILITY AT ST. LOUIS, MISSOURI.
Dec 31, 2024A00007$-87.9KMODIFICATION OF DROP ARM, CALL BOX, RPM CONDUITS, CETASM DESCOPE, AND CONCRETE PAD TO CONTRACT FOR REMOTE INSPECTION FACILITY AT ST. LOUIS, MISSOURI.
Oct 24, 2024A00006$34.7KMODIFICATION OF DECONTAMINATION TANK PIPING AND DF3 MANHOLE BREAK IN AND GRADING TO CONTRACT FOR REMOTE INSPECTION FACILITY AT ST. LOUIS, MISSOURI.
Oct 3, 2024A00005$95.5KMODIFICATION TO AMEREN DUCTBANK CONFLICT WITH STORM LINE AND FIRE SUPPRESSION AT CANOPY DESCOPE OF CONTRACT FOR REMOTE INSPECTION FACILITY AT ST. LOUIS, MISSOURI.
Sep 5, 2024A00004$8.9KMODIFICATION OF GAS METER CONFIGURATION, SIDEWALK PATROL ROAD AND CURB RAMP TO CONTRACT FOR REMOTE INSPECTION FACILITY AT ST. LOUIS, MISSOURI.
Jun 5, 2024A00003$57.3KMODIFICATION OF EQUIPMENT SCHEDULE VOLTAGE REDESIGN, ADD REINFORCEMENT RETAINING WALL FOOTING TO CONTRACT FOR REMOTE INSPECTION FACILITY AT ST. LOUIS, MISSOURI.
Apr 11, 2024A00002$0MODIFICATION OF WEATHER TIME EXTENSION JAN 24 - MAR 24 CONTRACT FOR REMOTE INSPECTION FACILITY AT ST. LOUIS, MISSOURI. REFERENCE NO. R00003 0007 WEATHER TIME EXTENSION JAN 24 - MAR 24
Mar 28, 2024A00001$58.8KMODIFICATION OF STORM DRAIN CONFLICT, REMOVE STOP, LP CONTRACT FOR REMOTE INSPECTION FACILITY AT ST. LOUIS, MO REF. #R00002 0002 LIGHTNING PROTECTION & REMOVE CORP STOP 0003 MSD UTILITY DESIGN CHANGES 0004 STOM DRAIN CONFLICT WITH FENCE FOOTINGS
Aug 11, 2023P00001$663.9KEXERCISE OPTION CLIN 0002
Jun 29, 20230$17.2MREMOTE INSPECTION FACILITY BASE

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.