Federal contract award

W912DQ25CA002

CONSTRUCTION SERVICES TO RE-LINE 24-INCH LOW FLOW PIPE BETWEEN STILLING BASIN WALL AND PUMPING PLANT, REPLACE 24 INCH KNIFE VALVE, AND KNIFE VALVE FLOOR STAND AT CLINTON DAM AND RESERVOIR, LAWRENCE, KANSAS.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW071 ENDIST KANSAS CITY
NAICS237110 — Water and Sewer Line and Related Structures Construction
PSCY1NE — CONSTRUCTION OF WATER SUPPLY FACILITIES
Parent award / vehicleNot reported
Set-aside8(A) SOLE SOURCE
Pricing typeFIRM FIXED PRICE
Obligations$584.5K
Current contract value$584.5K
Potential contract value / ceiling$584.5K
Start dateFeb 20, 2025
Current end dateAug 27, 2026
Potential end dateAug 27, 2026
Latest award activityMay 13, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 13, 2026P00002$-36.2KCONSTRUCTION SERVICES TO RE-LINE 24-INCH LOW FLOW PIPE BETWEEN STILLING BASIN WALL AND PUMPING PLANT, REPLACE 24 INCH KNIFE VALVE, AND KNIFE VALVE FLOOR STAND AT CLINTON DAM AND RESERVOIR, LAWRENCE, KANSAS.
Sep 18, 2025A00001$0CONSTRUCTION SERVICES TO RE-LINE 24-INCH LOW FLOW PIPE BETWEEN STILLING BASIN WALL AND PUMPING PLANT, REPLACE 24 INCH KNIFE VALVE, AND KNIFE VALVE FLOOR STAND AT CLINTON DAM AND RESERVOIR, LAWRENCE, KANSAS.
Apr 23, 2025P00001$0CONSTRUCTION SERVICES TO RE-LINE 24-INCH LOW FLOW PIPE BETWEEN STILLING BASIN WALL AND PUMPING PLANT, REPLACE 24 INCH KNIFE VALVE, AND KNIFE VALVE FLOOR STAND AT CLINTON DAM AND RESERVOIR, LAWRENCE, KANSAS.
Feb 6, 20250$620.6KCONSTRUCTION SERVICES TO RE-LINE 24-INCH LOW FLOW PIPE BETWEEN STILLING BASIN WALL AND PUMPING PLANT, REPLACE 24 INCH KNIFE VALVE, AND KNIFE VALVE FLOOR STAND AT CLINTON DAM AND RESERVOIR, LAWRENCE, KANSAS.