Federal contract award

W912DR18F0460

DESIGN OF THE ADF-C ELECTRICAL INFRASTRUCTURE MASTER PLAN

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW2SD ENDIST BALTIMORE
NAICS541330 — Engineering Services
PSCC219 — Other Architect and Engineering Services
Parent award / vehicleW912DR16D0009
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$15.7M
Current contract value$15.7M
Potential contract value / ceiling$15.7M
Start dateJul 17, 2018
Current end dateNov 30, 2026
Potential end dateNov 30, 2026
Latest award activityMay 8, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 8 of 8 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 8, 2026P00007$261CENAB-ENF 03 APRIL 2018 03 JUNE 2021SCOPE OF ARCHITECT-ENGINEER SERVICES UNDER CONTRACT #W912DR-16-D-0009FOR THE DESIGN OF THE ADF-C ELECTRICAL INFRACTURE MASTER PLAN BUCKLEY AFB, COP2-459783I. BACKGROUNDTHE U.S. ARMY CORPS OF ENGINEERS (USA
May 8, 2026P00006$-140.0KCENAB-ENF 03 APRIL 2018 03 JUNE 2021SCOPE OF ARCHITECT-ENGINEER SERVICES UNDER CONTRACT #W912DR-16-D-0009FOR THE DESIGN OF THE ADF-C ELECTRICAL INFRACTURE MASTER PLAN BUCKLEY AFB, COP2-459783I. BACKGROUNDTHE U.S. ARMY CORPS OF ENGINEERS (USA
Nov 13, 2023P00005$91.1KEXERCISE OPTION LINS 0026AA, 0026AB &0028AA AND EXTEND POP TO 30 NOVEMBER 2026
Sep 23, 2021P00004$2.5MTASK 7: PRELIMINARY (60%) DESIGN AND REV
Jan 5, 2021P00003$54.6KTASK 7: PRELIMINARY (60%) DESIGN AND REV
Sep 5, 2019P00002$1.3MEXTENDED THE VALUE ENGINEERING EFFORT; REDUCE THE EFFORT OF ANNEX A FROM A NEW BUILDING TO BUILDING RENOVATION; AND EXTEND PERIOD OF PERFORMANCE TO 31 DECEMBER 2021, IAW THE UPDATED SOW DATED 13 MARCH 2019 AND REVISED PROPOSAL DATED 2 JULY 2019.
Dec 7, 2018P00001$6.8MTASK 7: PRELIMINARY (60%) DESIGN AND REV
Aug 1, 20180$5.0MDESIGN OF THE ADF-C ELECTRICAL INFRASTRUCTURE MASTER PLAN

Estimated positioning window

Nov 1, 2026 – Jan 30, 2027

Recompete signal:
75/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 75/100. Available recorded signals: 70 points.

Contract end 2026-11-30 (29 days from calculation)
+35 points
315 historical awards in this buyer and category group
+15 points
8 recorded award transactions
+10 points
Latest award action: 2026-05-08
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.