Federal contract award
W912DR18F0460
DESIGN OF THE ADF-C ELECTRICAL INFRASTRUCTURE MASTER PLAN
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W2SD ENDIST BALTIMORE |
| NAICS | 541330 — Engineering Services |
| PSC | C219 — Other Architect and Engineering Services |
| Parent award / vehicle | W912DR16D0009 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $15.7M |
| Current contract value | $15.7M |
| Potential contract value / ceiling | $15.7M |
| Start date | Jul 17, 2018 |
| Current end date | Nov 30, 2026 |
| Potential end date | Nov 30, 2026 |
| Latest award activity | May 8, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 8 of 8 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 8, 2026 | P00007 | $261 | CENAB-ENF 03 APRIL 2018 03 JUNE 2021SCOPE OF ARCHITECT-ENGINEER SERVICES UNDER CONTRACT #W912DR-16-D-0009FOR THE DESIGN OF THE ADF-C ELECTRICAL INFRACTURE MASTER PLAN BUCKLEY AFB, COP2-459783I. BACKGROUNDTHE U.S. ARMY CORPS OF ENGINEERS (USA |
| May 8, 2026 | P00006 | $-140.0K | CENAB-ENF 03 APRIL 2018 03 JUNE 2021SCOPE OF ARCHITECT-ENGINEER SERVICES UNDER CONTRACT #W912DR-16-D-0009FOR THE DESIGN OF THE ADF-C ELECTRICAL INFRACTURE MASTER PLAN BUCKLEY AFB, COP2-459783I. BACKGROUNDTHE U.S. ARMY CORPS OF ENGINEERS (USA |
| Nov 13, 2023 | P00005 | $91.1K | EXERCISE OPTION LINS 0026AA, 0026AB &0028AA AND EXTEND POP TO 30 NOVEMBER 2026 |
| Sep 23, 2021 | P00004 | $2.5M | TASK 7: PRELIMINARY (60%) DESIGN AND REV |
| Jan 5, 2021 | P00003 | $54.6K | TASK 7: PRELIMINARY (60%) DESIGN AND REV |
| Sep 5, 2019 | P00002 | $1.3M | EXTENDED THE VALUE ENGINEERING EFFORT; REDUCE THE EFFORT OF ANNEX A FROM A NEW BUILDING TO BUILDING RENOVATION; AND EXTEND PERIOD OF PERFORMANCE TO 31 DECEMBER 2021, IAW THE UPDATED SOW DATED 13 MARCH 2019 AND REVISED PROPOSAL DATED 2 JULY 2019. |
| Dec 7, 2018 | P00001 | $6.8M | TASK 7: PRELIMINARY (60%) DESIGN AND REV |
| Aug 1, 2018 | 0 | $5.0M | DESIGN OF THE ADF-C ELECTRICAL INFRASTRUCTURE MASTER PLAN |
Estimated positioning window
Nov 1, 2026 – Jan 30, 2027
75/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 75/100. Available recorded signals: 70 points.
- Contract end 2026-11-30 (29 days from calculation)
- +35 points
- 315 historical awards in this buyer and category group
- +15 points
- 8 recorded award transactions
- +10 points
- Latest award action: 2026-05-08
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.