Federal contract award
W912DR21C0016
BASE - ACF-VC1
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W2SD ENDIST BALTIMORE |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Y1AZ — CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $23.0M |
| Current contract value | $23.0M |
| Potential contract value / ceiling | $23.0M |
| Start date | Aug 24, 2021 |
| Current end date | Apr 21, 2026 |
| Potential end date | Apr 21, 2026 |
| Latest award activity | Apr 24, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 21 of 21 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Apr 24, 2026 | A00017 | $34.8K | CHANGE: AU TITLE: DSC-REVISED FORCE MAIN ALIGNMENT RFI 153 THE CONTRACTOR SHALL PROVIDE ALL ADDITIONAL LABOR, MATERIALS, AND EQUIPMENT REQUIRED TO INSTALL SEWER FORCE MAIN AS DETAILED IN REVISED ALIGNMENT DETAILED IN RFI 153. |
| Mar 27, 2026 | A00016 | $22.9K | CHANGE: AU TITLE: DSC-REVISED FORCE MAIN ALIGNMENT RFI 153 THE CONTRACTOR SHALL PROVIDE ALL ADDITIONAL LABOR, MATERIALS, AND EQUIPMENT REQUIRED TO INSTALL SEWER FORCE MAIN AS DETAILED IN REVISED ALIGNMENT DETAILED IN RFI 153. |
| Apr 25, 2025 | A00015 | $6.0K | CHG AT ANCHOR BOLT ENCLS. ENCLS SHALL MEET THE FOLLOWING REQS: A. THE TOP OF THE METAL ENCLOSURES SHALL BE DESIGNED AND CONSTRUCTED TO FACILITATE RAINWATER RUNOFF. B. NO SHARP EDGES. C. BE GALVANIZED AND PAINTED. |
| Nov 29, 2024 | A00014 | $-24.4K | URC DE-SCOPE IS. CRF014 PROVIDE A CREDIT FOR ALL LABOR, MATERIALS, EQUIPMENT, AND MARKUPS TO REMOVE THE SAW-CUT, DEMOLITION, AND REMOVAL OF CONCRETE CURB AND GUTTER AND BITUMINOUS PAVEMENT AT THE SOUTH SIDE OF THE LOD AREA FROM THE SCOPE OF WORK. |
| Nov 7, 2024 | P00003 | $0 | BASE |
| Nov 5, 2024 | P00002 | $595.3K | DESIGN AND CONSTRUCTION OF A NEW ACCESS CONTROL FACILITY (ACF) VISITOR CENTER (VC1) AT FORT MEADE, MD. |
| Apr 16, 2024 | A00013 | $0 | THIS MODIFICATION EXTENDS THE TIME FOR PERFORMANCE ALLOWED UNDER SPECIFICATION SECTION 01 14 00 FOR DELAYS CAUSED BY ADVERSE WEATHER IN EXCESS OF ANTICIPATED DURING THE PERIOD 01 DECEMBER 2023 THROUGH 31 DECEMBER 2023. THE FOLLOWING TABLE |
| Mar 22, 2024 | A00012 | $17.2K | URC LOBBY CHANGES CRF017 ITEM 1. PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT TO FURNISH AND INSTALL AN ADDITIONAL BANK OF 30 KEYED CELL PHONE LOCKERS NEXT TO THE PROPOSED 30 FLUSH-MOUNTED LOCKERS IN THE PRE-SCREENING ROOM (ROOM 100). THE |
| Feb 1, 2024 | A00011 | $59.7K | URC TEMPEST CHANGES CRF-008 THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO PERFORM THE FOLLOWING. A. INSTALL RF SHIELDING TO BOTH INTERIOR AND EXTERIOR WALLS OF THE MANAGERS OFFICE. THE SHIELDING SHALL |
| Jan 29, 2024 | A00010 | $34.1K | THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, LABOR, EQUIPMENT, AND DESIGN TO ACCOMPLISH THE FOLLOWING SCOPE OF WORK. PROVIDE A SCHEDULE FRAGNET FOR THIS WORK AND A DETAILED COST PROPOSAL. REFER TO RFI-0064 AND REQUEST FOR PROPOSAL FOR DESIGN-BUI |
| Jan 19, 2024 | A00009 | $0 | CONTRACTOR SHALL PROVIDE LABOR, MATERIAL AND EQUIPMENT TO EXTEND THE CONTRACT PERFORMANCE PERIOD IN CONNECTION WITH EXTENDED MANUFACTURING TIMES FOR THE ELECTRICAL GEAR AND SUPPLEMENTAL EQUIPMENT REQUIRED FOR THE COMPLETION OF THIS PR |
| Dec 8, 2023 | A00008 | $174.0K | URC BUS SHELTER POWER-DATA & BUS SHELTER CONTRACT FOR ACCESS CONTROL FACILITY (ACF) VISITOR CENTER 1 (VC1) AT FORT MEADE, MD. REFERENCE NO. R00008 AI URC BUS SHELTER POWER-DATA CRF-012 AL URC-011 DOOR HARDWARE CHANGES CRF011 |
| Jun 8, 2023 | A00007 | $335.1K | URC PARKING LOT CHANGES CRF-003 PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT FOR THE CHANGES IN SCOPE DEFINED BELOW. PARKING LOT CHANGES. REFER TO ATTACHMENTS A AND B FOR SITE PLANS. SCOPE INCLUDES: 1. ADDED WORK: PERFORM THE REQUIRED LIGHT POL |
| Mar 1, 2023 | A00006 | $28.8K | CONTRACTOR SHALL PROVIDE FOR THE PROCUREMENT OF ALL REQUIRED STATION LINK DEVICES, PREVIOUSLY IDENTIFIED AS GOVERNMENT FURNISHED PER CONTRACT RFP/SOW SECTION 01 10 00 PARAGRAPH 5.9.9.11.2 G. CHANGE FROM GOVERNMENT FURNISHED-CONTRACTOR INSTALLED (GFC |
| Dec 8, 2022 | A00005 | $-3.6K | REVISE PORTABLE EXTINGUISHERS PROVIDE ALL DESIGN, LABOR, MATERIALS, AND EQUIPMENT TO INSTALL SINGLE DRY-CHEMICAL PORTABLE FIRE EXTINGUISHERS AND CABINETS INSTEAD OF THE PAIRED H2O AND CO2 EXTINGUISHERS AND CABINETS SPECIFIED IN CURRENT CONTRACT RFP |
| Dec 5, 2022 | A00004 | $-22.3K | AJ URC-009 GUARD BOOTH MANNING CHANGES THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT TO CHANGE GUARD BOOTH MANNING FROM CONTRACTOR MANNING TO GOVERNMENT MANNING. ADDITIONALLY, THE CONTRACTOR SHALL PROVIDE THE COMMUNICA |
| Jul 13, 2022 | A00003 | $67.7K | URC N10 RAISED SIDEWALK CRF-004 ITEM 1. PROVIDE ALL DESIGN, MATERIALS, EQUIPMENT, AND LABOR TO INSTALL RAISED SIDEWALK, WITH NECESSARY CURB AND GUTTER) IN LIEU OF PAINTED CROSSWALK WITH DELINEATORS IN FRONT OF ALL NEW ADA PARKING SPACES. REFERENCE |
| Jun 21, 2022 | A00002 | $191.0K | CONTRACTOR SHALL PROVIDE FOR THE PROCUREMENT OF FOUR (4) BUS SHELTERS PREVIOUSLY IDENTIFIED AS GOVERNMENT FURNISHED PER CONTRACT RFP/SOW SECTION 01 10 00 SECTION 5.1.12.7.1. |
| May 12, 2022 | A00001 | $68.1K | URC-NEW PSAT FENCE CRF-001 PROVIDE ALL DESIGN, LABOR, MATERIALS AND EQUIPMENT TO REVISE PSAT FENCE TYPES AT ACF-VC1 IN ACCORDANCE WITH ATTACHED CRF-001 SITE PLANS. PROVIDE CREDIT FOR LABOR, MATERIALS AND EQUIPMENT FOR RFP |
| Oct 6, 2021 | P00001 | $0 | BASE |
| Aug 24, 2021 | 0 | $21.4M | BASE - ACF-VC1 |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.