Federal contract award
W912DR21C0023
RECAPITALIZATION OF POWER GENERATION PLANT AND SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA), LOCATED ON BUCKLEY AFB, CO
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W2SD ENDIST BALTIMORE |
| NAICS | 238210 — Electrical Contractors and Other Wiring Installation Contractors |
| PSC | Y1PZ — CONSTRUCTION OF OTHER NON-BUILDING FACILITIES |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $210.8M |
| Current contract value | $210.8M |
| Potential contract value / ceiling | $211.3M |
| Start date | Sep 30, 2021 |
| Current end date | Jan 27, 2027 |
| Potential end date | Jan 27, 2027 |
| Latest award activity | May 15, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 125 of 125 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 15, 2026 | A00111 | $83.9K | PER OSHA 29 CFR 1910.212(A)(1), INSTALL GUARDS ON THE EIGHT (8) SUPPLY FANS ON THE CPH MEZZANINE. THE GUARDS SHALL BE CUSTOM-FABRICATED BY THE FANS DISTRIBUTOR TO ACCOUNT FOR THEIR SPECIFIC SIZE. |
| May 6, 2026 | A00110 | $35.1K | THE AHJ HAS DETERMINED THAT THE CONTRACTOR SHALL INSTALL THE SHUNT TRIP DEVICE ON THE AC BREAKERS FEEDING THE BATTERY CHARGERS PER UFC 3-520-05 SECTION 2-6.1 THAT IS NOT SHOWN IN THE ISSUED FOR CONSTRUCTION DOCUMENTS. |
| May 4, 2026 | A00109 | $0 | THE AHJ HAS DETERMINED THAT THE CONTRACTOR SHALL INSTALL THE SHUNT TRIP DEVICE ON THE AC BREAKERS FEEDING THE BATTERY CHARGERS PER UFC 3-520-05 SECTION 2-6.1 THAT IS NOT SHOWN IN THE ISSUED FOR CONSTRUCTION DOCUMENTS. |
| Apr 23, 2026 | A00108 | $129.0K | THE AHJ HAS DETERMINED THAT THE CONTRACTOR SHALL INSTALL THE SHUNT TRIP DEVICE ON THE AC BREAKERS FEEDING THE BATTERY CHARGERS PER UFC 3-520-05 SECTION 2-6.1 THAT IS NOT SHOWN IN THE ISSUED FOR CONSTRUCTION DOCUMENTS. |
| Apr 21, 2026 | A00107 | $56.5K | THE AHJ HAS DETERMINED THAT THE CONTRACTOR SHALL INSTALL THE SHUNT TRIP DEVICE ON THE AC BREAKERS FEEDING THE BATTERY CHARGERS PER UFC 3-520-05 SECTION 2-6.1 THAT IS NOT SHOWN IN THE ISSUED FOR CONSTRUCTION DOCUMENTS. |
| Apr 14, 2026 | A00106 | $115.9K | R00127-1 DAY TANK VENTING |
| Apr 13, 2026 | P00020 | $333.6K | R00127-1 DAY TANK VENTING |
| Apr 3, 2026 | A00105 | $35.5K | TO MITIGATE RISK TO THE USERS FACILITY/EQUIPMENT, INTEGRATE LOAD CENTER LC-B494-15B PRIOR TO LC-B494-15A. THIS REQUIRES MODIFICATION OF THE SEL NETWORK SEQUENCE AND SCHWEITZER RELAYS TO ENSURE THAT LC-B494-15B IS INTEGRATED BEFORE LC-B494-15A. |
| Apr 2, 2026 | P00019 | $894.0K | INSTALL A 1/4-INCH PRESSURE-REDUCING VALVE TO REGULATE INLET PRESSURE TO THE DOSING CABINET SOLENOID VALVE AT 3-5 PSI. SET BACK-PRESSURE REGULATOR FULLY OPEN, CLOSE THE BYPASS TO MAINTAIN STEADY HEADER PRESSURE, AND CONTINUE VETTING REMAINING SYSTEM |
| Apr 1, 2026 | P00018 | $0 | INSTALL A 1/4-INCH PRESSURE-REDUCING VALVE TO REGULATE INLET PRESSURE TO THE DOSING CABINET SOLENOID VALVE AT 3-5 PSI. SET BACK-PRESSURE REGULATOR FULLY OPEN, CLOSE THE BYPASS TO MAINTAIN STEADY HEADER PRESSURE, AND CONTINUE VETTING REMAINING SYSTEM |
| Mar 5, 2026 | A00104 | $24.0K | INSTALL A 1/4-INCH PRESSURE-REDUCING VALVE TO REGULATE INLET PRESSURE TO THE DOSING CABINET SOLENOID VALVE AT 3-5 PSI. SET BACK-PRESSURE REGULATOR FULLY OPEN, CLOSE THE BYPASS TO MAINTAIN STEADY HEADER PRESSURE, AND CONTINUE VETTING REMAINING SYSTEM |
| Feb 24, 2026 | A00103 | $261.4K | BUILDING 494 VALVES REQUIRE 120V POWER AND IS NOT SHOWN WITHIN IFC. THIS CHANGE ADDS THE 120 VAC POWER TO THE VALVES WITHIN BUILDING 494 TO HAVE A WORKING SYSTEM. THE VALVE POWER SHALL RUN ALONG THE CONTROL WIRING THAT WAS OUTLINED WITHIN THE IFC. |
| Jan 12, 2026 | A00102 | $36.0K | ADDITION OF REDUNDANT FEED UTILIZING CHANGE OF POWER SOURCE AND PULLING THE CABLES TO THIS NEW FEED. THIS IS NECESSARY AS THE HMI FOR LOAD CENTER J REQUIRES TWO SEPARATE POWER SOURCES, BUT IFC DRAWINGS SHOW TWO PANELS FED FROM ONE POWER SOURCE. |
| Jan 5, 2026 | A00101 | $85.4K | SITE STANDARDS REQUIRE REDUNDANT POWER FED TO PLCS AT TFP-B494-01A/02A, BUT THERE IS NONE IN THE IFC DRAWINGS. REDUNDANT TECH POWER SOURCES FOR PLCS AT TFP-B494-01A/02A SHALL BE INSTALLED FROM TECH POWER PANEL CIRCUITS TPP-AA4:36 AND TPP-AB4:36. |
| Nov 14, 2025 | A00100 | $38.7K | CD-ADF-C, RECAP #3, BUCKLEY SFB, CO R00109 LOAD BANK TIE-IN BREAKER AT PPMV |
| Oct 28, 2025 | A00098 | $67.3K | CD - ADF-C RECAP #3, BUCKLEY SPACE FORCE BASE R001112 69 MILCON RACKS & PDC WALKWAYS GROUNDING |
| Oct 28, 2025 | A00099 | $35.3K | CD - ADF-C RECAP #3, BUCKLEY SPACE FORCE BASE R00108 MVS-PPMV-15A&B DC POWER |
| Oct 24, 2025 | A00097 | $92.1K | CD-ADF-C RECAP #3, BUCKLEY SFB, CO R00098 REVISIONS TO 69 MILCON TRANSFORMERS E AND W |
| Sep 29, 2025 | A00096 | $99.9K | CD - ADF-C RECAP #3, BUCKLEY SFB, CO R00110 CONDUCTORS TO FOP-PPMV-09&-10 |
| Sep 15, 2025 | A00095 | $0 | CD - ADF-C RECAP #3 BUCKLEY SFB, CO R00103-1 CORRECTION TO R00103/A000094 EXTEND GOV OC TRAILERS MODIFICATION |
| Sep 12, 2025 | A00094 | $227.4K | CD - ADF-C RECAP #3, BUCKLEY SFB, CO R00103 EXTEND GOV OC TRAILERS |
| Aug 25, 2025 | A00093 | $71.6K | CD - ADF-C RECAP #3, BUCKLEY SFB, CO R00101 LC-12-1 AND 12-2 ON GEN SIGNAL TO UPS |
| Aug 22, 2025 | A00092 | $51.0K | CD-ADF-C RECAP #3, BUCKLEY SFB, CO R00106 PDC-A RETAINING WALL |
| Jul 30, 2025 | A00091 | $48.3K | CD - ADF-C RECAP #3, BUCKLEY SFB, CO R00105 POWER TO SECURITY PANELS |
| Jul 25, 2025 | P00017 | $388.1K | ADF-C RECAP 3, BUCKLEY AFB. CO |
| Jun 24, 2025 | A00090 | $220.5K | CD-ADF-C RECAP #3, BUCKLEY SFB, CO R00100 TECH POWER FEEDERS INTO PDCS |
| May 19, 2025 | A00089 | $-46.0K | CD-ADF-C RECAP #3, BUCKLEY SFB, CO R00094 GUARDHOUSE CREDIT |
| May 2, 2025 | A00088 | $14.8K | CD-ADF-C RECAP #3, BUCKLEY SFB, CO R00096 KLAXON SOUNDER |
| Apr 30, 2025 | A00087 | $113.5K | CD - ADF-C RECAP #3 BUCKLEY SFB, CO R00095 INTERNAL PLCS ON LCS L,Q,S,G,H,B,E |
| Apr 24, 2025 | A00086 | $10.0K | CD - ADF-C RECAP #3, BUCKLEY SFB, CO R00097 MOP 25-0008-TPP-MCC1T ESCORTS |
| Apr 23, 2025 | P00016 | $175.0K | UPDATE CONTRACT DRAWINGS. |
| Apr 3, 2025 | P00015 | $0 | IMPLEMENTATION OF EXECUTIVE ORDERS 14148 AND 14173 |
| Mar 27, 2025 | A00085 | $60.2K | CD-RECAP #3 ADF-C, BUCKLEY SFB, CO R00091 PPMV FICS PLC LOCATION AND POWER |
| Mar 3, 2025 | A00083 | $55.6K | CD-RECAP #3-ADF-C, BUCKLEY SFB, CO R00089 UREA-02 PANEL |
| Mar 3, 2025 | A00084 | $20.4K | CD-RECAP #3, ADF-C, BUCKLEY SFB, CO R00093 G&H PANELMATE & CONTROL |
| Feb 12, 2025 | A00082 | $21.3K | CD-ADF-C RECAP #3, BUCKLEY SFB, CO R00090 GENERATOR CONTROL SYSTEM NETWORK |
| Feb 7, 2025 | A00081 | $-202.8K | CD-ADF-C RECAP #3, BUCKLEY SFB, CO R00080 CPH & ATO CONDUIT AND TERMINATIONS |
| Jan 30, 2025 | A00080 | $379.2K | CD-ADF-C RECAP #3, BUCKLEY SFB, CO R00086 CPH VALVE POWER |
| Jan 24, 2025 | A00079 | $-280.9K | CD-ADF-C RECAP #3, BUCKLEY SFB, CO R00084 MCC ARC RESISTANCE REQUIREMENT |
| Jan 23, 2025 | A00078 | $54.0K | CD-ADF-C RECAP #3, BUCKLEY SFB, CO R00088 PDC SECURITY |
| Jan 16, 2025 | A00077 | $38.5K | CD-RECAP 3 ADF-C, BUCKLEY SFB, CO R00085 MCCATS FICS NETWORK INTEGRATION |
| Dec 12, 2024 | A00076 | $11.5K | CD - RECAP 3, ADF-C, BUCKLEY SFB, CO R00079 DC POWER UPDATES 85-MILCON |
| Nov 25, 2024 | A00073 | $-224.7K | CD-RECAP 3 ADF-C, BUCKLEY SFB, CO R00044 VECP TVP TRANSFORMERS |
| Nov 25, 2024 | A00074 | $417.9K | CD - RECAP 3 ADF-C, BUCKLEY SFB, CO R00061 FEEDER REDESIGN TO BUILDING 460 |
| Nov 25, 2024 | A00075 | $76.1K | CD - RECAP 3 ADF-C, BUCKLEY SFB, CO R00083 FICS ESSENTIAL GEAR FOR LC EE, FF, GG, AD, AND K |
| Nov 19, 2024 | A00072 | $70.9K | CD - RECAP 3 ADF-C BUCKLEY SFB, CO R00082 AREA 8 UNFORESEEN CONDITIONS |
| Nov 13, 2024 | A00071 | $0 | CD - RECAP 3 ADF-C BUCKLEY SFB, CO R00087 FUNDING CORRECTION |
| Nov 12, 2024 | A00070 | $434.3K | CD-RECAP 3 ADF-C, BUCKLEY SFB, CO R00073 PROCESS PIPING DESIGN CHANGES |
| Oct 24, 2024 | A00068 | $17.5K | CD-RECAP 3 ADF-C, BUCKLEY SFB, CO R00072 85 MILCON DRYWALL REPAIR |
| Oct 24, 2024 | A00069 | $-95.9K | CD-RECAP 3 ADF-C, BUCKLEY SFB, CO R00078 DELETE CENTRAL UPS MANHOLES |
| Oct 22, 2024 | A00067 | $75.1K | CD-RECAP 3 ADF-C, BUCKLEY SFB, CO R00081 FCC ACTUATED VALVES POWER |
| Oct 21, 2024 | A00066 | $57.6K | CD - ADF-C RECAP 3, BUCKLEY SFB, CO R00068 FUEL OIL THERMAL RELIEF VALVES |
| Oct 17, 2024 | P00014 | $-748.6K | RECAP3 |
| Sep 13, 2024 | A00065 | $96.2K | CD-RECAP 3 ADF-C, BUCKLEY SFB, CO R00053 E-STOP CIRCUIT DESIGN |
| Sep 11, 2024 | A00064 | $24.7K | RECAPITALIZATION OF POWER GENERATION PLANT AND SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA), LOCATED ON BUCKLEY AFB, CO - CHANGE NITROGEN GENERATOR POWER AND CONTROLS |
| Aug 15, 2024 | A00063 | $226.4K | CD-RECAP 3 ADF-C, BUCKLEY SFB, CO R00047 DC POWER FOR LOAD CTRS FROM BLDG A&B |
| Aug 12, 2024 | A00062 | $20.1K | CD-RECAP 3 ADF-C, BUCKLEY SFB, CO R00074 REACH 40 & 41 DIFFERING SITE CONDITIONS |
| Aug 2, 2024 | A00061 | $27.4K | CD - ADF-C RECAP 3, BUCKLEY SFB, CO R00069 GEN. EXHAUST STACK RAIN MITIGATION |
| Aug 1, 2024 | A00060 | $18.7K | CD - ADF-C RECAP 3, BUCKLEY SFB, CO R00065 COMM MH1C ADJUSTMENT |
| Jul 31, 2024 | A00059 | $0 | CD - ADF-C RECAP #3, BUCKLEY SFB, CO R00071 MEDIUM VOLTAGE SWITCHGEAR SKIDS |
| Jul 29, 2024 | A00058 | $59.1K | CD-ADF-C RECAP 3, BUCKLEY SFB, CO R00033 2-STRAND TO 6-STRAND FOR GEN ANCILLARY NETWORK |
| Jul 22, 2024 | A00057 | $4.6K | CD-ADF-C RECAP 3 BUCKLEY SFB, CO R00075 NORTH UNLOADING STATION LIGHT POLE |
| Jul 3, 2024 | A00056 | $-71.4K | CD - ADF-C RECAP 3, BUCKLEY SFB, CO R00076 RGS GRC WITH EMT AT CPH AT OR BELOW 600V POWER |
| Jun 4, 2024 | A00055 | $29.1K | CD - RECAP 3, BUCKLEY SFB, CO R00070 - FICS - DEVICE LABELING HOT STANDBY ALARM LIGHT BUZZER |
| May 28, 2024 | A00054 | $-13.9K | CD-ADF-C RECAP #3, BUCKLEY SFB, CO R00048 DELETE MEZZANINE DOOR 147A |
| Apr 29, 2024 | A00052 | $156.6K | CD - ADF-C RECAP 3, BUCKLEY SFB, CO R00064 FUEL LINE D |
| Apr 29, 2024 | A00053 | $143.4K | CD- ADF-C RECAP 3, BUCKLEY SFB, CO R00066 FUEL LINE C SOUTH |
| Apr 26, 2024 | A00051 | $53.7K | CD - ADF-C RECAP 3, BUCKLEY SFB, CO R00067 FUEL LINE C NORTH |
| Apr 9, 2024 | A00050 | $42.6K | CD-ADF-C RECAP #3 BUCKLEY SFB, CO R00059 ADD 85 MILCON TO FICS NETWORK |
| Apr 8, 2024 | A00049 | $44.6K | CD - ADF-C RECAP #3, BUCKLEY SFB, CO R00021 FIRE WATER PIPE CHANGES |
| Apr 5, 2024 | A00047 | $16.7K | CD - ADF-C RECAP #3, BUCKLEY SFB, CO R00062 POWER TO FOP-PPMV-05 |
| Apr 5, 2024 | A00048 | $8.9K | CD-ADF-C RECAP #3, BUCKLEY SFB, CO R00050 BLDG 460 5KV SWGR BUS-5 PQM FICS INTEGRATION |
| Apr 3, 2024 | A00046 | $83.1K | CD - ADF-C RECAP 3, BUCKLEY SFB, CO R00055 EXISTING BUILDING CORE FIBER LOOP |
| Mar 11, 2024 | A00045 | $70.4K | CD - ADF-C RECAP 3, BUCKLEY SFB, CO R00049 SEL FEEDER PROTECTION RELAY LOGGING REVISIONS |
| Mar 5, 2024 | A00044 | $0 | CD - ADF-C RECAP 3 BUCKLEY SFB, CO R10057 CORRECTION TO ADD LC-PPMV-02_A&B & ATS-PPMV-03&04 TO FICS |
| Mar 4, 2024 | A00042 | $146.8K | CD - ADF-C RECAP 3, BUCKLEY SFB, CO R00037 XFMR AND PANEL ONE-LINE UPDATES |
| Mar 4, 2024 | A00043 | $44.7K | CD-ADF-C RECAP 3, BUCKLEY SFB, CO R00057 ADD LC-PPMV-02(A, B) & ATS-PPMV-(03,04) TO FICS |
| Feb 9, 2024 | A00041 | $127.4K | CD-ADF-C RECAP 3, BUCKLEY SFB, CO R00046 LVIP IMPACTS MAY THROUGH JUNE 2023 |
| Dec 12, 2023 | A00040 | $107.4K | CD-ADF-C RECAP 3 BUCKLEY SFB, CO R00042 PHASE 5 CABLE TRAY REVISION |
| Dec 11, 2023 | A00039 | $13.0K | CD-ADF-C RECAP 3, BUCKLEY SFB, CO R00043 FCC BUILDING ROOF ASSEMBLY |
| Dec 8, 2023 | A00038 | $-23.2K | CD - ADF-C RECAP 3, BUCKLEY SFB, CO R00045 REACH 8 & 10 REDESIGN |
| Nov 30, 2023 | P00013 | $237.1K | CD-ADF-C RECAP 3, BUCKLEY SFB, CO R00035 PROCESS PUMP REQUIREMENTS CHANGE |
| Oct 27, 2023 | A00030 | $45.8K | CD - ADF-C RECAP 3, BUCKLEY SFB, CO R00022 REACH 39 REDESIGN |
| Oct 13, 2023 | A00029 | $-466.4K | CD - RECAP 3 ADF-C BUCKLEY SFB, CO R00027 FICS EQUIPMENT TO GFE |
| Oct 12, 2023 | A00026 | $59.0K | CD - ADF-C RECAP 3, BUCKLEY SFB, CO R00040 BUILDING 201 NEUTRAL FEEDER |
| Oct 12, 2023 | A00027 | $23.0K | CD - ADF-C RECAP 3 BUCKLEY SFB, CO R00056 REACH 9A & LOAD BANK DUCT BANK RECONFIGURATION |
| Oct 12, 2023 | A00028 | $-8.2K | CD - RECAP 3 ADF-C, BUCKLEY SFB, CO R00052 FLOW FILL CAP REMOVAL |
| Oct 2, 2023 | A00025 | $-17.9K | CD - ADF-C RECAP 3, BUCKLEY SFB, CO R00051 VERTICAL PVC 90S |
| Sep 28, 2023 | P00012 | $2.5K | PHASE TWO CONSTRUCTION |
| Sep 20, 2023 | A00024 | $108.5K | CD - RECAP #3, BUCKLEY SFB, CO R00026 ZONE 2 GUARDHOUSE |
| Sep 19, 2023 | A00023 | $36.2K | CD - ADF-C RECAP 3, BUCKLEY SFB, CO R00030 PANEL UPSIZING FOR PANELS TPP-PPMV-A4/B4 |
| Sep 1, 2023 | A00022 | $16.3K | CD - ADF-C RECAP 3, BUCKLEY SFB, AURORA, CO R00031 GENERATOR EXHAUST PLENUM |
| Aug 31, 2023 | A00021 | $22.3K | CD - ADF-C RECAP 3 BUCKLEY SFB AURORA, CO R00023 UREA HEADER REDUNDANCY |
| Aug 21, 2023 | A00020 | $-76.3K | CD - ADF-C RECAP 3, BUCKLEY SFB, CO R00012 MANHOLE, CRANE POWER, LOCATE EXISTING UTILITIES |
| Aug 1, 2023 | A00019 | $152.3K | CD - ADF-C RECAP #3, BUCKLEY SFB, CO R00016 GEN RM PANEL RELOCATION & CAT6E TO FO |
| Jul 31, 2023 | A00018 | $39.7K | CD - ADF-C RECAP #3, BUCKLEY SFB, CO R00038 PURGE AIR CONTROL MODULE |
| Jul 19, 2023 | A00017 | $10.0K | CD - ADF-C RECAP #3, BUCKLEY SFB, CO R00024 HAND DIGGING TO MECHANICAL EXCAVATION R00034 SEWER LINE & LIFT STATION POTHOLING |
| Jul 17, 2023 | A00016 | $41.0K | CD - ADF-C RECAP #3, BUCKLEY SFB, CO R00029 UP-SIZE FTP FIBER CONDUIT |
| Jul 6, 2023 | A00015 | $59.3K | CD - ADF-C RECAP 3, BUCKLEY SFB, CO R00032 UG DUCTBANK GROUNDING |
| May 22, 2023 | A00014 | $70.1K | CD - ADF-C RECAP #3, BUCKLEY SFB, CO R00020 ADD WEATHER STATION, ADD MH TO UG TANKS |
| May 15, 2023 | A00013 | $-74.3K | CD - W912DR21C0023 RECAP 3, BUCKLEY SFB, AURORA, CO R00028 MH REMOVAL AND REACH 16-19, 47 AND 48 REDESIGN |
| Apr 26, 2023 | P00011 | $3.0M | RECAP3 CONSTRUCTION |
| Apr 18, 2023 | A00012 | $135.7K | CD - ADF-C RECAP #3, BUCKLEY SFB, CO R00017 REACH 9-17 PROFILE CHANGES |
| Feb 24, 2023 | A00010 | $353.4K | CD - ADF-C RECAP 3, BUCKLEY SFB, CO R00009 DESIGN REVISION 1 |
| Feb 24, 2023 | A00011 | $227.7K | CD - ADF-C RECAP 3, BUCKLEY SFB, CO R00008 RFIS 21, 54 & 57 |
| Feb 23, 2023 | P00010 | $20.2M | PHASE TWO CONSTRUCTION |
| Feb 9, 2023 | P00009 | $1.5M | PHASE TWO CONSTRUCTION |
| Jan 11, 2023 | A00009 | $114.2K | CD - ADF-C RECAP 3, BUCKLEY SFB, CO R00011 R-115,R-118 CONDUIT, TEMP CAMERA CIRCUIT |
| Dec 20, 2022 | A00008 | $180.0K | CD - ADF-C RECAP #3, BUCKLEY SFB, CO R00010 CPH UNDERGROUND RACEWAYS (NTE) |
| Dec 20, 2022 | P00008 | $238.6K | PHASE TWO CONSTRUCTION |
| Dec 7, 2022 | P00007 | $2.2M | PHASE TWO CONSTRUCTION |
| Nov 2, 2022 | A00007 | $-100.6K | CD - ADF-C RECAP #3, BUCKLEY SFB, CO R00003 MV FEEDER CABLES SIZES & SETS |
| Nov 1, 2022 | A00006 | $0 | CD - ADF-C RECAP #3, BUCKLEY SPF, CO R00019 EXCLUDE GOVERNMENT HOLIDAYS |
| Sep 8, 2022 | A00005 | $400.0K | CD - ADF-C RECAP #3, BUCKLEY SFB, CO R00015 CIVIL SUPPORT |
| Sep 1, 2022 | A00004 | $143.8K | CD - ADF-C RECAP #3, BUCKLEY SFB, CO R00007 ADDITIONAL SITE RADIOS |
| Aug 26, 2022 | A00003 | $138.6K | CD - ADF-C RECAP #3, BUCKLEY SFB, CO R00018 HVAC LOUVERS FINISH |
| Aug 25, 2022 | A00002 | $0 | CD - ADF-C RECAP #3, BUCKLEY SFB, CO R00014 MISSION DELAY DAYS 4-5 AUG 2022 |
| May 25, 2022 | P00006 | $1.6M | RECAP3, BUCKLEY, SFB |
| Apr 7, 2022 | A00001 | $0 | CD - ADF-C RECAP #3, BUCKLEY SFB, CO R00002 PROJECT MANAGEMENT SOFTWARE |
| Mar 14, 2022 | P00005 | $0 | RECAP3 |
| Feb 18, 2022 | P00004 | $775.0K | RECAP3, BUCKLEY SFB |
| Jan 27, 2022 | P00003 | $13.9M | PHASE FOUR CONSTRUCTION |
| Dec 23, 2021 | P00002 | $0 | EO14042 PHASE TWO CONSTRUCTION |
| Sep 30, 2021 | P00001 | $0 | PHASE TWO CONSTRUCTION |
| Aug 27, 2021 | 0 | $158.8M | RECAPITALIZATION OF POWER GENERATION PLANT AND SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA), LOCATED ON BUCKLEY AFB, CO |
Estimated positioning window
Nov 1, 2026 – Jan 30, 2027
65/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 65/100. Available recorded signals: 60 points.
- Contract end 2027-01-27 (87 days from calculation)
- +35 points
- 1 historical awards in this buyer and category group
- +0 points
- 125 recorded award transactions
- +10 points
- Latest award action: 2026-05-15
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.