Federal contract award

W912DR21C0023

RECAPITALIZATION OF POWER GENERATION PLANT AND SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA), LOCATED ON BUCKLEY AFB, CO

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW2SD ENDIST BALTIMORE
NAICS238210 — Electrical Contractors and Other Wiring Installation Contractors
PSCY1PZ — CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$210.8M
Current contract value$210.8M
Potential contract value / ceiling$211.3M
Start dateSep 30, 2021
Current end dateJan 27, 2027
Potential end dateJan 27, 2027
Latest award activityMay 15, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 125 of 125 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 15, 2026A00111$83.9KPER OSHA 29 CFR 1910.212(A)(1), INSTALL GUARDS ON THE EIGHT (8) SUPPLY FANS ON THE CPH MEZZANINE. THE GUARDS SHALL BE CUSTOM-FABRICATED BY THE FANS DISTRIBUTOR TO ACCOUNT FOR THEIR SPECIFIC SIZE.
May 6, 2026A00110$35.1KTHE AHJ HAS DETERMINED THAT THE CONTRACTOR SHALL INSTALL THE SHUNT TRIP DEVICE ON THE AC BREAKERS FEEDING THE BATTERY CHARGERS PER UFC 3-520-05 SECTION 2-6.1 THAT IS NOT SHOWN IN THE ISSUED FOR CONSTRUCTION DOCUMENTS.
May 4, 2026A00109$0THE AHJ HAS DETERMINED THAT THE CONTRACTOR SHALL INSTALL THE SHUNT TRIP DEVICE ON THE AC BREAKERS FEEDING THE BATTERY CHARGERS PER UFC 3-520-05 SECTION 2-6.1 THAT IS NOT SHOWN IN THE ISSUED FOR CONSTRUCTION DOCUMENTS.
Apr 23, 2026A00108$129.0KTHE AHJ HAS DETERMINED THAT THE CONTRACTOR SHALL INSTALL THE SHUNT TRIP DEVICE ON THE AC BREAKERS FEEDING THE BATTERY CHARGERS PER UFC 3-520-05 SECTION 2-6.1 THAT IS NOT SHOWN IN THE ISSUED FOR CONSTRUCTION DOCUMENTS.
Apr 21, 2026A00107$56.5KTHE AHJ HAS DETERMINED THAT THE CONTRACTOR SHALL INSTALL THE SHUNT TRIP DEVICE ON THE AC BREAKERS FEEDING THE BATTERY CHARGERS PER UFC 3-520-05 SECTION 2-6.1 THAT IS NOT SHOWN IN THE ISSUED FOR CONSTRUCTION DOCUMENTS.
Apr 14, 2026A00106$115.9KR00127-1 DAY TANK VENTING
Apr 13, 2026P00020$333.6KR00127-1 DAY TANK VENTING
Apr 3, 2026A00105$35.5KTO MITIGATE RISK TO THE USERS FACILITY/EQUIPMENT, INTEGRATE LOAD CENTER LC-B494-15B PRIOR TO LC-B494-15A. THIS REQUIRES MODIFICATION OF THE SEL NETWORK SEQUENCE AND SCHWEITZER RELAYS TO ENSURE THAT LC-B494-15B IS INTEGRATED BEFORE LC-B494-15A.
Apr 2, 2026P00019$894.0KINSTALL A 1/4-INCH PRESSURE-REDUCING VALVE TO REGULATE INLET PRESSURE TO THE DOSING CABINET SOLENOID VALVE AT 3-5 PSI. SET BACK-PRESSURE REGULATOR FULLY OPEN, CLOSE THE BYPASS TO MAINTAIN STEADY HEADER PRESSURE, AND CONTINUE VETTING REMAINING SYSTEM
Apr 1, 2026P00018$0INSTALL A 1/4-INCH PRESSURE-REDUCING VALVE TO REGULATE INLET PRESSURE TO THE DOSING CABINET SOLENOID VALVE AT 3-5 PSI. SET BACK-PRESSURE REGULATOR FULLY OPEN, CLOSE THE BYPASS TO MAINTAIN STEADY HEADER PRESSURE, AND CONTINUE VETTING REMAINING SYSTEM
Mar 5, 2026A00104$24.0KINSTALL A 1/4-INCH PRESSURE-REDUCING VALVE TO REGULATE INLET PRESSURE TO THE DOSING CABINET SOLENOID VALVE AT 3-5 PSI. SET BACK-PRESSURE REGULATOR FULLY OPEN, CLOSE THE BYPASS TO MAINTAIN STEADY HEADER PRESSURE, AND CONTINUE VETTING REMAINING SYSTEM
Feb 24, 2026A00103$261.4KBUILDING 494 VALVES REQUIRE 120V POWER AND IS NOT SHOWN WITHIN IFC. THIS CHANGE ADDS THE 120 VAC POWER TO THE VALVES WITHIN BUILDING 494 TO HAVE A WORKING SYSTEM. THE VALVE POWER SHALL RUN ALONG THE CONTROL WIRING THAT WAS OUTLINED WITHIN THE IFC.
Jan 12, 2026A00102$36.0KADDITION OF REDUNDANT FEED UTILIZING CHANGE OF POWER SOURCE AND PULLING THE CABLES TO THIS NEW FEED. THIS IS NECESSARY AS THE HMI FOR LOAD CENTER J REQUIRES TWO SEPARATE POWER SOURCES, BUT IFC DRAWINGS SHOW TWO PANELS FED FROM ONE POWER SOURCE.
Jan 5, 2026A00101$85.4KSITE STANDARDS REQUIRE REDUNDANT POWER FED TO PLCS AT TFP-B494-01A/02A, BUT THERE IS NONE IN THE IFC DRAWINGS. REDUNDANT TECH POWER SOURCES FOR PLCS AT TFP-B494-01A/02A SHALL BE INSTALLED FROM TECH POWER PANEL CIRCUITS TPP-AA4:36 AND TPP-AB4:36.
Nov 14, 2025A00100$38.7KCD-ADF-C, RECAP #3, BUCKLEY SFB, CO R00109 LOAD BANK TIE-IN BREAKER AT PPMV
Oct 28, 2025A00098$67.3KCD - ADF-C RECAP #3, BUCKLEY SPACE FORCE BASE R001112 69 MILCON RACKS & PDC WALKWAYS GROUNDING
Oct 28, 2025A00099$35.3KCD - ADF-C RECAP #3, BUCKLEY SPACE FORCE BASE R00108 MVS-PPMV-15A&B DC POWER
Oct 24, 2025A00097$92.1KCD-ADF-C RECAP #3, BUCKLEY SFB, CO R00098 REVISIONS TO 69 MILCON TRANSFORMERS E AND W
Sep 29, 2025A00096$99.9KCD - ADF-C RECAP #3, BUCKLEY SFB, CO R00110 CONDUCTORS TO FOP-PPMV-09&-10
Sep 15, 2025A00095$0CD - ADF-C RECAP #3 BUCKLEY SFB, CO R00103-1 CORRECTION TO R00103/A000094 EXTEND GOV OC TRAILERS MODIFICATION
Sep 12, 2025A00094$227.4KCD - ADF-C RECAP #3, BUCKLEY SFB, CO R00103 EXTEND GOV OC TRAILERS
Aug 25, 2025A00093$71.6KCD - ADF-C RECAP #3, BUCKLEY SFB, CO R00101 LC-12-1 AND 12-2 ON GEN SIGNAL TO UPS
Aug 22, 2025A00092$51.0KCD-ADF-C RECAP #3, BUCKLEY SFB, CO R00106 PDC-A RETAINING WALL
Jul 30, 2025A00091$48.3KCD - ADF-C RECAP #3, BUCKLEY SFB, CO R00105 POWER TO SECURITY PANELS
Jul 25, 2025P00017$388.1KADF-C RECAP 3, BUCKLEY AFB. CO
Jun 24, 2025A00090$220.5KCD-ADF-C RECAP #3, BUCKLEY SFB, CO R00100 TECH POWER FEEDERS INTO PDCS
May 19, 2025A00089$-46.0KCD-ADF-C RECAP #3, BUCKLEY SFB, CO R00094 GUARDHOUSE CREDIT
May 2, 2025A00088$14.8KCD-ADF-C RECAP #3, BUCKLEY SFB, CO R00096 KLAXON SOUNDER
Apr 30, 2025A00087$113.5KCD - ADF-C RECAP #3 BUCKLEY SFB, CO R00095 INTERNAL PLCS ON LCS L,Q,S,G,H,B,E
Apr 24, 2025A00086$10.0KCD - ADF-C RECAP #3, BUCKLEY SFB, CO R00097 MOP 25-0008-TPP-MCC1T ESCORTS
Apr 23, 2025P00016$175.0KUPDATE CONTRACT DRAWINGS.
Apr 3, 2025P00015$0IMPLEMENTATION OF EXECUTIVE ORDERS 14148 AND 14173
Mar 27, 2025A00085$60.2KCD-RECAP #3 ADF-C, BUCKLEY SFB, CO R00091 PPMV FICS PLC LOCATION AND POWER
Mar 3, 2025A00083$55.6KCD-RECAP #3-ADF-C, BUCKLEY SFB, CO R00089 UREA-02 PANEL
Mar 3, 2025A00084$20.4KCD-RECAP #3, ADF-C, BUCKLEY SFB, CO R00093 G&H PANELMATE & CONTROL
Feb 12, 2025A00082$21.3KCD-ADF-C RECAP #3, BUCKLEY SFB, CO R00090 GENERATOR CONTROL SYSTEM NETWORK
Feb 7, 2025A00081$-202.8KCD-ADF-C RECAP #3, BUCKLEY SFB, CO R00080 CPH & ATO CONDUIT AND TERMINATIONS
Jan 30, 2025A00080$379.2KCD-ADF-C RECAP #3, BUCKLEY SFB, CO R00086 CPH VALVE POWER
Jan 24, 2025A00079$-280.9KCD-ADF-C RECAP #3, BUCKLEY SFB, CO R00084 MCC ARC RESISTANCE REQUIREMENT
Jan 23, 2025A00078$54.0KCD-ADF-C RECAP #3, BUCKLEY SFB, CO R00088 PDC SECURITY
Jan 16, 2025A00077$38.5KCD-RECAP 3 ADF-C, BUCKLEY SFB, CO R00085 MCCATS FICS NETWORK INTEGRATION
Dec 12, 2024A00076$11.5KCD - RECAP 3, ADF-C, BUCKLEY SFB, CO R00079 DC POWER UPDATES 85-MILCON
Nov 25, 2024A00073$-224.7KCD-RECAP 3 ADF-C, BUCKLEY SFB, CO R00044 VECP TVP TRANSFORMERS
Nov 25, 2024A00074$417.9KCD - RECAP 3 ADF-C, BUCKLEY SFB, CO R00061 FEEDER REDESIGN TO BUILDING 460
Nov 25, 2024A00075$76.1KCD - RECAP 3 ADF-C, BUCKLEY SFB, CO R00083 FICS ESSENTIAL GEAR FOR LC EE, FF, GG, AD, AND K
Nov 19, 2024A00072$70.9KCD - RECAP 3 ADF-C BUCKLEY SFB, CO R00082 AREA 8 UNFORESEEN CONDITIONS
Nov 13, 2024A00071$0CD - RECAP 3 ADF-C BUCKLEY SFB, CO R00087 FUNDING CORRECTION
Nov 12, 2024A00070$434.3KCD-RECAP 3 ADF-C, BUCKLEY SFB, CO R00073 PROCESS PIPING DESIGN CHANGES
Oct 24, 2024A00068$17.5KCD-RECAP 3 ADF-C, BUCKLEY SFB, CO R00072 85 MILCON DRYWALL REPAIR
Oct 24, 2024A00069$-95.9KCD-RECAP 3 ADF-C, BUCKLEY SFB, CO R00078 DELETE CENTRAL UPS MANHOLES
Oct 22, 2024A00067$75.1KCD-RECAP 3 ADF-C, BUCKLEY SFB, CO R00081 FCC ACTUATED VALVES POWER
Oct 21, 2024A00066$57.6KCD - ADF-C RECAP 3, BUCKLEY SFB, CO R00068 FUEL OIL THERMAL RELIEF VALVES
Oct 17, 2024P00014$-748.6KRECAP3
Sep 13, 2024A00065$96.2KCD-RECAP 3 ADF-C, BUCKLEY SFB, CO R00053 E-STOP CIRCUIT DESIGN
Sep 11, 2024A00064$24.7KRECAPITALIZATION OF POWER GENERATION PLANT AND SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA), LOCATED ON BUCKLEY AFB, CO - CHANGE NITROGEN GENERATOR POWER AND CONTROLS
Aug 15, 2024A00063$226.4KCD-RECAP 3 ADF-C, BUCKLEY SFB, CO R00047 DC POWER FOR LOAD CTRS FROM BLDG A&B
Aug 12, 2024A00062$20.1KCD-RECAP 3 ADF-C, BUCKLEY SFB, CO R00074 REACH 40 & 41 DIFFERING SITE CONDITIONS
Aug 2, 2024A00061$27.4KCD - ADF-C RECAP 3, BUCKLEY SFB, CO R00069 GEN. EXHAUST STACK RAIN MITIGATION
Aug 1, 2024A00060$18.7KCD - ADF-C RECAP 3, BUCKLEY SFB, CO R00065 COMM MH1C ADJUSTMENT
Jul 31, 2024A00059$0CD - ADF-C RECAP #3, BUCKLEY SFB, CO R00071 MEDIUM VOLTAGE SWITCHGEAR SKIDS
Jul 29, 2024A00058$59.1KCD-ADF-C RECAP 3, BUCKLEY SFB, CO R00033 2-STRAND TO 6-STRAND FOR GEN ANCILLARY NETWORK
Jul 22, 2024A00057$4.6KCD-ADF-C RECAP 3 BUCKLEY SFB, CO R00075 NORTH UNLOADING STATION LIGHT POLE
Jul 3, 2024A00056$-71.4KCD - ADF-C RECAP 3, BUCKLEY SFB, CO R00076 RGS GRC WITH EMT AT CPH AT OR BELOW 600V POWER
Jun 4, 2024A00055$29.1KCD - RECAP 3, BUCKLEY SFB, CO R00070 - FICS - DEVICE LABELING HOT STANDBY ALARM LIGHT BUZZER
May 28, 2024A00054$-13.9KCD-ADF-C RECAP #3, BUCKLEY SFB, CO R00048 DELETE MEZZANINE DOOR 147A
Apr 29, 2024A00052$156.6KCD - ADF-C RECAP 3, BUCKLEY SFB, CO R00064 FUEL LINE D
Apr 29, 2024A00053$143.4KCD- ADF-C RECAP 3, BUCKLEY SFB, CO R00066 FUEL LINE C SOUTH
Apr 26, 2024A00051$53.7KCD - ADF-C RECAP 3, BUCKLEY SFB, CO R00067 FUEL LINE C NORTH
Apr 9, 2024A00050$42.6KCD-ADF-C RECAP #3 BUCKLEY SFB, CO R00059 ADD 85 MILCON TO FICS NETWORK
Apr 8, 2024A00049$44.6KCD - ADF-C RECAP #3, BUCKLEY SFB, CO R00021 FIRE WATER PIPE CHANGES
Apr 5, 2024A00047$16.7KCD - ADF-C RECAP #3, BUCKLEY SFB, CO R00062 POWER TO FOP-PPMV-05
Apr 5, 2024A00048$8.9KCD-ADF-C RECAP #3, BUCKLEY SFB, CO R00050 BLDG 460 5KV SWGR BUS-5 PQM FICS INTEGRATION
Apr 3, 2024A00046$83.1KCD - ADF-C RECAP 3, BUCKLEY SFB, CO R00055 EXISTING BUILDING CORE FIBER LOOP
Mar 11, 2024A00045$70.4KCD - ADF-C RECAP 3, BUCKLEY SFB, CO R00049 SEL FEEDER PROTECTION RELAY LOGGING REVISIONS
Mar 5, 2024A00044$0CD - ADF-C RECAP 3 BUCKLEY SFB, CO R10057 CORRECTION TO ADD LC-PPMV-02_A&B & ATS-PPMV-03&04 TO FICS
Mar 4, 2024A00042$146.8KCD - ADF-C RECAP 3, BUCKLEY SFB, CO R00037 XFMR AND PANEL ONE-LINE UPDATES
Mar 4, 2024A00043$44.7KCD-ADF-C RECAP 3, BUCKLEY SFB, CO R00057 ADD LC-PPMV-02(A, B) & ATS-PPMV-(03,04) TO FICS
Feb 9, 2024A00041$127.4KCD-ADF-C RECAP 3, BUCKLEY SFB, CO R00046 LVIP IMPACTS MAY THROUGH JUNE 2023
Dec 12, 2023A00040$107.4KCD-ADF-C RECAP 3 BUCKLEY SFB, CO R00042 PHASE 5 CABLE TRAY REVISION
Dec 11, 2023A00039$13.0KCD-ADF-C RECAP 3, BUCKLEY SFB, CO R00043 FCC BUILDING ROOF ASSEMBLY
Dec 8, 2023A00038$-23.2KCD - ADF-C RECAP 3, BUCKLEY SFB, CO R00045 REACH 8 & 10 REDESIGN
Nov 30, 2023P00013$237.1KCD-ADF-C RECAP 3, BUCKLEY SFB, CO R00035 PROCESS PUMP REQUIREMENTS CHANGE
Oct 27, 2023A00030$45.8KCD - ADF-C RECAP 3, BUCKLEY SFB, CO R00022 REACH 39 REDESIGN
Oct 13, 2023A00029$-466.4KCD - RECAP 3 ADF-C BUCKLEY SFB, CO R00027 FICS EQUIPMENT TO GFE
Oct 12, 2023A00026$59.0KCD - ADF-C RECAP 3, BUCKLEY SFB, CO R00040 BUILDING 201 NEUTRAL FEEDER
Oct 12, 2023A00027$23.0KCD - ADF-C RECAP 3 BUCKLEY SFB, CO R00056 REACH 9A & LOAD BANK DUCT BANK RECONFIGURATION
Oct 12, 2023A00028$-8.2KCD - RECAP 3 ADF-C, BUCKLEY SFB, CO R00052 FLOW FILL CAP REMOVAL
Oct 2, 2023A00025$-17.9KCD - ADF-C RECAP 3, BUCKLEY SFB, CO R00051 VERTICAL PVC 90S
Sep 28, 2023P00012$2.5KPHASE TWO CONSTRUCTION
Sep 20, 2023A00024$108.5KCD - RECAP #3, BUCKLEY SFB, CO R00026 ZONE 2 GUARDHOUSE
Sep 19, 2023A00023$36.2KCD - ADF-C RECAP 3, BUCKLEY SFB, CO R00030 PANEL UPSIZING FOR PANELS TPP-PPMV-A4/B4
Sep 1, 2023A00022$16.3KCD - ADF-C RECAP 3, BUCKLEY SFB, AURORA, CO R00031 GENERATOR EXHAUST PLENUM
Aug 31, 2023A00021$22.3KCD - ADF-C RECAP 3 BUCKLEY SFB AURORA, CO R00023 UREA HEADER REDUNDANCY
Aug 21, 2023A00020$-76.3KCD - ADF-C RECAP 3, BUCKLEY SFB, CO R00012 MANHOLE, CRANE POWER, LOCATE EXISTING UTILITIES
Aug 1, 2023A00019$152.3KCD - ADF-C RECAP #3, BUCKLEY SFB, CO R00016 GEN RM PANEL RELOCATION & CAT6E TO FO
Jul 31, 2023A00018$39.7KCD - ADF-C RECAP #3, BUCKLEY SFB, CO R00038 PURGE AIR CONTROL MODULE
Jul 19, 2023A00017$10.0KCD - ADF-C RECAP #3, BUCKLEY SFB, CO R00024 HAND DIGGING TO MECHANICAL EXCAVATION R00034 SEWER LINE & LIFT STATION POTHOLING
Jul 17, 2023A00016$41.0KCD - ADF-C RECAP #3, BUCKLEY SFB, CO R00029 UP-SIZE FTP FIBER CONDUIT
Jul 6, 2023A00015$59.3KCD - ADF-C RECAP 3, BUCKLEY SFB, CO R00032 UG DUCTBANK GROUNDING
May 22, 2023A00014$70.1KCD - ADF-C RECAP #3, BUCKLEY SFB, CO R00020 ADD WEATHER STATION, ADD MH TO UG TANKS
May 15, 2023A00013$-74.3KCD - W912DR21C0023 RECAP 3, BUCKLEY SFB, AURORA, CO R00028 MH REMOVAL AND REACH 16-19, 47 AND 48 REDESIGN
Apr 26, 2023P00011$3.0MRECAP3 CONSTRUCTION
Apr 18, 2023A00012$135.7KCD - ADF-C RECAP #3, BUCKLEY SFB, CO R00017 REACH 9-17 PROFILE CHANGES
Feb 24, 2023A00010$353.4KCD - ADF-C RECAP 3, BUCKLEY SFB, CO R00009 DESIGN REVISION 1
Feb 24, 2023A00011$227.7KCD - ADF-C RECAP 3, BUCKLEY SFB, CO R00008 RFIS 21, 54 & 57
Feb 23, 2023P00010$20.2MPHASE TWO CONSTRUCTION
Feb 9, 2023P00009$1.5MPHASE TWO CONSTRUCTION
Jan 11, 2023A00009$114.2KCD - ADF-C RECAP 3, BUCKLEY SFB, CO R00011 R-115,R-118 CONDUIT, TEMP CAMERA CIRCUIT
Dec 20, 2022A00008$180.0KCD - ADF-C RECAP #3, BUCKLEY SFB, CO R00010 CPH UNDERGROUND RACEWAYS (NTE)
Dec 20, 2022P00008$238.6KPHASE TWO CONSTRUCTION
Dec 7, 2022P00007$2.2MPHASE TWO CONSTRUCTION
Nov 2, 2022A00007$-100.6KCD - ADF-C RECAP #3, BUCKLEY SFB, CO R00003 MV FEEDER CABLES SIZES & SETS
Nov 1, 2022A00006$0CD - ADF-C RECAP #3, BUCKLEY SPF, CO R00019 EXCLUDE GOVERNMENT HOLIDAYS
Sep 8, 2022A00005$400.0KCD - ADF-C RECAP #3, BUCKLEY SFB, CO R00015 CIVIL SUPPORT
Sep 1, 2022A00004$143.8KCD - ADF-C RECAP #3, BUCKLEY SFB, CO R00007 ADDITIONAL SITE RADIOS
Aug 26, 2022A00003$138.6KCD - ADF-C RECAP #3, BUCKLEY SFB, CO R00018 HVAC LOUVERS FINISH
Aug 25, 2022A00002$0CD - ADF-C RECAP #3, BUCKLEY SFB, CO R00014 MISSION DELAY DAYS 4-5 AUG 2022
May 25, 2022P00006$1.6MRECAP3, BUCKLEY, SFB
Apr 7, 2022A00001$0CD - ADF-C RECAP #3, BUCKLEY SFB, CO R00002 PROJECT MANAGEMENT SOFTWARE
Mar 14, 2022P00005$0RECAP3
Feb 18, 2022P00004$775.0KRECAP3, BUCKLEY SFB
Jan 27, 2022P00003$13.9MPHASE FOUR CONSTRUCTION
Dec 23, 2021P00002$0EO14042 PHASE TWO CONSTRUCTION
Sep 30, 2021P00001$0PHASE TWO CONSTRUCTION
Aug 27, 20210$158.8MRECAPITALIZATION OF POWER GENERATION PLANT AND SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA), LOCATED ON BUCKLEY AFB, CO

Estimated positioning window

Nov 1, 2026 – Jan 30, 2027

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2027-01-27 (87 days from calculation)
+35 points
1 historical awards in this buyer and category group
+0 points
125 recorded award transactions
+10 points
Latest award action: 2026-05-15
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.