Federal contract award

W912DR23C0015

RENOVATION OF NOLAN BUILDING PHASE 4 AT FORT BELVOIR, VIRGINIA

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW2SD ENDIST BALTIMORE
NAICS236220 — Commercial and Institutional Building Construction
PSCY1JZ — CONSTRUCTION OF MISCELLANEOUS BUILDINGS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$107.5M
Current contract value$107.5M
Potential contract value / ceiling$107.5M
Start dateSep 29, 2023
Current end dateMay 5, 2027
Potential end dateMay 5, 2027
Latest award activityJun 5, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 37 of 37 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 5, 2026A00028$264.2KTHE CONSTRUCTION OF THE COMPLETE RENOVATION OF THE EXISTING 235,000 SF NOLAN BUILDING (BUILDING 2444).
May 26, 2026A00027$378.7KTHE CONSTRUCTION OF THE COMPLETE RENOVATION OF THE EXISTING 235,000 SF NOLAN BUILDING (BUILDING 2444).
Apr 17, 2026A00026$110.2KTHE CONSTRUCTION OF THE COMPLETE RENOVATION OF THE EXISTING 235,000 SF NOLAN BUILDING (BUILDING 2444).
Apr 10, 2026P00007$989.0KTHE CONSTRUCTION OF THE COMPLETE RENOVATION OF THE EXISTING 235,000 SF NOLAN BUILDING (BUILDING 2444).
Apr 1, 2026A00025$151.3KTHE CONSTRUCTION OF THE COMPLETE RENOVATION OF THE EXISTING 235,000 SF NOLAN BUILDING (BUILDING 2444).
Mar 9, 2026A00024$349.7KTHE CONSTRUCTION OF THE COMPLETE RENOVATION OF THE EXISTING 235,000 SF NOLAN BUILDING (BUILDING 2444).
Jan 28, 2026A00022$456.1KTHE CONSTRUCTION OF THE COMPLETE RENOVATION OF THE EXISTING 235,000 SF NOLAN BUILDING (BUILDING 2444).
Jan 28, 2026A00023$311.4KTHE CONSTRUCTION OF THE COMPLETE RENOVATION OF THE EXISTING 235,000 SF NOLAN BUILDING (BUILDING 2444).
Jan 15, 2026A00021$389.5KTHE CONSTRUCTION OF THE COMPLETE RENOVATION OF THE EXISTING 235,000 SF NOLAN BUILDING (BUILDING 2444).
Jan 7, 2026A00020$35.3KCHANGE CI REVISED L2 LOW ROOF TOP SLAB MIX AND REINFORCEMENT
Dec 12, 2025A00019$362.9KCHANGE CF REVISED L1 TOP SLAB MIX AND REINF
Sep 30, 2025A00018$67.9KTO INCORPORATE CHANGES CD AND BE INTO INSCOM PHASE 4 RENOVATION, FORT BELVOIR, VA
Sep 30, 2025P00006$575.7KU.S. ARMY INTELLIGENCE AND SECURITY COMMAND NOLAN BUILDING CONSTRUCTION
Sep 29, 2025P00005$1.1MU.S. ARMY INTELLIGENCE AND SECURITY COMMAND NOLAN BUILDING CONSTRUCTION
Sep 25, 2025A00017$372.2KTO INCORPORATE CHANGES BA, BQ AND CC INTO INSCOM PHASE 4 RENOVATION, FORT BELVOIR, VA
Sep 23, 2025A00016$310.7KTO INCORPORATE CHANGE BU (REVISED ROOF TOPPING SLAB MIX & REINFORCEMENT) INTO INSCOM PHASE 4 RENOVATION, FORT BELVOIR, VA
Sep 22, 2025A00015$151.5KTO INCORPORATE CHANGE CB (NEW DUCT OPENINGS IN 1ST FLOOR FAN ROOMS) INTO INSCOM PHASE 4 RENOVATION, FORT BELVOIR, VA
Sep 18, 2025A00014$258.8KTO INCORPORATE CHANGE BY INTO INSCOM PHASE 4 RENOVATION, FORT BELVOIR, VA
Sep 16, 2025P00004$559.2KRENOVATION OF SAOF BUILDING
Sep 12, 2025A00013$499.3KTO INCORPORATE CHANGE BZ INTO INSCOM PHASE 4 RENOVATION, FORT BELVOIR, VA
Sep 8, 2025A00012$180.8KTO INCORPORATE CHANGES AR, BG, BO AND BT INTO INSCOM PHASE 4 RENOVATION, FORT BELVOIR, VA
Sep 3, 2025A00011$202.3KTO INCORPORATE CHANGES AV, AW, AY, BD, BR, BV AND BW INTO INSCOM PHASE 4 RENOVATION, FORT BELVOIR, VA
Aug 21, 2025P00003$5.8MRENOVATION OF SAOF BUILDING
Jun 24, 2025A00010$212.2KTO INCORPORATE CHANGE AN (ELEVATOR JACKS REPLACEMENT) INTO INSCOM PHASE 4 RENOVATION, FORT BELVOIR, VA
Jun 16, 2025A00009$295.0KTO INCORPORATE CHANGE AS (REPLACE GRATING SUPPORT) INTO INSCOM PHASE 4 RENOVATION, FORT BELVOIR, VA
Apr 23, 2025PK0001$0EXECUTIVE ORDER 14148 AND 14173
Apr 3, 2025A00008$176.3KTO INCORPORATE CHANGE AM (ALTERNATE POWER TO USB RISERS) INTO INSCOM PHASE 4 RENOVATION, FORT BELVOIR, VA
Apr 2, 2025A00007$66.0KTO INCORPORATE CHANGES AO (CENTRAL PLANT ETR INTAKE LOUVER DAMPER), AT (BEULAH STREET FENCING CHANGES), AND AU (DEMO CONCRETE PLATFORMS).
Mar 28, 2025A00006$405.6KTO INCORPORATE CHANGE BI (PH-04 CHILLED WATER SHUT OFF DELAY) INTO RENOVATION OF INSCOM PHASE 4, FORT BELVOIR, VA
Mar 19, 2025A00005$241.4KTO INCORPORATE CHANGE AK (STORM/SANITARY/VENT PIPING RE-ROUTING) INTO RENOVATION OF INSCOM PHASE 4, FORT BELVOIR, VA
Feb 27, 2025A00004$30.9KTO INCORPORATE CHANGE AP (L2 TOPPING SLAB SOUTHEAST ELEVATION) INTO RENOVATION OF INSCOM PHASE 4, FORT BELVOIR, VA
Dec 16, 2024A00003$134.6KTO INCORPORATE CHANGE AL INTO RENOVATION OF INSCOM PHASE IV, FORT BELVOIR, VA
Dec 9, 2024A00002$5.6KTO INCORPORATE CHANGE AF INTO RENOVATION OF INSCOM PHASE IV, FORT BELVOIR, VA
Sep 23, 2024A00001$292.8KTO INCORPORATE CHANGES AA - AD & AG - AJ INTO RENOVATION OF INSCOM PHASE IV, FORT BELVOIR, VA
Sep 5, 2023P00002$0RENOVATION OF NOLAN BUILDING AT FORT BELVOIR, VA. NOTICE TO PROCEED MODIFICATION.
Aug 15, 2023P00001$0RENOVATION OF SAOF NOLAN BUILDING PHASE 4 - MODIFICATION TO UPDATE ACCOUNTING INFORMATION ON CLINS
Aug 11, 20230$90.6MRENOVATION OF NOLAN BUILDING PHASE 4 AT FORT BELVOIR, VIRGINIA

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
80/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 80/100. Available recorded signals: 75 points.

Contract end 2027-05-05 (192 days from calculation)
+35 points
39 historical awards in this buyer and category group
+15 points
37 recorded award transactions
+10 points
Latest award action: 2026-06-05
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.