Federal contract award
W912DR23C0017
UNACCOMPANIED ENLISTED PERSONNEL HOUSING (UEPH) BARRACKS REPLACEMENT, FORT. MEADE, MARYLAND
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W2SD ENDIST BALTIMORE |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Y1FC — CONSTRUCTION OF TROOP HOUSING FACILITIES |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $86.7M |
| Current contract value | $86.7M |
| Potential contract value / ceiling | $86.7M |
| Start date | May 31, 2023 |
| Current end date | Mar 19, 2026 |
| Potential end date | Mar 19, 2026 |
| Latest award activity | Mar 23, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 24 of 24 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 11, 2026 | A00022 | $206.5K | MULTIPLE CHANGES |
| Mar 23, 2026 | A00021 | $337.2K | A. SCOPE OF WORK CHANGE AR: CHANGE TO MASONRY CAVITY (RFI-164)CHANGE BI: CORDED WINDOW BLINDS DISCONTINUEDCHANGE BK: EXPOSED COLUMN AT CORRIDOR (RFI-0233)CHANGE BL: EXISTING CRACKED TERRACOTTA STORM DRAINCHANGE BO: DESIGN REVIEW REPORT-ASI#03 |
| Feb 11, 2026 | A00020 | $336.1K | A. SCOPE OF WORK CHANGE AR: CHANGE TO MASONRY CAVITY (RFI-164)CHANGE BI: CORDED WINDOW BLINDS DISCONTINUEDCHANGE BK: EXPOSED COLUMN AT CORRIDOR (RFI-0233)CHANGE BL: EXISTING CRACKED TERRACOTTA STORM DRAINCHANGE BO: DESIGN REVIEW REPORT-ASI#03 |
| Nov 12, 2025 | A00019 | $35.6K | UNFORESEEN PIPE IN STORM POND (RFI 196) CONTRACT FOR UEPH PHASE 1 REFERENCE NO. R00019 |
| Oct 23, 2025 | A00018 | $17.8K | BGE ACCESS RD ADD CONCRETE/REINFORCEMENT CONTRACT FOR UEPH PHASE 1 REFERENCE NO. R00018 |
| Sep 15, 2025 | A00017 | $41.1K | TIA #02 EAST BARRACKS SOFT SOILS CONTRACT FOR UEPH PHASE 1 REFERENCE NO. R00017 |
| Sep 9, 2025 | A00016 | $48.3K | TELECOM OUTLET REVISIONS (RFI 334/341) CONTRACT FOR UEPH PHASE 1 REFERENCE NO. R00016 |
| Sep 2, 2025 | A00015 | $57.9K | CHANGES AY AZ CONTRACT FOR UEPH PHASE 1 REFERENCE NO. R00015 |
| Aug 12, 2025 | A00014 | $165.3K | CONTRACT FOR UEPH PHASE 1 REFERENCE NO. R00014 |
| May 30, 2025 | A00013 | $244.5K | PANEL WALL ABUTTING CONNECTION CONTRACT FOR UEPH PHASE 1 REFERENCE NO. R00013 |
| Apr 22, 2025 | A00012 | $0 | WEATHER TIME EXTENSION -JANUARY 2025 CONTRACT FOR UEPH PHASE 1 REFERENCE NO. R00012 |
| Apr 11, 2025 | A00011 | $338.6K | CHANGE TO BRICK 1 AND BRICK 2 COLORS CONTRACT FOR UEPH PHASE 1 REFERENCE NO. R00011 |
| Apr 9, 2025 | A00010 | $374.6K | ADD TEMPORARY BYPASS FOR SEWER REMOVAL CONTRACT FOR UEPH PHASE 1 REFERENCE NO. R00010 |
| Mar 18, 2025 | A00009 | $0 | WEATHER TIME EXTENSION -SEPT 24 & DEC 24 CONTRACT FOR UEPH PHASE 1 REFERENCE NO. R00009 |
| Mar 5, 2025 | A00008 | $283.3K | TIA #04 DOOR REVISIONS ASI-02 CONTRACT FOR UEPH PHASE 1 REFERENCE NO. R00008 |
| Feb 3, 2025 | A00007 | $78.2K | CONTRACT FOR UEPH BARRACKS REPLACEMENT PHASE 1. REFERENCE NO. R00007. CHANGES AC AG AI AN AO. CONTRACT AMOUNT INCREASED BY $78,184.68. NO SCHEDULE CHANGE. HARD COPY SIGNED BY ANDRES ALVAREZ, PROJECT EXECUTIVE AND BY CEDRIC V. BAZEMORE, USACE ACO |
| Nov 4, 2024 | A00006 | $13.3K | CHILLER UNIT PER RFI#0007 CONTRACT FOR UEPH PHASE 1. REFERENCE NO. R00006 AA CHILLER UNIT PER RFI#0007 SEE PAGE 2. |
| Sep 19, 2024 | A00005 | $12.3K | REPLACE MATERIALS IN ACCORDANCE WITH BAA CONTRACT FOR UEPH PHASE 1. REFERENCE NO. R00005 AT REPLACE MATERIALS IN ACCORDANCE WITH BAA SEE PAGE 2. |
| Aug 7, 2024 | A00004 | $333.1K | CONTRACTOR SHALL BE COMPENSATED FOR THE DIFFERENCE BETWEEN THE BID RFP WAGE DETERMINATION (MD20220039 DATED 10/07/2022) AND THE AWARD WAGE DETERMINATION (MD20230039, DATED 06/02/2023). |
| Jul 12, 2024 | A00003 | $1.1K | UNFORESEEN CONCRETE PAD PER RFI-037 CONTRACT FOR UEPH PHASE 1. REFERENCE NO. R00003 AB UNFORESEEN CONCRETE PAD PER RFI-037 |
| May 23, 2024 | A00002 | $31.8K | CONT FOR UEPH BARRACKS REPLACEMENT PHASE 1. REF NO. R00002. AF-1 REMOVE AND REP SMH-1. CONT AMT INCREASED BY $31,830.56. NO SCHED CHANGE. RMS HARD COPY WAS SIGNED BY ANDRES ALVAREZ, PROJ EXEC ON 6 MAY 2024 AND ACCEPTED BY C. BAZEMORE, USACE ACO. |
| Apr 17, 2024 | A00001 | $0 | CONTRACT FOR UEPH BARRACKS REPLACEMENT PHASE 1. REFERENCE NO. R00001. AD WEATHER TIME EXT JAN 24 TO JAN 24. NO CONTRACT AMOUNT INCREASE. PERFORMANCE PD EXTENDED BY 7 DAYS. RMS HARD COPY FOR THIS UNILATERAL ACTION WAS SIGNED BY C. BAZEMORE, USACE ACO. |
| Aug 15, 2023 | P00001 | $0 | NOTICE TO PROCEED, UEPH BARRACKS REPLACEMENT, FT. MEADE, MD |
| Jun 9, 2023 | 0 | $83.8M | UNACCOMPANIED ENLISTED PERSONNEL HOUSING (UEPH) BARRACKS REPLACEMENT, FORT. MEADE, MARYLAND |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.