| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W2SD ENDIST NEW YORK |
| NAICS | 237990 — Other Heavy and Civil Engineering Construction |
| PSC | Y1PZ — CONSTRUCTION OF OTHER NON-BUILDING FACILITIES |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $35.2M |
| Current contract value | $35.2M |
| Potential contract value / ceiling | $35.7M |
| Start date | Sep 30, 2019 |
| Current end date | Dec 30, 2027 |
| Potential end date | Dec 30, 2027 |
| Latest award activity | Jun 3, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 34 of 34 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 3, 2026 | A00027 | $80.3K | GREEN BROOK SEGMENT C1, BOROUGH OF MIDDLESEX, NEW JERSEY |
| Apr 14, 2026 | P00006 | $1.2M | GREEN BROOK SEGMENT C1, BOROUGH OF MIDDLESEX, NEW JERSEY |
| Jan 5, 2026 | P00005 | $1.7M | GREEN BROOK SEGMENT C1, BOROUGH OF MIDDLESEX, NEW JERSEY |
| Sep 15, 2025 | A00026 | $93.0K | FLOODWALL A00026/NS062 - MATERIAL MOBILIZATION |
| May 16, 2024 | A00025 | $153.6K | FLOODWALL REFERENCE NO: A00025, R00031 NS058 COMPLETION DATE EXTENSION 2024-2025 |
| May 2, 2024 | A00024 | $42.0K | FLOODWALL REFERENCE NO: A00024, R00030 NS055 R2 CONCRETE DISCHARGE STRUCTURE LID. |
| Apr 19, 2024 | A00023 | $7.2K | FLOODWALL A00023, R00029 NS056 USACE FIELD OFFICE |
| Apr 10, 2024 | A00022 | $205.0K | FLOODWALL REFERENCE NO: A00022, R00028 NS057 TREE REMOVAL AT S. LINCOLN BRIDGE |
| Apr 9, 2024 | A00021 | $227.5K | FLOODWALL REFERENCE NO: A00021, R00027 NS052- CONTRACT COMPLETION DATE EXTENSION NS053- DEBRIS AT 963 LINCOLN BLVD & DINER |
| Apr 3, 2024 | A00020 | $54.5K | FLOODWALL REFERENCE NO: A00020, R00026 NS049 JERSEY BARRIERS & DS#4 CHANGES |
| Mar 26, 2024 | A00019 | $38.1K | FLOODWALL REFERENCE NO: A00019, R00025 NS047 2022 GRASS MAINTENANCE NS048 STEM EXTENSION |
| Mar 15, 2024 | A00018 | $230.0K | FLOODWALL REFERENCE NO: A00018, R00024 NS040 COMPLETION DATE CHANGE |
| Mar 3, 2024 | A00017 | $280.2K | FLOODWALL REFERENCE NO: A00017, R00023 NS042 817 DRAKE DEMO NS046 ASBESTOS ABATEMENT AT 817 DRAKE |
| Feb 29, 2024 | A00016 | $355.0K | FLOODWALL REFERENCE NO: A00016, R00022 NS035 RIP RAP AT CULVERT SOUTH SIDE NS045 VOORHEES UST SITE TESTING |
| Dec 20, 2023 | A00015 | $284.9K | FLOODWALL |
| Apr 19, 2022 | A00014 | $456.6K | FLOODWALL REFERENCE NO: A00014, R00020, NS018 PIPING CHANGES NEAR SOUTH AVE., NS031 8 MARSHALL DEMO, NS032 KRUGGERAND TREE REMOVAL, NS037 ASBESTOS ABATEMENT @ BLDG. DEMOS |
| Dec 15, 2021 | A00013 | $409.2K | REFERENCE NO. R00018 NS028 FENCES CHANGES NS030 VORHEES, DAYTON, E. WILSON DEMOS NS033 RAILROAD STOP LOG CLOSURE GATE REPAIRS |
| Oct 1, 2021 | A00012 | $300.0K | REFERENCE NO. R00017 NS021 CULVERT DIFFERING SITE AND IMPACT COSTS |
| Aug 23, 2021 | A00011 | $13.0K | REFERENCE NO. R00015 NS020 DEMO REMAINING STRUCTURES- 174 S LINCOLN |
| Aug 19, 2021 | A00010 | $58.7K | REFERENCE NO. R00016 NS023 SURVEY & DELINEATION KRUGGERAND PROPERTY NS024 MAINTENANCE OF PURCHASED PROPERTIES NS026 ADDITIONAL I-9 AT RAILROAD TRACKS NS027 INCREASED HEIGHT PS DISCHARGE CHAMBER |
| Aug 16, 2021 | A00009 | $59.0K | REFERENCE NO. R00014 NS019 CONCRETE DEBRIS REMOVAL - ADDITIONAL |
| Mar 5, 2021 | A00008 | $-62.0K | REFERENCE NO. R00012 NS013 CURVED FLOODWALL SHEETING |
| Feb 18, 2021 | A00006 | $99.0K | REFERENCE NO. R00010 NS012 DEMO 500 EDWARDS AVE |
| Feb 18, 2021 | A00007 | $353.2K | REFERENCE NO. R00011 NS008 STORMWATER DRAINAGE AT SANTELLI PROPERTY NS016 TREE REMOVAL NEAR NJ TRANSIT CULVERT NS017 CULVERT OPENING AND FENCING |
| Feb 18, 2021 | P00004 | $7.8M | THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTIONS 0010AA, 0010AB, 0010AC AND 0012. |
| Feb 17, 2021 | A00003 | $85.0K | REFERENCE NO. R00006 NS006 ELECTRICAL CONDUIT |
| Feb 17, 2021 | A00004 | $13.4K | REFERENCE NO. R00007 NS009 TREE REMOVAL NS011 MANHOLES FOR DRAINAGE STRUCTURE #5 |
| Feb 17, 2021 | A00005 | $94.5K | REFERENCE NO. R00008 NS014 CONCRETE DEBRIS REMOVAL |
| Feb 13, 2021 | A00002 | $5.0K | REFERENCE NO. R00005 NS005 GRASS CUTTING |
| Aug 6, 2020 | P00003 | $7.8M | FLOODWALL FOR GREEN BROOK |
| May 29, 2020 | A00001 | $3.2K | FLOODWALL REFERENCE NO.: A00001, R00002 NS004 147 LEE DRIVE SHED REPLACEMENT |
| Mar 6, 2020 | P00002 | $525.2K | FLOODWALL EXERCISING CLINS 0013AA AND 0013AB. |
| Jan 23, 2020 | P00001 | $0 | TO INCLUDE TOTALS SECTION FOR FLOODWALL CONTRACT. |
| Sep 30, 2019 | 0 | $12.2M | CONSTRUCTION OF GREEN BROOK FLOOD CONTROL PROJECT SEGMENT C1 |
Estimated positioning window
Dec 30, 2026 – Jun 30, 2027
70/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 70/100. Available recorded signals: 65 points.
- Contract end 2027-12-30 (431 days from calculation)
- +25 points
- 4 historical awards in this buyer and category group
- +15 points
- 34 recorded award transactions
- +10 points
- Latest award action: 2026-06-03
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.