Federal contract award

W912DS22C0003

ROCKAWAY CONTRACT 2

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW2SD ENDIST NEW YORK
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCY1KZ — CONSTRUCTION OF OTHER CONSERVATION AND DEVELOPMENT FACILITIES
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$235.5M
Current contract value$235.5M
Potential contract value / ceiling$239.8M
Start dateNov 16, 2021
Current end dateSep 29, 2026
Potential end dateSep 29, 2026
Latest award activityMar 20, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 10 of 10 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Mar 20, 2026A00004$69.3KTHE WORK INCLUDES DREDGING, BEACH FILL PLACEMENT, EXCAVATION, STOCKPILING AND REGRADING, PLANTING, REMOVAL AND DISPOSAL OF DEBRIS AND TIMBER PILES, CONSTRUCTION OF VARIOUS PEDESTRIAN AND VEHICULAR DUNE CROSS OVER STRUCTURES.
Mar 18, 2026P00016$349.8KTO PREVENT SAND MIGRATION UNDER THE BOARDWALK, A REINFORCED CAP SHALL BE INSTALLED AT THE EDGE OF THE BOARDWALK AS PER THE SOW.
Mar 18, 2026P00017$181.6KPROVIDE TEMPORARY CROSSOVERS TO THE BEACH AS PER THE SOW.
Jan 22, 2026P00014$272.4KA. SCOPE OF WORK THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, OVERHEAD, PROFIT, BOND, AND INSURANCEREQUIRED TO CHANGE THE LAYOUT OF THE EXISTING BEACH MOBI MAT LOCATED AT B149TH STREET. THE MAT SHALL FOLLOW THE PATH ADJACENT TO THE
Dec 17, 2025P00013$0A. SCOPE OF WORK THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, OVERHEAD, PROFIT, BOND, AND INSURANCEREQUIRED TO CHANGE THE LAYOUT OF THE EXISTING BEACH MOBI MAT LOCATED AT B149TH STREET. THE MAT SHALL FOLLOW THE PATH ADJACENT TO THE
Dec 15, 2025P00012$0A. SCOPE OF WORK THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, OVERHEAD, PROFIT, BOND, AND INSURANCEREQUIRED TO CHANGE THE LAYOUT OF THE EXISTING BEACH MOBI MAT LOCATED AT B149TH STREET. THE MAT SHALL FOLLOW THE PATH ADJACENT TO THE
Nov 18, 2025P00010$-1.2M50-FOOT BUFFER FROM A SUBSURFACE NATIONAL GRID GAS MAIN
Nov 18, 2025P00011$0EXTEND PERFORMANCE PERIOD TO 02 APRIL 2026
Apr 16, 2025A00003$24.9KMOD A00003 - REA WESTERN TAPER
Oct 10, 2024P00009$491.9KDREDGING ROCKAWAY, NEW YORK CONTRACT 2

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.