Federal contract award

W912DS25C0001

PORT MONMOUTH FLOOD REDUCTION PROJECT

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW2SD ENDIST NEW YORK
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCY1PZ — CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$71.2M
Current contract value$71.2M
Potential contract value / ceiling$72.6M
Start dateNov 21, 2024
Current end dateJan 28, 2028
Potential end dateJan 28, 2028
Latest award activityJun 12, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 15 of 15 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 12, 2026P00004$1.5MRFP-0019 (NS#023), BROADWAY AVENUE DRAINAGE CONCRETE CULVERT CONCRETE ENCASEMENT IS NEEDED DUE TO LACK OF COVER IN THE ROADWAY CROSSING AT BROADWAY IN PORT MONMOUTH.
May 12, 2026P00003$400.0KRFP-0019 (NS#023), BROADWAY AVENUE DRAINAGE CONCRETE CULVERT CONCRETE ENCASEMENT IS NEEDED DUE TO LACK OF COVER IN THE ROADWAY CROSSING AT BROADWAY IN PORT MONMOUTH.
Apr 24, 2026A00010$35.2KRFP-0019 (NS#023), BROADWAY AVENUE DRAINAGE CONCRETE CULVERT CONCRETE ENCASEMENT IS NEEDED DUE TO LACK OF COVER IN THE ROADWAY CROSSING AT BROADWAY IN PORT MONMOUTH.
Apr 9, 2026P00002$3.6MCAMPBELL AVENUE BRIDGE POLES AND WIRE TO BE REMOVED UP UNTIL JC2840MDT (RFP0017 PART2) 215881A55986 AND JC2840MDT TO BE DEADENED AND GUYED FOR DURATION OF CONSTRUCTION.POST CONSTRUCTION REQUIRES NEW POLES TO BE PLACED FOR JC-243MDT AND BT40189MDT
Apr 2, 2026A00009$431.6KCAMPBELL AVENUE BRIDGE POLES AND WIRE TO BE REMOVED UP UNTIL JC2840MDT (RFP0017 PART2) 215881A55986 AND JC2840MDT TO BE DEADENED AND GUYED FOR DURATION OF CONSTRUCTION.POST CONSTRUCTION REQUIRES NEW POLES TO BE PLACED FOR JC-243MDT AND BT40189MDT
Mar 31, 2026A00008$246.2KJCPL MATERIALS FOR PRIMARY RE-LOCATIONS REQUIRED TO SUPPLY POWER TO ROUTE 36 COMMERCIAL PROPERTY FOR FLOODWALL CONSTRUCTION ACCESS AT CAMPBELL AVENUE.JCPL WILL PROVIDE ALL MATERIALS DIRECTLY FOR THIS WORK.
Mar 13, 2026A00007$223.9KJCPL MATERIALS FOR PRIMARY RE-LOCATIONS REQUIRED TO SUPPLY POWER TO ROUTE 36 COMMERCIAL PROPERTY FOR FLOODWALL CONSTRUCTION ACCESS AT CAMPBELL AVENUE.JCPL WILL PROVIDE ALL MATERIALS DIRECTLY FOR THIS WORK.
Mar 5, 2026A00006$61.8KCONTRACT 4B, PORT MONMOUTH HURRICANE AND STORM DAMAGE REDUCTION. CONSTRUCTION OF FLOODWALLS, RETAINING WALLS, EARTHEN LEVEES, INTERIOR DRAINAGE FEATURES (SWALES, PONDING AREAS, DRAINAGE, PIPES), DEVELOPMENT OF PERMIT APPLICATIONS AND INCIDENTAL WORK.
Mar 4, 2026A00005$276.8KCONTRACT 4B, PORT MONMOUTH HURRICANE AND STORM DAMAGE REDUCTION. CONSTRUCTION OF FLOODWALLS, RETAINING WALLS, EARTHEN LEVEES, INTERIOR DRAINAGE FEATURES (SWALES, PONDING AREAS, DRAINAGE, PIPES), DEVELOPMENT OF PERMIT APPLICATIONS AND INCIDENTAL WORK.
Jan 22, 2026A00004$177.7KNS009 - WATER SAMPLING TO DELINEATE THE EXTENTS OF THE CONTAMINATED WATER. NS010 - NJDEP PERMIT ACQUISITION FOR CONTAMINATED WATER.NS011 - ADDITIONAL WATER SAMPLES TO DELINEATE THE EXTENTS OF THE CONTAMINATION WITHIN PROJECT LIMITS.
Dec 22, 2025A00003$285.3KCHANGE: NS006 TITLE: 38 WILLOW AVE. - SHED REPLACEMENT CHANGE: NS007 TITLE: TEMPORARY CHAIN-LINK FENCECHANGE: NS008 TITLE: EXPLORATORY SOIL BORING AND REPORTING
Sep 15, 2025A00002$23.3KFLOODWALL REFERENCE NO: A00002, R00002 NS002 VERIZON OVERHEAD UTILITY LINES NS003 TOMSA - HOZIZONTAL LINES
Aug 7, 2025A00001$443.8KFLOODWALL REFERENCE NO: A00001, R00001 NS004 LEVEE SUBBASE - SELECT GRANULAR FILL
May 2, 2025P00001$0PORT MONMOUTH CONTRACT 4B
Nov 21, 20240$61.9MPORT MONMOUTH FLOOD REDUCTION PROJECT

Estimated positioning window

Jan 28, 2027 – Jul 28, 2027

Recompete signal:
70/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 70/100. Available recorded signals: 65 points.

Contract end 2028-01-28 (453 days from calculation)
+25 points
4 historical awards in this buyer and category group
+15 points
15 recorded award transactions
+10 points
Latest award action: 2026-06-12
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.