Federal contract award
W912DS25C0001
PORT MONMOUTH FLOOD REDUCTION PROJECT
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W2SD ENDIST NEW YORK |
| NAICS | 237990 — Other Heavy and Civil Engineering Construction |
| PSC | Y1PZ — CONSTRUCTION OF OTHER NON-BUILDING FACILITIES |
| Parent award / vehicle | Not reported |
| Set-aside | SMALL BUSINESS SET ASIDE - TOTAL |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $71.2M |
| Current contract value | $71.2M |
| Potential contract value / ceiling | $72.6M |
| Start date | Nov 21, 2024 |
| Current end date | Jan 28, 2028 |
| Potential end date | Jan 28, 2028 |
| Latest award activity | Jun 12, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 15 of 15 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 12, 2026 | P00004 | $1.5M | RFP-0019 (NS#023), BROADWAY AVENUE DRAINAGE CONCRETE CULVERT CONCRETE ENCASEMENT IS NEEDED DUE TO LACK OF COVER IN THE ROADWAY CROSSING AT BROADWAY IN PORT MONMOUTH. |
| May 12, 2026 | P00003 | $400.0K | RFP-0019 (NS#023), BROADWAY AVENUE DRAINAGE CONCRETE CULVERT CONCRETE ENCASEMENT IS NEEDED DUE TO LACK OF COVER IN THE ROADWAY CROSSING AT BROADWAY IN PORT MONMOUTH. |
| Apr 24, 2026 | A00010 | $35.2K | RFP-0019 (NS#023), BROADWAY AVENUE DRAINAGE CONCRETE CULVERT CONCRETE ENCASEMENT IS NEEDED DUE TO LACK OF COVER IN THE ROADWAY CROSSING AT BROADWAY IN PORT MONMOUTH. |
| Apr 9, 2026 | P00002 | $3.6M | CAMPBELL AVENUE BRIDGE POLES AND WIRE TO BE REMOVED UP UNTIL JC2840MDT (RFP0017 PART2) 215881A55986 AND JC2840MDT TO BE DEADENED AND GUYED FOR DURATION OF CONSTRUCTION.POST CONSTRUCTION REQUIRES NEW POLES TO BE PLACED FOR JC-243MDT AND BT40189MDT |
| Apr 2, 2026 | A00009 | $431.6K | CAMPBELL AVENUE BRIDGE POLES AND WIRE TO BE REMOVED UP UNTIL JC2840MDT (RFP0017 PART2) 215881A55986 AND JC2840MDT TO BE DEADENED AND GUYED FOR DURATION OF CONSTRUCTION.POST CONSTRUCTION REQUIRES NEW POLES TO BE PLACED FOR JC-243MDT AND BT40189MDT |
| Mar 31, 2026 | A00008 | $246.2K | JCPL MATERIALS FOR PRIMARY RE-LOCATIONS REQUIRED TO SUPPLY POWER TO ROUTE 36 COMMERCIAL PROPERTY FOR FLOODWALL CONSTRUCTION ACCESS AT CAMPBELL AVENUE.JCPL WILL PROVIDE ALL MATERIALS DIRECTLY FOR THIS WORK. |
| Mar 13, 2026 | A00007 | $223.9K | JCPL MATERIALS FOR PRIMARY RE-LOCATIONS REQUIRED TO SUPPLY POWER TO ROUTE 36 COMMERCIAL PROPERTY FOR FLOODWALL CONSTRUCTION ACCESS AT CAMPBELL AVENUE.JCPL WILL PROVIDE ALL MATERIALS DIRECTLY FOR THIS WORK. |
| Mar 5, 2026 | A00006 | $61.8K | CONTRACT 4B, PORT MONMOUTH HURRICANE AND STORM DAMAGE REDUCTION. CONSTRUCTION OF FLOODWALLS, RETAINING WALLS, EARTHEN LEVEES, INTERIOR DRAINAGE FEATURES (SWALES, PONDING AREAS, DRAINAGE, PIPES), DEVELOPMENT OF PERMIT APPLICATIONS AND INCIDENTAL WORK. |
| Mar 4, 2026 | A00005 | $276.8K | CONTRACT 4B, PORT MONMOUTH HURRICANE AND STORM DAMAGE REDUCTION. CONSTRUCTION OF FLOODWALLS, RETAINING WALLS, EARTHEN LEVEES, INTERIOR DRAINAGE FEATURES (SWALES, PONDING AREAS, DRAINAGE, PIPES), DEVELOPMENT OF PERMIT APPLICATIONS AND INCIDENTAL WORK. |
| Jan 22, 2026 | A00004 | $177.7K | NS009 - WATER SAMPLING TO DELINEATE THE EXTENTS OF THE CONTAMINATED WATER. NS010 - NJDEP PERMIT ACQUISITION FOR CONTAMINATED WATER.NS011 - ADDITIONAL WATER SAMPLES TO DELINEATE THE EXTENTS OF THE CONTAMINATION WITHIN PROJECT LIMITS. |
| Dec 22, 2025 | A00003 | $285.3K | CHANGE: NS006 TITLE: 38 WILLOW AVE. - SHED REPLACEMENT CHANGE: NS007 TITLE: TEMPORARY CHAIN-LINK FENCECHANGE: NS008 TITLE: EXPLORATORY SOIL BORING AND REPORTING |
| Sep 15, 2025 | A00002 | $23.3K | FLOODWALL REFERENCE NO: A00002, R00002 NS002 VERIZON OVERHEAD UTILITY LINES NS003 TOMSA - HOZIZONTAL LINES |
| Aug 7, 2025 | A00001 | $443.8K | FLOODWALL REFERENCE NO: A00001, R00001 NS004 LEVEE SUBBASE - SELECT GRANULAR FILL |
| May 2, 2025 | P00001 | $0 | PORT MONMOUTH CONTRACT 4B |
| Nov 21, 2024 | 0 | $61.9M | PORT MONMOUTH FLOOD REDUCTION PROJECT |
Estimated positioning window
Jan 28, 2027 – Jul 28, 2027
70/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 70/100. Available recorded signals: 65 points.
- Contract end 2028-01-28 (453 days from calculation)
- +25 points
- 4 historical awards in this buyer and category group
- +15 points
- 15 recorded award transactions
- +10 points
- Latest award action: 2026-06-12
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.