Federal contract award
W912DS25CA019
A DESIGN-BID-BUILD CONSTRUCTION PROJECT FOR A BUILDING HOUSING AN OPERATIONAL FLIGHT TRAINER, SIMULATOR CONTROLS, MECHANICAL EQUIPMENT, BRIEFING ROOMS, OFFICES, BREAK ROOM AND BATHROOMS. DESIGN WILL BE BASED ON THE SIKORSKY PLANNING CHARRETTE REPORT.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Defense |
| Office | W2SD ENDIST NEW YORK |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Y1AZ — CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $13.1M |
| Current contract value | $13.2M |
| Potential contract value / ceiling | $13.3M |
| Start date | Oct 20, 2025 |
| Current end date | May 13, 2027 |
| Potential end date | May 13, 2027 |
| Latest award activity | Apr 16, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Apr 16, 2026 | P00002 | $0 | A DESIGN-BID-BUILD CONSTRUCTION PROJECT FOR A BUILDING HOUSING AN OPERATIONAL FLIGHT TRAINER, SIMULATOR CONTROLS, MECHANICAL EQUIPMENT, BRIEFING ROOMS, OFFICES, BREAK ROOM AND BATHROOMS. DESIGN WILL BE BASED ON THE SIKORSKY PLANNING CHARRETTE REPORT. |
| Feb 9, 2026 | A00001 | $-24.7K | A DESIGN-BID-BUILD CONSTRUCTION PROJECT FOR A BUILDING HOUSING AN OPERATIONAL FLIGHT TRAINER, SIMULATOR CONTROLS, MECHANICAL EQUIPMENT, BRIEFING ROOMS, OFFICES, BREAK ROOM AND BATHROOMS. DESIGN WILL BE BASED ON THE SIKORSKY PLANNING CHARRETTE REPORT. |
| Oct 23, 2025 | P00001 | $0 | A DESIGN-BID-BUILD CONSTRUCTION PROJECT FOR A BUILDING HOUSING AN OPERATIONAL FLIGHT TRAINER, SIMULATOR CONTROLS, MECHANICAL EQUIPMENT, BRIEFING ROOMS, OFFICES, BREAK ROOM AND BATHROOMS. DESIGN WILL BE BASED ON THE SIKORSKY PLANNING CHARRETTE REPORT. |
| Sep 29, 2025 | 0 | $13.0M | A DESIGN-BID-BUILD CONSTRUCTION PROJECT FOR A BUILDING HOUSING AN OPERATIONAL FLIGHT TRAINER, SIMULATOR CONTROLS, MECHANICAL EQUIPMENT, BRIEFING ROOMS, OFFICES, BREAK ROOM AND BATHROOMS. DESIGN WILL BE BASED ON THE SIKORSKY PLANNING CHARRETTE REPORT. |
Estimated positioning window
Nov 1, 2026 – Jan 30, 2027
70/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 70/100. Available recorded signals: 65 points.
- Contract end 2027-05-13 (193 days from calculation)
- +35 points
- 4 historical awards in this buyer and category group
- +15 points
- 4 recorded award transactions
- +10 points
- Latest award action: 2026-04-16
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.