Federal contract award

W912DW23C0013

DEMOLITION/REPAIR/CONSTRUCT WAREHOUSE SR

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW071 ENDIST SEATTLE
NAICS236220 — Commercial and Institutional Building Construction
PSCY1GZ — CONSTRUCTION OF OTHER WAREHOUSE BUILDINGS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$27.0M
Current contract value$27.0M
Potential contract value / ceiling$27.0M
Start dateJul 10, 2023
Current end dateJul 14, 2026
Potential end dateJul 14, 2026
Latest award activityMay 26, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 22 of 22 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 26, 2026A00013$-24.8KDESCOPE EXTERIOR GUARDRAIL FROM THE NORTH SIDE OF THE BUILDING
Apr 22, 2026A00012$94.4KREMOVE PREVIOUSLY PLACED AGGREGATE BASE FROM THE AREAS INDICATED ON THE ATTACHED MARKED UP DRAWINGS AND PLACE ROADWAY GEOSYNTHETIC DESCRIBED IN THE ATTACHED DOCUMENTS.
Apr 13, 2026A00011$199.1KREMOVE PREVIOUSLY PLACED AGGREGATE BASE FROM THE AREAS INDICATED ON THE ATTACHED MARKED UP DRAWINGS AND PLACE ROADWAY GEOSYNTHETIC DESCRIBED IN THE ATTACHED DOCUMENTS.
Mar 5, 2026P00009$0REMOVE PREVIOUSLY PLACED AGGREGATE BASE FROM THE AREAS INDICATED ON THE ATTACHED MARKED UP DRAWINGS AND PLACE ROADWAY GEOSYNTHETIC DESCRIBED IN THE ATTACHED DOCUMENTS.
Feb 20, 2026P00007$54.6KREMOVE PREVIOUSLY PLACED AGGREGATE BASE FROM THE AREAS INDICATED ON THE ATTACHED MARKED UP DRAWINGS AND PLACE ROADWAY GEOSYNTHETIC DESCRIBED IN THE ATTACHED DOCUMENTS.
Dec 12, 2025A00010$20.1KR00016 00026 ADD MAINTENANCE ACCESS DOOR00027 ADD EXTERIOR PAINTING00028 RELOCATE HIGH-BAY LIGHT FIXTURE00033 MODIFY DOOR 165
Sep 2, 2025A00009$291.7KDEMOLITION/REPAIR/CONSTRUCT WAREHOUSE SR. NO TIME EXTENSION.
Aug 27, 2025P00006$784.4KINCREASE ELECTRICAL SERVICE CAPACITY AND THE SCOPE OF RFP 0601 ADD TEMPORARY MAIN DISTRIBUTION APPLIED TO CLIN 0018.
Jul 23, 2025A00008$18.9KDEMOLITION/REPAIR/CONSTRUCT WAREHOUSE SR. NO TIME EXTENSION.
Jul 22, 2025P00005$0ADMIN MOD - CHANGE POP FORMAT FOR SYSTEM MIGRATION.
Apr 25, 2025A00007$206.6KDEMOLITION/REPAIR/CONSTRUCT WAREHOUSE SR. NO TIME EXTENSION.
Apr 11, 2025A00006$54.0KDEMOLITION/REPAIR/CONSTRUCT WAREHOUSE SR, CHANGE 00010 AND 00017, NO TIME.
Mar 24, 2025A00005$44.0KDEMOLITION/REPAIR/CONSTRUCT WAREHOUSE SR. NO TIME EXTENSION.
Mar 19, 2025A00004$151.7KDEMOLITION/REPAIR/CONSTRUCT WAREHOUSE SR. NO TIME EXTENSION.
Jan 28, 2025P00004$0DEOB PR&C ITEM 25, CLIN 0001 IN THE AMOUNT OF $1,047,140.00 FOR FUNDING CORRECTION. REOB ITEM 47 AND ITEM 49 IN THE AMOUNT OF $523,570.00 EACH FOR A TOTAL OF $1,047,140.00.
Jan 16, 2025P00003$1.0MDEMOLITION/REPAIR/CONSTRUCT WAREHOUSE SR. TIME EXTENSION 150 CDS
Jan 13, 2025A00003$81.9KDEMOLITION/REPAIR/CONSTRUCT WAREHOUSE SR. NO TIME ADDED.
Dec 31, 2024A00002$-1.2KDEMOLITION/REPAIR/CONSTRUCT WAREHOUSE SR. NO TIME ADDED.
Dec 18, 2024A00001$-481.7KDEMOLITION/REPAIR/CONSTRUCT WAREHOUSE SR. NO TIME ASSOCIATED.
Dec 4, 2024P00001$33.0KDEMOLITION/REPAIR/CONSTRUCT WAREHOUSE SR. NO TIME.
Dec 4, 2024P00002$241.8KDEMOLITION/REPAIR/CONSTRUCT WAREHOUSE SR. NO TIME WITH MOD.
Jul 11, 20230$24.2MDEMOLITION/REPAIR/CONSTRUCT WAREHOUSE SR