Federal contract award

W912DW25C0007

CJD PH SUMP PUMPS AND CONTROLS UPGRADE

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Defense
OfficeW071 ENDIST SEATTLE
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCY1PZ — CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$8.6M
Current contract value$9.3M
Potential contract value / ceiling$9.3M
Start dateFeb 15, 2025
Current end dateAug 1, 2027
Potential end dateAug 1, 2027
Latest award activityJun 3, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 9 of 9 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 3, 2026A00008$114.9KCABLE AND CONDUIT SCHEDULE REVISIONS CONTRACT FOR CJD POWERHOUSE SUMP PUMP CONTROLS AT BRIDGEPORT, WAREFERENCE NO. R00004THIS IS A MODIFICATION TO W912DW25C0007A00005 TO OBLIGATE FUNDING TO CLIN 1003.
Mar 10, 2026A00007$50.0KCABLE AND CONDUIT SCHEDULE REVISIONS CONTRACT FOR CJD POWERHOUSE SUMP PUMP CONTROLS AT BRIDGEPORT, WAREFERENCE NO. R00004THIS IS A MODIFICATION TO W912DW25C0007A00005 TO OBLIGATE FUNDING TO CLIN 1003.
Jan 28, 2026A00006$127.9KCABLE AND CONDUIT SCHEDULE REVISIONS CONTRACT FOR CJD POWERHOUSE SUMP PUMP CONTROLS AT BRIDGEPORT, WAREFERENCE NO. R00004THIS IS A MODIFICATION TO W912DW25C0007A00005 TO OBLIGATE FUNDING TO CLIN 1003.
Jan 15, 2026A00005$0CABLE AND CONDUIT SCHEDULE REVISIONS CONTRACT FOR CJD POWERHOUSE SUMP PUMP CONTROLS AT BRIDGEPORT, WAREFERENCE NO. R00004
Nov 12, 2025P00003$4.9MCJD POWERHOUSE SUMP PUMPS AND CONTROLS
Oct 16, 2025A00001$99.0KSP002 REMOVE GFE FROM PLC EQUIPMENT CONTRACT FOR CJD POWERHOUSE SUMP PUMP & CONTROLS AT BRIDGEPORT, WA REFERENCE NO. R00002
Sep 25, 2025P00002$591.5KSP001 REPLACE CQ01 CONTRACT FOR CJD POWERHOUSE SUMP PUMP & CONTROLS AT BRIDGEPORT, WA REFERENCE NO. R00001
Jun 9, 2025P00001$0INSTALL PUMPS AND PIPING
Jan 29, 20250$2.6MCJD PH SUMP PUMPS AND CONTROLS UPGRADE

Estimated positioning window

Oct 25, 2026 – Feb 1, 2027

Recompete signal:
80/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 80/100. Available recorded signals: 75 points.

Contract end 2027-08-01 (280 days from calculation)
+35 points
20 historical awards in this buyer and category group
+15 points
9 recorded award transactions
+10 points
Latest award action: 2026-06-03
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.